Tender For Annual Maintenance Of Trolly Gate , Solar Fencing ,Solar Power Plant At Aste And Comprehensive Maintenance Of Ups System And Servo Voltage Stabilizer At Various Location Under Ge (Af) Marathalli
Tender Value
44.98 Lakhs
Estimated cost
Bid Submission
06 Oct 2026
17 days left
EMD
90000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bengaluru Urban → Karnataka
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Maintenance Of Trolly Gate , Solar Fencing ,Solar Power Plant At Aste And Comprehensive Maintenance Of Ups System And Servo Voltage Stabilizer At Various Location Under Ge (Af) Marathalli
BOQ
| Sl. No. | Item Description |
| 1 | Comprehensive maintenance of UPS 3 KVA (03 Nos) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint (iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts.Note :- 03 Nos UPS of 3 KVA will be measured as one job. |
| 2 | Comprehensive maintenance of UPS 4 to 5 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint (iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts. |
| 3 | Comprehensive maintenance of UPS 6 to 8 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint (iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts. |
| 4 | Comprehensive maintenance of UPS 10 KVA (04 Nos) any make at various location with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint(iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts.Note :- (i) 04 Nos UPS of 10 KVA will be measured as one job. |
| 5 | Comprehensive maintenance of UPS 15 KVA (01 No) any make at various location with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint .(iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts. |
| 6 | Comprehensive maintenance of UPS 20 KVA (02 Nos) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge .(ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint(iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts.Note :- (i) 02 Nos UPS of 20 KVA will be measured as one job. |
| 7 | Comprehensive maintenance of UPS 30 KVA (02 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) Theservice report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint (iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts.Note :- (i) 02 Nos of UPS of 30 KVA will be measured as one job. |
| 8 | Comprehensive maintenance of UPS 60 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The quarterly service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint (iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts. |
| 9 | Comprehensive maintenance of UPS 80 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by Engr-in-Charge. Note :-(i) The service report shall be submit to the Engr-in-Charge (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint.(iii) The Battery will be measured and paid seperately.(iv) The rate inclusive of all defects parts. |
| 10 | Repair and maintenance of servo voltage stabilizer oil cooled/Air cooled 1 KVA to 15 KVA any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule all as directed by Engr-in-Charge. Note : (i) The service report shall be submit to Engr-in-Charge (ii) Parts to be measured and paid seperately. |
| 11 | Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 16 KVA to 50 KVA any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule all as directed by Engr-in-Charge. Note : (i) The service report shall be submit to Engr-in-Charge duly signed.(ii) Parts to be measured and paid seperately. |
| 12 | Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 55 KVA to 100 KVA (03 Nos) any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule all as directed by Engr-in-Charge. Note : (i) The service report shall be submit to Engr-in-Charge (ii) Parts to be measured and paid seperately. |
| 13 | Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 100 KVA to 500 KVA any make at various locationswith complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule are i all as directed by Engr-in-Charge. Note : (i) The service report shall be submit to Engr-in-Charge (ii) Parts to be measured and paid seperately. |
| 14 | Ref above Sl item No 1 to 13 Auto transformer of any capacity(a) Auto Transformer 2 /4/6/8/10 Amps |
| 15 | (b) Auto Transformer 12/15/18/20 Amps |
| 16 | (c) Auto Transformer 23/28 Amps |
| 17 | (d) Auto Transformer 32/35 Amps |
| 18 | Ref above sl item No 1 TO 13 Buck Boost Tx of any capacity(a) Buck Boost Tx 2/4/6/8/10 Amps |
| 19 | (b) Buck Boost Tx 12/15/18/20 Amps |
| 20 | (c) Buck Boost Tx 23/28 Amps |
| 21 | (d) Buck Boost Tx 35/45 Amps |
| 22 | (e) Buck Boost Tx 60/100 Amps |
| 23 | Ref above Sl item No 1 TO 13 Control transformer of any capacity(a) Control transformer PS Sensing Tx |
| 24 | (b) Control transformer Ph Re Sensing 3 Ph Tx |
| 25 | (c) Control Transformer DPS Sensing Tx (each) |
| 26 | (d) Control Transformer DC Motor sensing Tx |
| 27 | Ref above Sl item No 1 TO 13 Meters of any capacity(a) 0-300 v local 72 Sqmm |
| 28 | (b) 0-500 v local 96 sqmm |
| 29 | (c) 0-300 Voltmeter AE 72 Sqmm |
| 30 | (d) 0-500 Voltmeter AE 96 Sqmm |
| 31 | (e) DPM Volt & Amp Meter |
| 32 | (f) CT Coils |
| 33 | Ref above Sl item No 1 TO 13 Carbon Brushes of any capacity(a) Carbon Brush upto 30k/75k |
| 34 | (b) Carbon Brush upto 200k |
| 35 | Ref above Sl item No 1 to 13PCBs of any capacity(a) 2K2R & 2K5R PCB |
| 36 | (b) SCVS2 PCB |
| 37 | (c) DGDPS Control PCB |
| 38 | (d) Phase reversal PCB |
| 39 | (e) E Over load PCB |
| 40 | (f) D C Motor contrl PCB |
| 41 | (g) 3 Phase cutoff PCB |
| 42 | (h) 3mm LED strip 5 lights |
| 43 | (j) 2K2/2K5 Control PCB |
| 44 | (k) 5/ 10 mm LED strip |
| 45 | (l) DPS LED PCBS |
| 46 | (m) 2K6R New control PCB |
| 47 | (n) LED Strips |
| 48 | Ref above Sl item No 1 TO 13 Motors (DC & AC) of any capacity(a) 12V DC Motor Big |
| 49 | (b) 3Kg Stepper Motor |
| 50 | (c) 10 Kg Stepper Motor |
| 51 | (d) 3Kg/10 kg RC Network |
| 52 | Ref above Sl item No 1to 13 Control switches of any capacity(a) SPST Switch (I&D) |
| 53 | (b) DPDT Switch (A.M) |
| 54 | (c) Spring loaded switch |
| 55 | (d) Salzer switch (A&V) |
| 56 | (e) Pot meter 1K Ohms |
| 57 | (f) Surg/Spike Sentry Box |
| 58 | Ref above Sl item No 1 to 13 Coupling gears of any capacity(a) Main gear upto 30/75/80 kva |
| 59 | (b) Pinon Gears (8 & 10mm) |
| 60 | Ref above Sl item No 12 to 15 Electricity Components of any capacity(a) BT-136 TRAIC |
| 61 | (b) IC 741 & 555 BEL |
| 62 | Ref above Sl item No 1 to 13 Connectors of any capacity(a) 8 way Blank type |
| 63 | (b) 22 pin Edge connectors |
| 64 | (c) PCB connector |
| 65 | (d) 4 way connector |
| 66 | Taking out the sample of isolation transformer oil from bottom of each items installed at various locations for checking die elecric strength & acidity test of oil and carrying out dehydration (Filtration) of cooling/ insulating oil of LT switch gears through straight line oil filtration plant for removing carbon deposit, extracting moisture content etc. After filtration, the oil shall withstand 40 KV for one minute die electric strength. Die elecric strength & acidity to be tested before and after filtration and submit the test results all as specified and directed by Engr-in-Charge. |
| 67 | Supply only insulating /cooling oil suitable for isolation transformers / switch gear etc having die electric strength of more than 40 KV for filling / topping up complete all as specified and as directed by Engr-in-Charge. |
| 68 | Taking down electrical chimney filter for cleaning and reassembling complete including testing and commissioning to the entire satisfaction of complete all as specified and as directed by Engr-in-Charge. |
| 69 | Material only for battery 42 AH alongwith necessary suitable fitting complete all as specified and directed by Engr-in-Charge. |
| 70 | Material only for battery 26 AH alongwith necessary suitable fitting complete all as specified and directed by Engr-in-Charge. |
| 71 | Material only for battery 75 AH alongwith necessary suitable fitting complete all as specified and directed by Engr-in-Charge. |
| 72 | Material only for battery 65 AH alongwith necessary suitable fitting all as directed by Engr-in-Charge. |
| 73 | Repair and maint of isolation transformer upto 250 KVA drain out old oil and after filtration the oil and checking the winding of transformer and refilling the same after rectified the problem and change the parts all as specified and directed by Engr-in-Charge. |
| 74 | Supply socket wrench set i.e Bit sockets :SL 4,5,6 Ph 1,2,3,Pz1,2,3,Hex 3,4,5,6,7,8,T10,15,20,25,30,40,1/4\\"DRSockets:4,4.5,5,5.5,6,7,8,9,10,11,12,13,14mm ,Hex key wrenches 1.5,2,2.5 mm,1/4\\"DR universal joint ,1/4\\" X2\\" extension bar ,1/4 \\"X6\\" flexible extension ,1/4 \\"DRsliding bar 1/4\\" quick ratchet handle ,6\\" spinner handle ,Bit adaptor ,blow case along with box complete all as directed by EIC |
| 75 | Supply tool box with 1 hand saw,bit set SL 1/8,SL3/16,SL 1/4,PH1,PH2,T15,T20,H1/8,H5/32,Adaptor ,9 W LED flashlight ,precision screwddrivers PH1,PHO slotted 1.6 mm,2.o mm ,5m insulation tape ,measuring taoe,adjustable wrench,hammer,nose pler,combination plier,bit driver,tester knife ,1/4 Dr socket etc complete all as directed by EIC |
| 76 | Supply BD40 cordless smart screwdriver ,microusb charger with cable ,manual orecision bit holder,screwdriver bits along with multimeter complete all as directed by EIC |
| 77 | Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 95 Sq.mm, 3.5 core including taking down existing cable complete all as specified. |
| 78 | Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 150 Sq.mm, 3.5 core including taking down existing cable complete all as specified. |
| 79 | Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 50 sqmm 3.5 core including taking down existing cable complete all as specified. |
| 80 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth, not exceeding 10 sq m on plan and getting out in any type of soil (i.e. soft/loose soil or hard/dense soil) complete all as specified. |
| 81 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils. |
| 82 | Removal of surplus soil to a distance not exceeding 50 m and deposited where directed at a level not exceeding 1.5 m above the starting point complete all as specified. |
| 83 | S&F 50 mm bore GI tubing light grade including necessary fittings such as bend, tee, elbow etc complete in trenches/ on wall complete all as specified. |
| 84 | Supply and laying unreinforced pre cast concrete cable cover class LV type I flat size 250 x 150 x 40 mm for cable protection |
| 85 | Supply and spreading fine river sand in trenches for cushioning of under ground cable all as directed by Engr-in-Charge at site Note:- Only punned thickness 18 cm will be measured and paid . |
| 86 | Disconnection UNSV Supply ,fixing ,testing UPS 1000 VA Complete all as specified and as directed by EIC |
| 87 | Disconnection & Supply ,fixing Battery 12 Volts. 180 AH |
| 88 | Disconnection ,Supply,testing.commissioning of JIELONG roller shutter motor of model no ECR168-1P-(300),single phase 220 V AC,50 Hz,,Power 250 W,weighting load 300 Kg ,IP44,complete all as specified and as directed. |
| 89 | Taking Old Supply testing and commissioning of Split AC 1.5 TR only Indoor unit along with copper pipe complete all as specifed and as directed by EIC |
| 90 | Taking Old Supply testing and commissioning of Split AC 1.5 TR only Outdoor unit along with outdoor stand complete all as specifed and as directed by EIC Please Enable Macros to View BoQ information |
| 91 | Taking Old Supply testing and commissioning of Split AC 1.5 TR only Outdoor unit along with outdoor stand complete all as specifed and as directed by EIC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender