Bids Are invited for Automated External Defibrillator - Should Be Light Weight, Easy To Use Defibrillator With Aed. , Should Have Biphasic Waveform For Defibrillation Therapy. , Should Defibrillate Through Pads. , Charge Time: Less Than 10 Seconds To
Tender Overview
Project Description
Bids Are invited for Automated External Defibrillator - Should Be Light Weight, Easy To Use Defibrillator With Aed. , Should Have Biphasic Waveform For Defibrillation Therapy. , Should Defibrillate Through Pads. , Charge Time: Less Than 10 Seconds To 200J. , Should Have Capacity To Defibrillate Infant/ Paediatric Patients , Should Have Internal Battery With Capacity Of 200 Shocks Or Upto 10 Hours Of Operating Time , Shall Provide All Standard Accessories, Both Adult & Paediatric. , General Terms: , Training: , Local Service Support: Should Have Local Office And Service Support/Service Engineer For Attending The Breakdown Calls. Details To Be Submitted. , Response Time: Should Not Be More Than 06 Hrs From Lodging A Breakdown Complaint On Toll Free Or By Email. , Warranty- 2 Years , Cmc- Cost Per Annum Will Be Considered For All Bidders For 8 Years After Warranty , Warranty And Cmc Should Include A) Two Preventive Maintenance And Unlimited Breakdown Calls Along With Spares.B) All Bought Out Items Quoted Along With The Main System (Local/Non-Local) And Ups Should Be Covered. C) Yearly Calibration/Validation/Qa, Testing And Measuring Equipment Used Should Be Traceable To Si Units Through National/ International Standards (As Per Nabl/Nabh Norms). D) Pm Kit If Any. E) All Upgrades/Update, No Seperate Licence Fees Will Be Payable. , Back To Back Assurance To Be Taken By The Supplier From Oem To Supply Spares For Minimum 10 Years And To Be Submitted. , Penalty Clause:
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Should be light weight, easy to use defibrillator with AED. | Should be light weight, easy to use defibrillator with AED. |
| 2 | Should have biphasic waveform for defibrillation therapy. | Should have biphasic waveform for defibrillation therapy. |
| 3 | Should defibrillate through pads. | Should defibrillate through pads. |
| 4 | Charge Time: Less than 10 seconds to 200J. | Charge Time: Less than 10 seconds to 200J. |
| 5 | Should have capacity to defibrillate infant/ paediatric patients | Should have capacity to defibrillate infant/ paediatric patients |
| 6 | Should have internal battery with capacity of 200 shocks or upto 10 hours of operating time | Should have internal battery with capacity of 200 shocks or upto 10 hours of operating time |
| 7 | Shall provide all standard accessories, both adult & paediatric. | Shall provide all standard accessories, both adult & paediatric. |
| 8 | General terms: | General terms: |
| 9 | Training: | Training: |
| 10 | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. |
| 11 | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. |
| 12 | Warranty- 2 years | Warranty- 2 years |
| 13 | CMC- cost per annum will be considered for all bidders for 8 years after warranty | CMC- cost per annum will be considered for all bidders for 8 years after warranty |
| 14 | Warranty and CMC Should include a) two preventive maintenance and unlimited breakdown calls along with spares.b) All bought out items quoted along with the main system (local/non-local) and UPS should be covered. c) Yearly calibration/Validation/QA, Testing and measuring equipment used should be traceable to SI units through National/ International standards (as per NABL/NABH norms). d) PM kit if any. e) All upgrades/update, no seperate licence fees will be payable. | Warranty and CMC Should include a) two preventive maintenance and unlimited breakdown calls along with spares.b) All bought out items quoted along with the main system (local/non-local) and UPS should be covered. c) Yearly calibration/Validation/QA, Testing and measuring equipment used should be traceable to SI units through National/ International standards (as per NABL/NABH norms). d) PM kit if any. e) All upgrades/update, no seperate licence fees will be payable. |
| 15 | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. |
| 16 | Penalty Clause: | Penalty Clause: |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender