Tender For Est. Providing Replacement Of Existing Mortuary Refrigeration Room With Ss Racks For Old Mortuary Building At Sir J.J Group Of Hospitals Compound , Byculla,Mumbai.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
22 Sep 2026
6 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Est. Providing Replacement Of Existing Mortuary Refrigeration Room With Ss Racks For Old Mortuary Building At Sir J.J Group Of Hospitals Compound , Byculla,Mumbai.
BOQ
| Sl. No. | Item Description |
| 1 | Fresh Body Cold RoomSupply & erection of 80 mm thick PUFF insulated internal Panels in the mortuary cold- room of non-corrosive 304 grade Stainless. The SS panels will be sandwiched PUFF insulated of 80 MM thick having density 40kg/M3 including Camlocks. Both side covered by 0.5 MM thick SS sheet of 304 grade. It will be having heat resistance capacity as well as enabling washing & cleaning the cold-room internally. |
| 2 | D-composed Body Cold RoomSupply & erection of 80 mm thick PUFF insulated internal Panels in the mortuary cold- room of non-corrosive 304 grade Stainless. The SS panels will be sandwiched PUFF insulated of 80 MM thick having density 40kg/M3 including Camlocks. Both side covered by 0.5 MM thick SS sheet of 304 grade. It will be having heat resistance capacity as well as enabling washing & cleaning the cold-room internally. |
| 3 | Stainless steel Morgue Door: Supply & erection of 1.060Mtr. W X 2.000 Mtr. height SS Sliding Door with 100% Air tight arrangement having 100 MM thickness , made from (SS 304 sheet) sandwich PUFF insulated. Each door will be having Heavy duty Stainless steel Hinges, handles, Door Gaskets etc. |
| 4 | Air-cooled condensing units: (Fresh Body Area) Refrigeration Units of aggregate capacity 20 TR (72000 BTU/Hr.) each consists of Scroll compressor (Emerson or Similar make), Air-cooled Blue finned copper Cond. Coil of Kuler / Guntner make of 1 fin/ 4 mm, of Max. operating pressure 32 bar, along with drive package like single phase motor with Fan blade, Suction Accumulator, Service Valves & PLC Control’s etc. with 100 % standby arrangement working on R404A Ref.The approx. power consumption will be 2.3 Kw/Hr. The weight of the Cond. . Unit will be 300 Kg. / Unit. Set Of ( 2 X 11 TR Aircoold oudoor unit per System) |
| 5 | Air-cooled condensing units: (De-composed Body Area) Refrigeration Units of aggregate capacity 8 TR (3800 BTU/Hr.) each consists of Scroll compressor (Emerson or Similar make), Air-cooled Blue finned copper Cond. Coil of Kuler / Guntner make of 1 fin/ 4 mm, of Max. operating pressure 32 bar, along with drive package like single phase motor with Fan blade, Suction Accumulator, Service Valves & PLC Control’s etc. with 100 % standby arrangement working on R404A Ref.The approx. power consumption will be 2.3 Kw/Hr. The weight of the Cond. Unit will be 240Kg. / Unit. |
| 6 | Supply, erection, testing & Commissioning of floor mounted Evaporative Units for Fresh Body Morgue Room. The outer skin will be of 0.63 mm Pre coated GSS, Inner skin will be of 0.63 mm Plain SS with 80 MM thick sandwiched PUFF insulated panel AHU consisting of 8000 CFM, 75 MM static Axial Fans & Electronic defrostic system. The Evaporator section will be consisting of 6 Row Dx cooling coil complete with Expansion valve, drier core, distributer, Sporlan Dx Expansion valves with Power elemnt suitable to work with R 404 refrigerent. The Axial fan motor will be of TEFC 7.5 HP/230 Volts50 HZ. The Evaporator is designed to achieve 0 Deg. Cent.( +/- 2 Deg. C.)Temperature In Room. The AHU consists of Supply Air connection & Mixing Box for & Return Air. |
| 7 | Supply, erection, testing & Commissioning of floor mounted Evaporative Units for Fresh Body Morgue Room. The outer skin will be of 0.63 mm Pre coated GSS, Inner skin will be of 0.63 mm Plain SS with 80 MM thick sandwiched PUFF insulated panel AHU consisting of 3200 CFM, 75 mm static Axial Fans & Electronic defrostic system. The Evaporator section will be consisting of 6 Row Dx cooling coil complete with Expansion valve, drier core, distributer, Sporlan Dx Expansion valves with Power elemnt suitable to work with R 404A refrigerent. The Axial fan motor will be of TEFC 2 HP/230 Volts50 HZ. The Evaporator is designed to achieve 0 Deg. Cent.( 0 Deg. C.)Temperature In Room. The AHU consists of Supply Air connection & Mixing Box for & Return Air. |
| 8 | Stainless Steel make (304 grades) Tray 3 tier Rack for storing of 3 Body in each rack. The Overall dimensions of the Rack will be 2000 X 700 X 1676 MM H. The Rack will be fabricated with SS Angle size 40 x 40 x1.6 MM equipped with 100 MM dia. Heavy duty industrial wheel with stopper arrangement to move the rack in the Mortuary for cleaning purpose. The Tray will be removable type to enable easy shifting of body from the tray. The SS Heavy duty C channel will be provided into rack as travel rail for the SS tray for smooth movement of Trays in the racks. |
| 9 | Stainless Steel make (304 grades) Tray 3 tier Rack for storing of 3 Body in each rack. The Overall dimensions of the Rack will be 2000 X 800 X 1676 MM H. The Rack will be equipped 100 MM dia. Heavy duty industrial wheel with stopper arrangement to move the rack in the Mortuary for cleaning purpose. The Tray will be removable type to enable easy shifting of body from the tray. The SS Heavy duty C channel will be provided into rack as travel rail for the SS tray for smooth movement of Trays in the racksfor easy & smooth movement of Trays in the racks. |
| 10 | Providing & installing Hydraulic Trolley for movement of Dead Body in morgue as per following Tech. Specifications.Hydraulic Lift Trolley Size : It shall be made of SS-304 grade sections & sheets having overall size 2032 mm× 610 mm × 2103 mm.(+/-10 mm variations)Load carrying Capacity: 250 Kgs. Finish: Matt Polish SS.Construction : SS 304 Complete structure (except Hydraulic Pump & Castors)SS Sections used: box pipes (50mm x 25mm), round pipes (25mm dia), flats as required. 2.Platform for Stretcher: Open-type to suit the above stretchers.Lifting System: Stretcher is lifted by a single acting hydraulic cylinder manually by a Foot pump. 3.The Foot-pump : It should be made of Mild Steel and is duly Nickel chrome Plated for long life. 4. Lowering System: By Foot-operated Release pedal. The Stretcher will rest at Lowest level 5. Fully Lowered Platform Height: 450 mm. (Approx). 6.Fully Lifted Platform Height: 1600 mm. (Approx). Wheels: The Trolley is easily maneuvered by Steering on 2 nos. Swivel Castors with 125mm Ø x 50mm width ball bearing Polymer-PU bonded Wheels fitted at the rear end. At the front end, there are 2 nos. Fixed Castors of same size & type. Operating system: The Trolley having 1 no. empty stretcher placed on the platform can be taken to the site as required with ease. The Trolley then needs to be locked in position by using the floor lock provided near the handle. The cadaver shall be kept on the trolley stretcher manually. The trolley can now be taken to the Mortuary cold room for storing. On reaching the place, the stretcher has to be raised /lowered to required height by Manual- Hydraulic Foot-pump. Once the stretcher is in the line with the channels of the rack, the stretcher can be pushed in place from the trolley platform to rack with easy movement. The Platform can now be lowered by operating the Pressure Releasing Switch, thus trolley is ready for other . |
| 11 | Supplying and fixining of accoustic insulation inside ducting with arma sound 10 mm thick insulation to avoide the sound . |
| 12 | Carrying out Insulation of Supply & return air ducting of Morgue with Aroflex / K-flex class “O” insulation of 50 MM thick for fabrication of Plenum for the supply & Return air GI ducting of the morgue. |
| 13 | Supplying and carrying out 26 SWG Aluminium cladding over the supply and return air ducting complete groving and drilling bending cutting as per standard etc.. |
| 14 | Supply and installation of aluminum powder coated diffusers as specified and complete with collar Dampers in the Mortuary cold room. Having Neck Size 300 x 300 mm |
| 15 | Supply, installation, testing and commissioning of manually operated, opposed blade, duct mounted, flanged volume control dampers of required sizes in SS construction to avoid rusting and corrosion of damper handle to oparate smooth in long time with operating mechanism, mounting arrangement, rubber refrigerant kits etc. complete. |
| 16 | Supplying and fixing of motor for damper to stop the air flow of AHU which is in stand by and vise versa |
| 17 | Supplying and erecting SS powder coated linear perforated grill to avoid rusting and corrosion of grill of suitable size for width length without collar dampers having matching colour with the existing false ceiling and suitable for deflection of 15/30/45°. |
| 18 | The surface of the flooring will be first covered with tarfelt of 2 mm thickness, and then insulated by 80 MM Puff insulation layer covered with 20 micron aluminum foil. Then entire surface will be covered with hot bitumen. And finally entire floor surface will be finished with KOTA Stones. |
| 19 | Providing & installing of Russell make or similar air curtain of 6 feet width having air throw velocity of 21 m/sec, low noise level up to 38 to46 dB suitable for door height upto 9 feet to avoid air escaping from the cold room. |
| 20 | Dismantling existing mortuary complete with its accessoris like compressor, motors, AHU, along with cooling coil bod motor blower drain pan FCU, Control Panel etc & making the site clear. |
| 21 | Providing Shed for Covering ODU And accessories kept outside the plant areas. Providing Minimum 8 mtr ( Wide x 6 mtr ( Length) x 4 mtr ( Height ) Shed with support of minimum 8 Nos of size 100 x 75 x 6 mm channel duly grouted in ground with PCC Block Horizontal frames of min 50 x 50 x6 mm thick angle irons frames Covered with GI Corrugated minimum 16 SWG GI Sheet clamped with propoer support of M.S. angles and Hooks .The Entire shed shall be painted with 2 coats of red oxide and two coats of epoxy paints . |
| 22 | VFDs-Variable Frequency DrivesSupply, installation, testing & commissioning of VFDs.VFD designed for HVAC applications with built-in PID controller, control panel (keypad & display) , IP-65 enclosure (for outdoor applications) & IP-20 enclosure (for indoor applications) for use on AHU fans. The display should be in alpha-numeric characters and programming facility should be in user-friendly HVAC terminology. VFD’s shall have built-in harmonic filters with THDI less than 5%. No. VFD panel to be provided with digital display showing electrical parameters like voltage, current and power consumption. No. VFD shall be installed in a dedicated external/internal enclosure and the inter connecting wires between driver and MCC shall be included. Necessary transformer, power adapters, sensors, relay etc. as required for satisfactory operation shall be in the scope of VFD supplier. It should be BMS Compatible. 7.5 HP/ 5.6 KW |
| 23 | Supply, installation and testing of under deck Insulation with 75mm thick extruded polystyerene of destiny 48 kg/m3 and along with all ancillary work as detailed in the specification. Installation of the insulation shall be done by the HVAC contractor in co-odination with the water-proofing contractor. |
| 24 | Supplying installation of PVC non corrossive type Mist ELIMINATOR in the AHU to remove the water droplet particals from the supply air to avoid to tranfer of moisture and water droplets to the motor |
| 25 | Providing & erecting of Micro-processor based Digital temperature display Indicating exact Room Temperature in the Morgue Room. The display shall be placed at the passage area |
| 26 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel wirearmoured (round) cable 1100 V, 6 core 1.5 sq. mm. copper conductor completeerected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipeas per specification no. CB-LT/CU. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender