Tender For Reconstruction Work Of Sawayajpur To Masjid And 5 Years Maintenance Work.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Sep 2026
9 days left
EMD
1.08 Lakhs
Bank guarantee accepted
Document Fee
857
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hardoi → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Reconstruction Work Of Sawayajpur To Masjid And 5 Years Maintenance Work.
BOQ
| Sl. No. | Item Description |
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means (Rates are Including Labour Cess but Excluding GST) |
| 2 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Rates are Including Labour Cess but Excluding GST) |
| 3 | Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Rates are Including Labour Cess but Excluding GST) |
| 4 | P.C.C.1:3:6 in FoundationProviding concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Rates are Including Labour Cess but Excluding GST) |
| 5 | Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Rates are Including Labour Cess but Excluding GST) |
| 6 | PCC Grade M 20Providing concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specifications clauses 802,803,1202&1203 (Rates are Including Labour Cess but Excluding GST) |
| 7 | Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure / superstracutre as per technical specification clauses 613.4 & 1204 (Rates are Including Labour Cess but Excluding GST) |
| 8 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion maintenance @ 0.25 % for CC |
| 9 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 3rd Year after the Actual Date of Completion maintenance @ 0.50 % for CC |
| 10 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 4th Year after the Actual Date of Completion maintenance @ 0.75 % for CC |
| 11 | Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 5th Year after the Actual Date of Completion maintenance @ 1.00 % for CC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysSep 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender