Tender For New Construction Of Kasganj Atrauli Road To Bamba Patri Satpura Mafi Via Jahangirpur
Tender Value
1.46 Crore
Estimated cost
Bid Submission
30 Sep 2026
14 days left
EMD
9.34 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kasganj → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Of Kasganj Atrauli Road To Bamba Patri Satpura Mafi Via Jahangirpur
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Subgrade and earthen shoulders with approved Material Obtained from Borrow Pits with all lift and leads transporting to site, Spreasing to grading to required Slop and Compacted to meet requirement of Tables 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.1 |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. / Excavation for roadwork in soil with hydraulic excavator of cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | (Cement Treated Sub base) providing, laying and spreading in uniform layers with motor grader on a prepared sub grade/Sub base, Cement @ 2% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST. |
| 5 | (Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST. |
| 6 | Providing and applying tack coat with Bitumen VG-10 grade pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using V.G.-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per technical specification clause 508. |
| 8 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 |
| 9 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ii)Ordinary Kilometer Stone (Precast) |
| 10 | Hecto mter Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 iii)200 m stone (precast) |
| 11 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. / Excavation for roadwork in soil with hydraulic excavator of cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. |
| 12 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 / Rate as per item No.11.4 of Chapter 11 |
| 13 | Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11 |
| 14 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / 600 mm dia |
| 15 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification / Rate as per item No.12.3 of Chapter 12 |
| 16 | White washing with lime on undecorated wall surfaces (Three coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters.. as per DSR 13.37.1 |
| 17 | 05 Year Maintenance ChargeRoutine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year |
| 18 | Maintenance for 2nd Year at Cost of Total Execute Work |
| 19 | Maintenance for 3rd Year at Cost of Total Execute Work |
| 20 | Maintenance for 4th Year at Cost of Total Execute Work |
| 21 | Maintenance for 5th Year at Cost of Total Execute Work Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysSep 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.