Bids Are invited for Custom Bid For Services - Emergency Dg Bus Duct Rev Ing Work - Dismantling Of The Existing Bus Duct Enclosure As Per The Enclosed Drawing And Scope Of Work. , Dismantling Of Existing Bus Bars From Bus Duct For The Purpose Of Prov
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Emergency Dg Bus Duct Rev Ing Work - Dismantling Of The Existing Bus Duct Enclosure As Per The Enclosed Drawing And Scope Of Work. , Dismantling Of Existing Bus Bars From Bus Duct For The Purpose Of Providing New Sleeves. Bus Bar Arrangement: Phase : 4 Runs × 6 × 1/4 Aluminium; Neutral : 2 Runs × 6 × 1/4 Aluminium. , Removing Existing Insulation Sleeves Of Existing Bus Bars And Installing New Sleeves On The Same. Bus Bar Arrangement: Phase : 4 Runs × 6 × 1/4 Aluminium; Neutral : 2 Runs × 6 × 1/4 Aluminium. , Supply And Fixing Of Bus Duct Enclosure Ms Supports , Fabrication, Supply, And Installation Of Lt Bus Duct Enclosure Complete In All Respects, In Accordance With The Enclosed Drawings And Specified Scope Of Work. , Supply And Fixing Of Bus Bar Finger Supports At Intervals Of One Metre Or As Required To Provide Adequate Mechanical Support For The Bus Bars After Completion Of The Insulating Sleeving Work. The Finger Supports Shall Be Suitable For Mounting And Securely Supporting The Bus Bars Of The Dimensions Specified Under Line Item No. 2, Ensuring Proper Alignment, Stability, And Electrical Clearance. , Re-Installation And Assembly Of The Complete Set Of Bus Bars Fitted With New Insulating Sleeves Inside The Bus Duct, Restoring The Bus Bar Arrangement, Alignment, Clearances, Supports, And All Associated Hardware To Their Original Condition. Also Includes Painting Of Entire Bus Duct And Providing Space Heaters
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 15-Sep-2026 | 06-Oct-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Dismantling of the existing bus duct enclosure as per the enclosed drawing and scope of work. | Dismantling of the existing bus duct enclosure as per the enclosed drawing and scope of work. |
| 2 | Dismantling of existing bus bars from bus duct for the purpose of providing new sleeves. Bus bar arrangement: Phase : 4 runs × 6\\" × 1/4\\" Aluminium; Neutral : 2 runs × 6\\" × 1/4\\" Aluminium. | Dismantling of existing bus bars from bus duct for the purpose of providing new sleeves. Bus bar arrangement: Phase : 4 runs × 6\\" × 1/4\\" Aluminium; Neutral : 2 runs × 6\\" × 1/4\\" Aluminium. |
| 3 | Removing existing insulation sleeves of existing bus bars and installing new sleeves on the same. Bus bar arrangement: Phase : 4 runs × 6\\" × 1/4\\" Aluminium; Neutral : 2 runs × 6\\" × 1/4\\" Aluminium. | Removing existing insulation sleeves of existing bus bars and installing new sleeves on the same. Bus bar arrangement: Phase : 4 runs × 6\\" × 1/4\\" Aluminium; Neutral : 2 runs × 6\\" × 1/4\\" Aluminium. |
| 4 | Supply and fixing of bus duct enclosure MS supports | Supply and fixing of bus duct enclosure MS supports |
| 5 | Fabrication, supply, and installation of LT bus duct enclosure complete in all respects, in accordance with the enclosed drawings and specified scope of work. | Fabrication, supply, and installation of LT bus duct enclosure complete in all respects, in accordance with the enclosed drawings and specified scope of work. |
| 6 | Supply and fixing of bus bar finger supports at intervals of one metre or as required to provide adequate mechanical support for the bus bars after completion of the insulating sleeving work. The finger supports shall be suitable for mounting and securely supporting the bus bars of the dimensions specified under Line Item No. 2, ensuring proper alignment, stability, and electrical clearance. | Supply and fixing of bus bar finger supports at intervals of one metre or as required to provide adequate mechanical support for the bus bars after completion of the insulating sleeving work. The finger supports shall be suitable for mounting and securely supporting the bus bars of the dimensions specified under Line Item No. 2, ensuring proper alignment, stability, and electrical clearance. |
| 7 | Re-installation and assembly of the complete set of bus bars fitted with new insulating sleeves inside the bus duct, restoring the bus bar arrangement, alignment, clearances, supports, and all associated hardware to their original condition. Also includes painting of entire bus duct and providing space heaters | Re-installation and assembly of the complete set of bus bars fitted with new insulating sleeves inside the bus duct, restoring the bus bar arrangement, alignment, clearances, supports, and all associated hardware to their original condition. Also includes painting of entire bus duct and providing space heaters |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents