Tender For Work Of Protection Of Stub/Legs & Replacement Of Damaged Tower Parts At Different Towers Situated In Bindal River Of 132Kv Bindal-Purkul Line Against E-Tender Specification No.T-14/Se (O And M)/ Cr/D.Dun/2026-27
Tender Overview
Project Description
Tender for Work Of Protection Of Stub/Legs & Replacement Of Damaged Tower Parts At Different Towers Situated In Bindal River Of 132Kv Bindal-Purkul Line Against E-Tender Specification No.T-14/Se (O And M)/ Cr/D.Dun/2026-27
BOQ
| Sl. No. | Item Description |
| 1 | PART-A(T.No-5B) |
| 2 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work. |
| 3 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 4 | Providing and Laying in position cement concrete of specified grade including the cost of centering,shuttering,finishing.All work up to plinth level :1:4:8(1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) in foundation pad of Boat including cost of cement and all material, labour, T&P etc required for proper completion of work. |
| 5 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 6 | Work of Removing garbage from the leg and making route for material transportation by head loading from approaching point to site including labour and required T&P etc. to complete the work. |
| 7 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 8 | PART-B(T.No-10B) |
| 9 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work. |
| 10 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 11 | Providing and Laying in position cement concrete of specified grade including the cost of centering,shuttering,finishing.All work up to plinth level :1:4:8(1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) in foundation pad of Boat including cost of cement and all material, labour, T&P etc required for proper completion of work. |
| 12 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 13 | Work of Removing garbage from the all legs and making route for material transportation by head loading from approaching point to site including labour and required T&P etc. to complete the work. |
| 14 | Work of fabrication of required tower parts including labour and T&P,generator etc. to complete the work.(Tower parts , Nut & bolts will be given by the department). |
| 15 | Work of dismentling of damaged tower parts and members including labour and T&P etc. to complete the work. |
| 16 | Work of erection and fixing of required Tower parts including labour and T&P,drilling, etc. to complete the work. |
| 17 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 18 | PART-C(T.No-9B) |
| 19 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work. |
| 20 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 21 | Providing and Laying in position cement concrete of specified grade including the cost of centering,shuttering,finishing.All work up to plinth level :1:4:8(1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) in foundation pad of Boat including cost of cement and all material, labour, T&P etc required for proper completion of work. |
| 22 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 23 | Work of Removing garbage from the leg and making route for material transportation by head loading from approaching point to site including labour and required T&P etc. to complete the work. |
| 24 | Work of fabrication of required tower parts including labour and T&P,generator etc. to complete the work.(Tower parts , Nut & bolts will be given by the department). |
| 25 | Work of dismentling of damaged tower parts and members including labour and T&P etc. to complete the work. |
| 26 | Work of erection and fixing of required Tower parts including labour and T&P,drilling, etc. to complete the work. |
| 27 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 28 | PART-D(T.No-2C) |
| 29 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 30 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 31 | Work of Removing garbage from the all legs and making route for material transportation by head loading from approaching point to site including labour and required T&P etc. to complete the work. |
| 32 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 33 | PART-E(11C) |
| 34 | Work of clearing the space under the tower in the Bindal river and making the route for carrying required T&P by removing wild bushes. |
| 35 | Work of Transportation for carrying required material and heavy T&P to complete the work by head loading to the working site in bindal River and returned back to store at Bindal. |
| 36 | Work of strengthening of Towers by Providing stays to tower No11C with the help of steel rope and Turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next tower to prevent from any distortion. |
| 37 | Lowering all conductors RYB of Both side of towers safely(from 10 to11 & 11 to 12) including all labour and T&P etc. |
| 38 | Lowering earthwire of Both side of towers safely(from 10 to 11 & 11 to 12) including all labour and T&P etc. |
| 39 | Work of Removing garbage/waste material from all legs of tower No-11C including all labour and T&P etc. |
| 40 | Work of fabrication of required tower stubs, leg,bracing for Tower No-11C including labour and T&P,generator etc. to complete the work.(Tower parts , Nut & bolts will be given by the department). |
| 41 | Work of dismentling of required tower stubs, leg, bressing and members of tower No-8C including labour and T&P etc. to complete the work. |
| 42 | Work of erection and fixing of required stubs, leg for Tower No-11C including labour and T&P,drilling, etc. to complete the work. |
| 43 | Stringing all conductors RYB of Both side of towers safely(from 10 to11 & 11 to 12) including all labour and T&P etc. |
| 44 | Stringing earthwire of Both side of towers safely(from 10 to 11 & 11 to 12) including all labour and T&P etc. |
| 45 | Work of tack welding of tower bolts and nut of first section including labour and T&P etc. to complete the work. |
| 46 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work. |
| 47 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 48 | Providing and Laying in position cement concrete of specified grade including the cost of centering,shuttering,finishing.All work up to plinth level :1:4:8(1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) in foundation pad of Boat including cost of cement and all material, labour, T&P etc required for proper completion of work. |
| 49 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 50 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 51 | PART-F(19C) |
| 52 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work. |
| 53 | Providing and Laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing.All work up to plinth level :1:1.5:3(1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(M20). |
| 54 | Providing and Laying in position cement concrete of specified grade including the cost of centering,shuttering,finishing.All work up to plinth level :1:4:8(1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) in foundation pad of Boat including cost of cement and all material, labour, T&P etc required for proper completion of work. (3*2.5*0.05)*4 |
| 55 | Work of diversion of water flow by providing of sand or soil bags etc and removing it after completion of work. including labour and required T&P etc. to complete the work. |
| 56 | Work of Removing garbage from the all legs and making route for material transportation by head loading from approaching point to site including labour and required T&P etc. to complete the work. |
| 57 | Work of fabrication of required tower parts including labour and T&P,generator etc. to complete the work.(Tower parts , Nut & bolts will be given by the department). |
| 58 | Work of dismentling of damaged tower parts and members including labour and T&P etc. to complete the work. |
| 59 | Work of erection and fixing of required Tower parts including labour and T&P,drilling, etc. to complete the work. |
| 60 | Providing MS Bar of size 8 mm & 10 mm including bending, cutting, binding and transportation etc. |
| 61 | PART-G(7C) |
| 62 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts. |
| 63 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with :cement mortar 1:6(1 cement :6 coarse sand). |
| 64 | Providing and laying in position specified grade of cement concrete, required for top revetment wall in 1:3.:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 65 | Labour charges for Head Loading of above required material from road side to the working site, head loading of 132KV Bindal-Purkul line. |
| 66 | Work of disposal of collected garbage,rubbish, kankar pather and other undesired foreign material at some other area up to distance of 100 meter outside the periphary of area cleared. |
| 67 | Earth filling inside revetment at Tower and making of level of soil including all labour and T&P etc. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.