Tender For New Construction Work At Dhilwari Link Road To Bahodakheda School Road In Distt. Bareilly In F.Y. 2026-27.(With 05 Years Maintenance) (Length 1.150 Km)
Tender Value
82.28 Lakhs
Estimated cost
Bid Submission
22 Sep 2026
6 days left
EMD
6.31 Lakhs
Bank guarantee accepted
Document Fee
2725
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bareilly → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Work At Dhilwari Link Road To Bahodakheda School Road In Distt. Bareilly In F.Y. 2026-27.(With 05 Years Maintenance) (Length 1.150 Km)
BOQ
| Sl. No. | Item Description |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5.including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) (Ch. 0.000 to 1.150 Km) |
| 2 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Ch. 0.000 to 1.150 Km) |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) (Ch. 0.000 to 1.150 Km) |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 with 22.4 - 53 mm stone ballast as per Technical Specification Clause 405) including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) (Ch. 0.000 to 1.150 Km) |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 Grade M30, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) (Ch. 0.000 to 1.150 Km) (C.C. work will be carried out by RMC/ self loaded concrete mixture machine.) |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 (Ch. 0.000 to 1.150 Km) |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m as per Technical Specification Clause 302.3 ( For Culvert Ch. 0.200 & 0.750 Km) |
| 8 | Providing concrete for plain/reinforced concrete in 1:3:6 open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) ( For Culvert Ch. 0.200 & 0.750 Km) |
| 9 | Brick masonry work in cement mortar in 1:3 foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) ( For Culvert Ch. 0.200 & 0.750 Km) |
| 10 | Supply & laying of compacted 40 mm gauge brick ballast around and below hume pipe with proper compaction ( For Culvert Ch. 0.200 & 0.750 Km) |
| 11 | Pointing with cement mortar (1:3) on brick work as per drawing and technical specification Clauses 613.3 and 1204 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) ( For Culvert Ch. 0.200 & 0.750 Km) |
| 12 | Providing and laying reinforced cement concrete pipe NP3 for 600 mm dia culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106, ( For Culvert Ch. 0.200 & 0.750 Km) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender