Tender for Tender for New Construction Work At Parsol Nikodi Majra To Mutena Road In District Gautambudhnagar
Tender Value
1.51 Crore
Estimated cost
Bid Submission
22 Sep 2026
6 days left
EMD
9.72 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gautam Buddha Nagar → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Work At Parsol Nikodi Majra To Mutena Road In District Gautambudhnagar
BOQ
| Sl. No. | Item Description |
| 1 | PART A BITUMINOUS WORKExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 4 | Cement Treated Base Grade-IIIProviding, laying and speading material on a prepared sub grade, adding cement @ 4% by weight to the spread materaial manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base. as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 5 | Brick edging on both side of the road of M- 150 bricks 7 cm. wide, 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. |
| 6 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular/ Bituminous surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 8 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 9 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Patri work) Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 10 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. Dia 450 mm Dia. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 11 | Providing & fixing reinforced cement concrete M15 grade Ordinary Kilometre Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of all labour, T&P, labour cess and all taxes complete. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 12 | 05 years Maintenance Charge @7.50% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 2rd year @ 1.0% of total work amount |
| 13 | 05 years Maintenance Charge @7.50% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 3rd year @ 1.5% of total work amount |
| 14 | 05 years Maintenance Charge @7.50% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 4th year @ 2.25% of total work amount |
| 15 | 05 years Maintenance Charge @7.50% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 5th year @ 3% of total work amount |
| 16 | PART B CC WORKExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 17 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 18 | Construction of Granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 19 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 20 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 21 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Patri work) Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 22 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 23 | Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 24 | Plain/reinforced cement concrete (Grade M20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 25 | Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. Including cost of all labour, T&P, Labour cess and all taxes complete. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 26 | Maintenance work for (Part-B CC Surface Road)05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 2nd year @ 0.25% |
| 27 | 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 3rd year @ 0.50% |
| 28 | 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 4th year @ 0.75% |
| 29 | 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Maintenance cost for 5th year @ 1.00 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender