Tender For New Construction Work Of Kashpani Link Road. (Including Maintenance Up To cement concrete Work At 2.50% & Including Maintenance Up To Pc Work At 7.50% Of Construction Cost
Tender Value
2.35 Crore
Estimated cost
Bid Submission
22 Sep 2026
6 days left
EMD
13.75 Lakhs
Bank guarantee accepted
Document Fee
2720
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Work Of Kashpani Link Road. (Including Maintenance Up To cement concrete Work At 2.50% & Including Maintenance Up To Pc Work At 7.50% Of Construction Cost
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase. |
| 3 | Cement WBM Grading III / Providing, laying and spreading Material on a prepared sub base, cement @4 by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to acheive the desired unconfined compressive strength and to form a layer of sub base/base. |
| 4 | Prime Coat / Low porosity / Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm. using mechanical means as per Technical Specification Clause-502. |
| 5 | Tack Coat / Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 6 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates ( two third 13.2 mm and one third 11.2mm grit) either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. / Case - I By Manual Means / (I) Bitumen (S-90) |
| 7 | Seal Coat - Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A,Type B and Type C as per Technical Specification Clause 510 / A. By Manual Means / Case - III : Type C / (I) Bitumen (S-90). |
| 8 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material |
| 9 | Water Bound Macadam Sub-base/base / 3) WBM Grading 3 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means |
| 10 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. |
| 11 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row /Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106./(E)900 mm Dia |
| 12 | Excavation for Structures / Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. / I. Ordinary soil / (i) Upto 3 m depth |
| 13 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / I. P.C.C grade M 10 / (i) Nominal mix 1:3:6 ( Mechanical mix) |
| 14 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. / II. Coursed rubble masonry (2nd sort) / (ii) In 1:4 cement mortar |
| 15 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 / II. Coursed Rubble masonry (2nd sort) / (iii) In cement mortar (1:5) |
| 16 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / V. R.C.C. grade M 25 ( Mechanical mix) |
| 17 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 / II. R.C.C M 25 |
| 18 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 19 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204. |
| 20 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 21 | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender