Bids Are invited for Custom Bid For Services - ---- - Supply Of Following Matarial As Per Relevent Iss , F-Braket/F Cl , Earthing Complete , Cross Arm Holding Cl , Stone Pad , Cl For T-Off Channel , Danger Board , Barbed Wire , Number Plate , Gi Pipe
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Supply Of Following Matarial As Per Relevent Iss , F-Braket/F Cl , Earthing Complete , Cross Arm Holding Cl , Stone Pad , Cl For T-Off Channel , Danger Board , Barbed Wire , Number Plate , Gi Pipe 6 Inch Dia , Pipe Earthing Of Vcb , Alumminium Tape , Ms Nut And Bolt With Washer , Cl With Nut And Bolt , Safe Carriage Of Following Material From Electricity Store Center Hathras To Pit Site Of Work Through The Kachcha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc Which Required For Proper Completion Of Work , X Arm Ms Angle V Type , Ms T-Off Channel , Ms Top Channel , Cross Bracing Ms Angle , 11 Kv Vcb Outgoing Ctr 200/100/5A , Ms Dropper Channel , Acsr Dog Conductor , 11 Kv Disc Insulator Complete , Acsr Weasel Conductor , 3X185 Sqmm 11 Xlpe Cable , 3X120 Sqmm 11 Kv Xlpe Cable , Cable Jointing Kit Suitable For Xlpe Cable 3X120 Sqmm , Cable Jointing Kit Suitable For Xlpe Cable 3X185 Sqmm , 11 Kv Pin Insulator Complete , Stay Set Complete , Fuse Set , St Pole 11 Mtr Long , 11 Kv Pilfer Proof Metering Cubicale , 11 Kv Pole Mounting Unit Ctr 10/5 , T/F Base Angle With Cl , 3X120 Sqmm 11 Kv Xlpe Cable , Cable Jointing Kit Suitable For 3X120 Sqmm 11 Kv Xlpe Cable , Errection Of Following Poles With Grouting Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , St Pole 11 Mtr Long , Fixing/Errection Of Following Items, Cost Of Labor, Material And T&P Which Required Completion Of Work , X Arm Ms Angle V Type , F Bracket , Ms T-Off Channel , Ms Top Channel , Cross Bracing Ms Angle , 11 Kv Vcb Outgoing Ctr 200/100/5A , Ms Dropper Channel , 11 Kv Disc Insulator Complete , Cable Jointing Kit Suitable For 3X120 Sqmm 11 Kv Xlpe Cable , Cable Jointing Kit Suitable For 3X185 Sqmm 11 Kv Xlpe Cable , 11 Kv Pin Insulator Complete , Cross Arm Holding Cl , Stone Pad , Cl For T-Off Channel , Danger Board , Barbed Wire , Number Plate , Gi Pipe 6 Inch Dia , Earthing Of Vcb , Fuse Set , Alumminium Tape , Ms Nut And Bolt With Washer , Cl With Nut And Bolt , 11 Kv Pilfer Proof Metering Cubicale , 11 Kv Pole Mounting Unit Ctr 10/5 , T/F Base Angle With Cl , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Laying, Sagging And Stringing And Jumpering /Binding Etc. Of New & Old Acsr Weasal Conductor /Gi In 11 Kv/Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Dog Conductor , Acsr Weasel Conductor , 3X185 Sqmm 11 Kv Xlpe Cable , 3X120 Sqmm 11 Kv Xlpe Cable
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply of Following Matarial as per relevent ISS | Supply of Following Matarial as per relevent ISS |
| 2 | F-Braket/F clamp | F-Braket/F clamp |
| 3 | Earthing Complete | Earthing Complete |
| 4 | Cross Arm holding Clamp | Cross Arm holding Clamp |
| 5 | Stone Pad | Stone Pad |
| 6 | clamp for T-off Channel | clamp for T-off Channel |
| 7 | Danger Board | Danger Board |
| 8 | Barbed wire | Barbed wire |
| 9 | Number Plate | Number Plate |
| 10 | GI Pipe 6 inch dia | GI Pipe 6 inch dia |
| 11 | Pipe Earthing of VCB | Pipe Earthing of VCB |
| 12 | Alumminium Tape | Alumminium Tape |
| 13 | MS Nut and Bolt with Washer | MS Nut and Bolt with Washer |
| 14 | Clamp with Nut and bolt | Clamp with Nut and bolt |
| 15 | Safe carriage of following material from Electricity store center hathras to pit site of work through the kachcha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc which required for proper completion of work | Safe carriage of following material from Electricity store center hathras to pit site of work through the kachcha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc which required for proper completion of work |
| 16 | X Arm MS Angle V Type | X Arm MS Angle V Type |
| 17 | MS T-off Channel | MS T-off Channel |
| 18 | MS Top Channel | MS Top Channel |
| 19 | Cross Bracing MS Angle | Cross Bracing MS Angle |
| 20 | 11 KV VCB Outgoing CTR 200/100/5A | 11 KV VCB Outgoing CTR 200/100/5A |
| 21 | MS Dropper Channel | MS Dropper Channel |
| 22 | ACSR Dog Conductor | ACSR Dog Conductor |
| 23 | 11 KV Disc Insulator complete | 11 KV Disc Insulator complete |
| 24 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 25 | 3x185 sqmm 11 XLPE Cable | 3x185 sqmm 11 XLPE Cable |
| 26 | 3x120 sqmm 11 kv XLPE cable | 3x120 sqmm 11 kv XLPE cable |
| 27 | Cable Jointing Kit Suitable for XLPE Cable 3x120 sqmm | Cable Jointing Kit Suitable for XLPE Cable 3x120 sqmm |
| 28 | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm | Cable Jointing Kit Suitable for XLPE Cable 3x185 sqmm |
| 29 | 11 KV Pin Insulator Complete | 11 KV Pin Insulator Complete |
| 30 | Stay set Complete | Stay set Complete |
| 31 | Fuse Set | Fuse Set |
| 32 | ST Pole 11 Mtr Long | ST Pole 11 Mtr Long |
| 33 | 11 kv Pilfer Proof Metering Cubicale | 11 kv Pilfer Proof Metering Cubicale |
| 34 | 11 kv Pole Mounting Unit CTR 10/5 Amp | 11 kv Pole Mounting Unit CTR 10/5 Amp |
| 35 | T/F Base Angle with clamp | T/F Base Angle with clamp |
| 36 | 3x120 sqmm 11 kv XLPE cable | 3x120 sqmm 11 kv XLPE cable |
| 37 | Cable jointing kit suitable for 3x120 sqmm 11 KV XLPE Cable | Cable jointing kit suitable for 3x120 sqmm 11 KV XLPE Cable |
| 38 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 39 | ST Pole 11 Mtr Long | ST Pole 11 Mtr Long |
| 40 | Fixing/Errection of following items, cost of labor, material and T&P which required completion of work | Fixing/Errection of following items, cost of labor, material and T&P which required completion of work |
| 41 | X Arm MS Angle V Type | X Arm MS Angle V Type |
| 42 | F Bracket | F Bracket |
| 43 | MS T-off Channel | MS T-off Channel |
| 44 | MS Top Channel | MS Top Channel |
| 45 | Cross Bracing MS Angle | Cross Bracing MS Angle |
| 46 | 11 KV VCB Outgoing CTR 200/100/5A | 11 KV VCB Outgoing CTR 200/100/5A |
| 47 | MS Dropper Channel | MS Dropper Channel |
| 48 | 11 KV Disc Insulator complete | 11 KV Disc Insulator complete |
| 49 | Cable jointing kit suitable for 3x120 sqmm 11 KV XLPE Cable | Cable jointing kit suitable for 3x120 sqmm 11 KV XLPE Cable |
| 50 | Cable jointing kit suitable for 3x185 sqmm 11 KV XLPE Cable | Cable jointing kit suitable for 3x185 sqmm 11 KV XLPE Cable |
| 51 | 11 KV Pin Insulator Complete | 11 KV Pin Insulator Complete |
| 52 | Cross Arm holding Clamp | Cross Arm holding Clamp |
| 53 | Stone Pad | Stone Pad |
| 54 | Clamp for T-off channel | Clamp for T-off channel |
| 55 | Danger Board | Danger Board |
| 56 | Barbed wire | Barbed wire |
| 57 | Number Plate | Number Plate |
| 58 | GI Pipe 6 inch dia | GI Pipe 6 inch dia |
| 59 | Earthing of VCB | Earthing of VCB |
| 60 | Fuse Set | Fuse Set |
| 61 | Alumminium Tape | Alumminium Tape |
| 62 | MS Nut and Bolt with Washer | MS Nut and Bolt with Washer |
| 63 | Clamp with Nut and bolt | Clamp with Nut and bolt |
| 64 | 11 kv Pilfer Proof Metering Cubicale | 11 kv Pilfer Proof Metering Cubicale |
| 65 | 11 kv Pole Mounting Unit CTR 10/5 Amp | 11 kv Pole Mounting Unit CTR 10/5 Amp |
| 66 | T/F Base Angle with clamp | T/F Base Angle with clamp |
| 67 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 68 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 69 | Laying, sagging and stringing and jumpering /binding etc. of new & old ACSR Weasal conductor /GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering /binding etc. of new & old ACSR Weasal conductor /GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. |
| 70 | ACSR Dog Conductor | ACSR Dog Conductor |
| 71 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 72 | 3x185 sqmm 11 KV XLPE Cable | 3x185 sqmm 11 KV XLPE Cable |
| 73 | 3x120 sqmm 11 KV XLPE Cable | 3x120 sqmm 11 KV XLPE Cable |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender