Bids Are invited for Custom Bid For Services - Deposite Work Under Edd Auriaya - Carriage And Erection Of Following Material Against Replacement/Installation/Laying Of Item/Erection Of Material As Per Respo Drawings/Estimate. Work Includes All Cartag
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Deposite Work Under Edd Auriaya - Carriage And Erection Of Following Material Against Replacement/Installation/Laying Of Item/Erection Of Material As Per Respo Drawings/Estimate. Work Includes All Cartage/Carriage(Store To Site), T&P, Commissioning And Any Other Work Which Is Required For Completion Of Work. As Per Respo Norms.(Qty Will Be + - 50%) , Pcc Pole 8.5 Mtr/ Stp 11 Mtr , Acsr Wesel/ Dog Conductor , Lt Abc1x25+1X16/3X50+1X35+1X16/ 3X95+1X70+1X16/3X120+1X95+1X16 Sqmm , 10/16 Kva Tf Single Phase , 25/63/100 Kva T/F New , 11 Kv Cable Xlpe 3X70 / 3X185/ 3X120 Sqmm , Ct/Pt Pole Unit , Ct/Pt Cubical Mtr , Earthing Complete , Stay Set Complete , 11 Kv Disk Insulator With Fittingh , V-Type Cross Arm , Fuse Set , 11 Kv Cable Box 3X70/3X120 /3X185 Sqmm Id/Od , Single/Three Phase Distribution Box , Stay Wire , Gi Wire , 11 Kv Pin Insulator With Pin , T-Off Channel , Top Channel , Droper Channel , Base Angle T/F , Supply And Erection Of Following Material Against Replacement/Installation/Laying Of Item/Erection Of Material As Per Respo Drawings/Estimate. Work Includes All T&P, Commissioning And Any Other Work Which Is Required For Completion Of Work. As Per Respo Norms.(Qty Will Be + - 50%) , Cross Arm Holding Cl , Pg Cl , Stay Cl , F-Cl , Dp Cl , Stay Insulator , Nut Bolt , Guarding Angle , Suspension Cl , Dead End Cl , Eye Hook , Single/Three Phase Distribution Box Cl , G.I. Pipe 6 Dia , Grouting Of Pole , Grouting Of Stay , Pipe Earthing , Trimming Of Tree Branches In New 11 K.V Line. , Dismentling Of Line Weasal/Racoon /Dog Conductor Wire , G.I Wire And Other Material As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carries Etc. Required For Proper Completion Of Work And Scrap Submited Site To Store.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) | Carriage and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) |
| 2 | PCC POLE 8.5 MTR/ STP 11 MTR | PCC POLE 8.5 MTR/ STP 11 MTR |
| 3 | ACSR WESEL/ DOG CONDUCTOR | ACSR WESEL/ DOG CONDUCTOR |
| 4 | LT ABC1X25+1X16/3X50+1X35+1X16/ 3X95+1X70+1X16/3X120+1X95+1X16 SQMM | LT ABC1X25+1X16/3X50+1X35+1X16/ 3X95+1X70+1X16/3X120+1X95+1X16 SQMM |
| 5 | 10/16 KVA TF SINGLE PHASE | 10/16 KVA TF SINGLE PHASE |
| 6 | 25/63/100 KVA T/F NEW | 25/63/100 KVA T/F NEW |
| 7 | 11 KV CABLE XLPE 3X70 / 3X185/ 3X120 SQMM | 11 KV CABLE XLPE 3X70 / 3X185/ 3X120 SQMM |
| 8 | CT/PT POLE UNIT | CT/PT POLE UNIT |
| 9 | CT/PT CUBICAL MTR | CT/PT CUBICAL MTR |
| 10 | EARTHING COMPLETE | EARTHING COMPLETE |
| 11 | STAY SET COMPLETE | STAY SET COMPLETE |
| 12 | 11 KV DISK INSULATOR WITH FITTINGH | 11 KV DISK INSULATOR WITH FITTINGH |
| 13 | V-TYPE CROSS ARM | V-TYPE CROSS ARM |
| 14 | FUSE SET | FUSE SET |
| 15 | 11 KV CABLE BOX 3X70/3X120 /3X185 SQMM ID/OD | 11 KV CABLE BOX 3X70/3X120 /3X185 SQMM ID/OD |
| 16 | SINGLE/THREE PHASE DISTRIBUTION BOX | SINGLE/THREE PHASE DISTRIBUTION BOX |
| 17 | STAY WIRE | STAY WIRE |
| 18 | GI WIRE | GI WIRE |
| 19 | 11 KV PIN INSULATOR WITH PIN | 11 KV PIN INSULATOR WITH PIN |
| 20 | T-OFF CHANNEL | T-OFF CHANNEL |
| 21 | TOP CHANNEL | TOP CHANNEL |
| 22 | DROPER CHANNEL | DROPER CHANNEL |
| 23 | BASE ANGLE T/F | BASE ANGLE T/F |
| 24 | Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) | Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) |
| 25 | CROSS ARM HOLDING CLAMP | CROSS ARM HOLDING CLAMP |
| 26 | PG CLAMP | PG CLAMP |
| 27 | STAY CLAMP | STAY CLAMP |
| 28 | F-CLAMP | F-CLAMP |
| 29 | DP CLAMP | DP CLAMP |
| 30 | STAY INSULATOR | STAY INSULATOR |
| 31 | NUT BOLT | NUT BOLT |
| 32 | GUARDING ANGLE | GUARDING ANGLE |
| 33 | SUSPENSION CLAMP | SUSPENSION CLAMP |
| 34 | DEAD END CLAMP | DEAD END CLAMP |
| 35 | EYE HOOK | EYE HOOK |
| 36 | SINGLE/THREE PHASE DISTRIBUTION BOX CLAMP | SINGLE/THREE PHASE DISTRIBUTION BOX CLAMP |
| 37 | G.I. PIPE 6\\" DIA | G.I. PIPE 6\\" DIA |
| 38 | GROUTING OF POLE | GROUTING OF POLE |
| 39 | GROUTING OF STAY | GROUTING OF STAY |
| 40 | PIPE EARTHING | PIPE EARTHING |
| 41 | Trimming of Tree Branches in New 11 K.V Line. | Trimming of Tree Branches in New 11 K.V Line. |
| 42 | Dismentling of Line Weasal/Racoon /DOG conductor wire , G.I Wire and other material as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work and scrap submited site to store. | Dismentling of Line Weasal/Racoon /DOG conductor wire , G.I Wire and other material as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work and scrap submited site to store. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender