Tender For Annual Maintenance Of Its Plc/Irtu/Logo Based Pump Automation Control Panel With Scada System With Power Wiring Of Various Tubewells And Horizontal Centrifugal Pumps & Vertical Turbine Pumping Stations Including Cost Of All Labour, Station
Tender Overview
Project Description
Tender for Annual Maintenance Of Its Plc/Irtu/Logo Based Pump Automation Control Panel With Scada System With Power Wiring Of Various Tubewells And Horizontal Centrifugal Pumps & Vertical Turbine Pumping Stations Including Cost Of All Labour, Stationery, Materials And T&P, Instruments/Spare Parts, Equipments Required For Proper Completion For Three Years In Srinagar, Gauchar And Karanprayag Urban Water Supply Schemes On Rate Contract , Rates Of Annual Maintenance Of Its Plc/Irtu/Logo Based Pump Automation Control Panel With Scada System With Power Wiring Of Various Tubewells And Horizontal Centrifugal Pumps & Vertical Turbine Pumping Stations Including Cost Of All Labour, Stationery, Materials And T&P, Instruments/Spare Parts, Equipments Required For Proper Completion As Per Terms And Conditions Of Tender Document. , (A) Upto 50 Hp 1. For Ist Year (12 Months) , 2. Iird Year (12 Months) , 3. Iiird Year (12 Months) , (B) From 51 Hp Upto 100 Hp 1. For Ist Year (12 Months) , 2. Iird Year (12 Months) , 3. Iiird Year (12 Months) , (C) From 101 Hp Upto 150 Hp 1. For Ist Year (12 Months) , 2. Iird Year (12 Months) , 3. Iiird Year (12 Months)
BOQ
| Sl. No. | Item Description |
| 1 | Rates of Annual Maintenance of its PLC/IRTu/Logo Based Pump Automation Control Panel with SCADA system with power wiring of various Tubewells and Horizontal Centrifugal Pumps & Vertical Turbine pumping stations including cost of all labour, stationery, materials and T&P, instruments/spare parts, equipments required for proper completion as per terms and conditions of tender document. |
| 2 | (A) Upto 50 HP1. For Ist year (12 months) |
| 3 | 2. IIrd year (12 months) |
| 4 | 3. IIIrd year (12 months) |
| 5 | (B) From 51 HP upto 100 HP1. For Ist year (12 months) |
| 6 | 2. IIrd year (12 months) |
| 7 | 3. IIIrd year (12 months) |
| 8 | (C) From 101 HP upto 150 HP1. For Ist year (12 months) |
| 9 | 2. IIrd year (12 months) |
| 10 | 3. IIIrd year (12 months) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender