Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 16 days TDR #57503346

Bids Are invited for Custom Bid For Services - Percentage Bidding For Hiring Agencies For Lmc Work In Haridwar Ga - Pe Pipeline , Pipe Laying In Any Type Of Surface Like Unprepared Surface (Katcha Surface)/ Normal Surface/Hard Surface/Pebbles/Cobbles

Issued by Boards / Undertakings / PSU · Haridwar, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Oct 2026
16 days left
EMD
7 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Haridwar → Uttarakhand
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Percentage Bidding For Hiring Agencies For Lmc Work In Haridwar Ga - Pe Pipeline , Pipe Laying In Any Type Of Surface Like Unprepared Surface (Katcha Surface)/ Normal Surface/Hard Surface/Pebbles/Cobbles/ Boulders/Structures/ Rock Surface Etc Using Open Cut Moling (Without Casing)/ Moling (With Casing)/Directional Drilling Technique (With And Without Casing Pipe) Methodology. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of Pe100, Sdr11 Line Pipes Of All Sizes Including, Proper Stacking, Identification,And Supply Of Accessories Of All Sizes & Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 32 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route, Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storeage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumables, Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store.-Laying Of All Pe Pipe (Pe 100 Sdr11), Including Supply Of Hdpe Casing Pipe (In Case Of Hdd (With Case).Moling(With Case) , Couplers, End Caps Etc. (Ref. Cl. 4.3 Of Particular Job Specification).-Survey Of Under Ground Utilities, Execution Of The Work As Per Specification, Including Excavation Of Pits Moling With The Hole Size Not Exceeding 20% Of The Pipe Dia, Jointing And Insertion Of Carrier Pipe With Casing, Testing & Commissioning And Restoration Of The Pits To Original Condition, Submission Of As-Built Graph As Per Specifications And The Instruction Of Engineer-In-Charge.-Casing Details Is As Given Below:-1. For 20/32 Mm Pe Pipe (In 75 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).2. For 63 Mm Pe Pipe (In 125 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).3. For 90 Mm Pipe (In 180 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).4. For 125 Mm Pipe (In 250 Mm Dia. Hdpe Casing Pipe, Pe63/80 Pn 6.0). , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawings. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details And Submit Same To Owner For Review / Approval. , Carrying Out Preliminary Activities Such As Preperation Of Drawings Wherever Required For Crossing Etc. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Stacking And Installation Of Construction Markers, Clearing, Fencing, Grubbing, Cutting Of Trees, Full Filling All The Requirements Of Various Statutory/ Environment Authorities To The Entire Satisfaction Of Concerned Authorities, Grading Of Work Area. , Barricading The Work Area As Per Local Authorities Norms & To The Satisfaction Of Owner/ Eingineer -In- Charge, Installation Of Safety Signs. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher]. Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends /Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques As Per Specification. , Installation / Lowering The Pipeline In Trench To Required Depth As Per Pjs, Technical Specification & Drawings, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Standard Drawings, Data Sheets & Technical Specifications, Padding Around Pipeline Including Supply Of Suitable Padding Material Duly Approved By Eic, Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil/Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against This Item Also Include Electro-Fusion Jointing Of Valves, Fittings Wherever Required And As Directed By Engineer-In-Charge. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer- In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/Use, Reconclation Of Material Area Wise And Obtaining No Objection Certificate From Owner /Mecon. , Preparation And Submission Of Daily Progress Report, Laying Graphs / Pe Line Cardson Daily Basis. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , In Case, The Minimum Required Depth Is Not Possible Due To Site Condition, Necessary Mitigation Measures (For Minimum Top Cover Of 600Mm) Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. However Required Top Cover Can Further Be Reduce Till 375Mm And Payment Against The Same Shall Be Made According To Sor Item No. 1.3 Or 1.4 (Whichever Is Applicable). , Submission Of All Documents Required For Contract Closure In Numbers As Mentioned In Contract. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , Note : , I) The Lengths Of Pipelines Are Tentative. , Ii) For Restoration Of Asphalt / Concrete Roads, The Item For Construction Of Asphalt Top/ Concrete Top / Tiles/Stone Slab/Paver Blocks/Curb Stones Shall Be Paid Separately As Per The Rates Quoted For The Same Elsewhere In The Sor. , Iii) In Case, Contractor Prefers To Lay The Pipeline Through Hdd Method In Place Of Method As Per Sor Item- 1.1, Contractor Shall Be Required To Lay The Pipe Upto A Depth Not More Than 1.4M. The Payment Shall However Be Made As Per Sor Item No.- 1.1 Only. , Iv) In Case Quantity Increases Beyond 4 Meter (Against Sor Item No 1.1.A) Payment Towards Additional Length Shall Be Paid As Per Sor Item No. 1.1.B. , V) For Pe Laying Through Casing Pipe ,Payment For Length Of Pe Pipe Will Be Done As Per Casing Pipe Length. , Vi) Payment For Items Above Under Pipeline Laying In All Type Of Rocky Strata Shall Be Made Only Whereever Hard Rock Is Existing And Supply And Installationj Of Padding Materaiis(I.E. Sand/Soft Soii)Shaii Be Done As Per The Direction Of Eic.Bidders To Quote Accordingly. , Restoration , Restoration Of The Roads, Pavements, Channels, Footpaths, Tiles, Stones Etc. To Original Condition Including Supply Of The Approved Quality Material Required, As Per Local Authorities Norms, Obtaining Noc From Concerned Local Authorities / Land Owners / Third Party Inspection Agencies (If Any) Designated By Owner And To The Satisfaction Of Engineer-In-Charge. , Asphalting , Cement Concrete , Tiles / Paver / Blocks / Curb Stones, Red Sand Stone , Brick Soling / Channels, Etc. , Providing, Hoisting And Placing Of 75 Mm Thick Precast Reinforced Cement Concrete Slab Of M-20 Grade Over Pipeline As Mechanical Protection Including The Cost Of Required Centering, Shuttering, Reinforcement Complete As Per Tender Drawing And Direction Of The Eic. Note:- Size (Length X Width) Of The Precast Slab Will Be Decided As Per Site Conditionand As Per Instruction Of Eic. Precast Slab Will Be Placed In Multiple Number And Various Location As Per Site Condition And As Per Instruction Of Eic. , Pipe Laying Inside Private Property I.E Multistory Buildings / Apartments With No Movement Of Heavy Vehicles, Surrounded With Boundary Wall Where Pipe Topcover Could Not Be Achieved 600 Mm. , Minimum Pipe Top Cover Of 375 Mm Is Required And The Line Pressure Shall Not Exceed 110Mbar. , Necessary Mitigation Measures Such As Rcc Slab (150Mm Thick And 300Mm Width) At The Top, The Rcc Slab Of The Roof Of Basement Shall Be Treated As Bottom. There Shall Be Sand Filling Across Three Sides Of The Line Pipe Of 100Mm Each Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Latest Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of 20Mm, 32Mm & 63Mm Pe Pipe (Pe 100 Sdr11) Including Proper Stacking, Identification,And Supply Of Accessories Of Below Mentioned Sizes & All Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 63 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route , Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumabies,Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store. , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawing. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details, And Submit Same To Owner For Review / Approval. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher].Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends / Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques Asper Specification. , Installation / Lowering The Pipeline In Trench To Required Depth, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Drawing No. Mec/U999/05/11/C/ And Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil / Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer- In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Owner/ Consultant. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , 20 Mm Pe 100 Pipe / 32 Mm Pe 100 Pipe , Pipe Laying Inside Private Property I.E Multistory Buildings / Apartments With Nomovement Of Heavy Vehicles, Surrounded With Boundary Wall Where Pipe Top Cover Could Not Be Achieved 600 Mm. , Minimum Pipe Top Cover Of 375 Mm Is Required And The Line Pressure Shall Not Exceed 11Ombar. , Necessary Mitigation Measures Such As Rcc Slab (150Mm Thick And 300Mm Width) At The Top And Rcc Slab (100Mm Thick And 300Mm Width) At Bohom. There Shall Be Sand Filling Across Three Sides Of The Line Pipe Of 100Mm Each Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Latest Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of 20Mm, 32Mm & 63Mm Pe Pipe (Pe 100 Sdr11) Including Proper Stacking, Identification,And Supply Of Accessories Of Below Mentioned Sizes & All Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 63 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route , Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumabies,Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store. , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawing. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details, And Submit Same To Owner For Review /Approval. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher]. Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends / Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques As Per Specification. , Installation / Lowering The Pipeline In Trench To Required Depth, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Drawing No. Mec/U999/05/11/C/ And Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil / Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer-In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Owner/ Consultant. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , 20 Mm Pe 100 Pipe / 32 Mm Pe 100 Pipe , Supply Of Gi/ Ms/ Concrete Sleeves (Wherever Required As A Special Case As Per Instructions Of The Engineer-In-Charge) , Supply, Installation Of Sleeve, Insertion Of Pipe, Sealing The Annuals, Firm Fixing Of Sleeves With Concrete Mix. Breaking Through Any Obstructions And Their Subsequent Restoration, As Per Specifications And Instructions Of The Engineer-In-Charge. Gi/Ms Pipes Shall Be Heavy (C-Class) As Per Is-1239 , Gi Sleeves /Concrete Sleeves , 2 /, Nb, 1 Length , 4 Nb, 1 Length , Ms Enamel Coated , 4 Nb, 3 Length , Concrete Sleeve (Np-2 Class) , 4 Nb, 3 Length , 6 Nb, 3 Length , The Decision Regarding Use Of Type Of Sleeves To Be Used At Various Locations Shall Be Made By Engineer In-Charge / Owner , Fabrication & Installation Of Markers , Warning Plate Markers , Supply, Fabrication And Installation Of Plate Markers, Including Application Of Approved Color And Quality Of Primer And Paint, Stencil Letter Cutting Of Lettering, Numbers, Direction, Etc. As Per The Attached Drawing In Technical Volume To Be Installed Near Regulator. , Excavation Of Hard Rock/Surface , Excavation Of Trench Or Pits, Wherever Hard Rock Presence Is Exceeding 1.5 M In Any Direction Of The Trench And Excavation Of Trench Or Pits In Malba/Multiple Layers Of Asphalt/ Brick / Pcc/Rcc Etc And Removable Only By Pneumatic Chisel / Drill As Per The Specifications And Direction Of Eic. The Rates Are Payable Over And Above The Laying Rates As Per Relevant Sor No. 1.1 , Cutting Of Pcc/Rcc Surface With Thickness More Than 12 Or Continuous Asphalt Multi-Layer/ Malba/ Brick / Boulders More Than 24.(Malba Shall Be Considered As A Strata Where Soil Is In Mixed Form Of Debris/Building Rubbish Or Discarded Pieces Ofbricks/Stones ) , Rock Cutting Encountered While Excavation Of Trenches For Item 1.1 Of Sor, Not Exceeding 1.5 Meter In Width, And Lift Upto 1.5 Meter, Including Getting Out The Excavated Soil And Disposal Of Excavated Soil As Directed Within A Lead Of 50 Meter. In Case Of Rocky Soil, The Bedding Shall Be Done With Approved/ Good Quality Packing Sand, Subject To The Approval Of The Eic, The Size Distribution Of The Sand / Shall Be The Same As Per Soil. The Packing Sand Shall Be Placed To A Minimum Thickness Of 150Mm Around The Pipe In Case Of Rocky Terrain. , Demolition Of Pcc Work Below Plinth Level , Demolishing Plain Cement Concrete (Pcc) Work (Taking All Necessary Safety Precautions) For All Depths Below Plinth Level Including Supply Of All Tools & Tackles, Necessary Scaffolding, Propping, Underpinning, Etc., Disposal Of Unserviceable Material Outside The Boundary Limits Keeping The Owner Indemnified Of Any Liabilities From Statutory/ Local Bodies, All Complete Work As Specified And Directed , Core Cutting Of Rcc Structure/Brick Wall , Png Connection To Domestic Consumers , Installation Of Gi Service Pipe , Supply, Loading, Storing, Unloading And Installation Of Gi Pipes, Including Supply Of Gi Fittings/Accessories Including Fittings Of All Sizes & Thickness Like Elbows, Hex Nippie,Tees, Unions, Sockets, Reducers, Gi Piugs,Sieeves Etc., Installation Of Gi Line (Alongwith Installation Of Required Accessories As Mentioned Above) Of Following Sizes, Including Fabrication With Supply Of All Materials, Consumables, Labour And Other Incidental Works. The Scope Of Work Excludes Installation Of Regulators (1/6 Bar To 21 M Bar With Hex Nipple On Inlet And Outlet Side Of Regulator) Which Shall Be Provided As Free Issue Item. Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Gi Line Ready For Commissioning As Per Drawings Specifications. , Scope Of Work Indicated In Pjs And Other Provisions Of Contract Document And Instructions Of Engineer-In-Charge, Including But Not Limited To Carrying Out The Following Works:Preparation And Approval Of Schedules, Execution Procedures, Sketches. , Finalisation Of Optimum Route With Consent Of Customer, From Transition Fitting To Cooking Oven/ Appliance. , Making Temporay But Stable Platforms/ Scaffolding/ Rope Ladders And All Other Safety Measures Including Safety Belts Wherever Required. , Installation Of Gi Pipes, Fittings, Including Npt Threading, Painting As Specified. , Drillings Of Holes Through Walls (Brick, Rcc), Granite, Marble, Glass Cutting With Proper Heavy Duty Hammer Drill Machine Tools And Tackeles, Using Proper Sealent/Grout Materialed Colors To Match The Original Replacement Of Damages During Drillling, Restoring The Area To Original Condition. , Supply & Fixing Of Approved Cl S, Dowell Plugs With Screws, Grout Material, Suitable Thread Sealant I.E. Teflon Tape/ Lock Tight, Drilling Of Holes Through Tiles/ Wood/ Marble/ Granite Etc. Jointing Of Pe To Above Ground Service Gi Pipes, Testing, Purging With Nitrogen And Commissioning Of The Complete Installation As Per Specification. , Painting Of Entire Length Of Pipe Along With Fittings After Proper Surface Finish By One Coat Of Approved Primer Paint And Two Coats Of Approved Synthetic Enamel Paint Complete As Per Specification & Direction Of Eic. Restoring The Wall Surface To Origin. , All Above Activities To Be Carried Out As Per Specification To The Complete Satisfaction Of Consumer & As Desired By Engineer-In-Charge. , Handing Over The Completed Works To Client For Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Client / Pmc. , Any Other Activity Not Mentioned/ Covered, Explicitly Above, But Otherwise Required For Satisfactory Completion/ Safety/ Statutory/ Maintenance Of Works Shall Also Be Covered Under Scope Of Work And Has To Be Completed By Contractor Within Specified Schedule Time. , All The Entry Of Gi Related Work Right From Registration Till Gas Charging/Commission Is To Be Mapped With Gail Gas Shahaj App Including Uploading The Documents Which Will Be Also Used For Certifying The Measurement By Pmc /Gail Gas And Keep Track Of Activity Of All The Contractors , The Entry Of All The Activity On Day To Day Basis Is Also In The Scope Of Bidder. , 1/2 All Floors (Including Connectivity From Tf To Regulator)- With Supply Of Gi Pipes By Contractor , 1/2 All Floors (Including Connectivity From Tf To Regulator)- With Supply Of Gi Pipes By Owner On Free Issue Basis. , 3/4 All Floors (Including Lnstalltion Of Risers)- With Supply Of Gi Pipes By Contractor , 3/4 All Floors (Including Lnstalltion Of Risers)- With Supply Of Gi Pipes By Owner On Free Issue Basis , 1 Dia All Floors (For Riser Installtions & For Commercial Connections)- With Supply Of Gi Pipes By Contractor , 1 Dia All Floors (For Riser Installtions & For Commercial Connections)- With Supply Of Gi Pipes By Owner On Free Issue Basis , Note:- , I) Refer Particular Job Specification For Supply Items. , Ii) The Quantity Measurement Shall Be From The Outlet Of The Transition Fitting (Tf) Upto The Meter. All Intermediate Gi Fittings (Excluding Valves And Regulator) Shall Be Considered While Measuring Length Of Gi Pipes. , Iii) Supply And Installation Of Isolation Ball Valves Shall Be Paid As A Separate Sor Item. , V) In Case Of Sor Items B, D & F Above (Under Sor Item No.- 7.1.1), Owner Shallsupply Plain Or Powder Coated Gi Pipes (As Free Issue) Remaining Scope Of Suppliesof Fittings Etc. Including All Associated Works Shall Be As Per Item Nos.-A, C & E (Under Sor Item No.- 7.1.1) , Supply, Installation, Testing & Commissioning Of Copper Service Pipes /Muitilayer Composite (Mlc) Pipes , Supply And Installation Of Mlc Pipe As Per Iso17484-1 Latest Standard And Installation Of Appliance Ball Valves As Per Technical Specification Alogwith Associated Acessories/Fittings Including Brass Fittings At The Outlet Of The Meter And At The Entry Of Appliance Valve As Per Satisfaction And Instruction Of Eic. The Mlc Pipe And Fittings Shall Be Procured From Approved Vendors Or From Those Vendors, Who Have Supplied These Items For Similar Application Earlier And With Prior Approved Of Owner / Pmc. , Mlc Pipe Shall Be Installed From The Downstream Of Meter Upto The Isolation/ Appliance Valve Before The Customers Appliance As Per Requirement And To The Satisfaction Of Eic. The Contractor To Provide All Equipment, Tools & Tackles And Asoociated Material Required Necessary To Execute The Work In An Efficient Manner By Cutting, Cleaning, Bending, Fixing With Cl Etc. The Work Includes Supply Of All Tools, Tackles And Consumables Including Cl S For Fixing The Mlc Pipe Andrestoration Of The Work Area To The Satisfaction Of The Customer. , 16.0 Mm Od , Note: , I) Supply And Installation Of Appliance Ball Valves Shall Be Paid As A Separate Soritem. , Ii) Sor Item No.7.2.A & 7.2.B Shall Be Carried Out Including Supply Of Materials, Onlyafter Getting Instruction / Approval From Eic. , Installation Of Meter & Conversion Of Domestic Appliance: , Installation & Fixing Of Meters With Associated Inlet/Ooutlet Connections/ Fittings, Valves, Approved Meter Brackets And Other Supports By Proper Scaffolding/ Grouting, Restoring The Area To Original Complete As Per Specification. (Meter And Regulator Willbe Provided As As Free Issue Items) , Conversion Of Domestic Appliance ,This Works Starts From Outlet Of Meters Which Includes Installation Of Gi Pipe,Appiiance Valve Etc & Other Supports By Proper Scaffolding/ Grouting, Restoring The Area To Original Completre As Per Specification.The Work Also Includes Installation And Supply Of Steel Reinforced Flexible Hose As Per Is 9573 (With Type As Per Fastest Pngrb Guidelines) (Gas Tube From End Of Isolation Valve Upto Burner/Stove) And Conevrsion Of All The Burners Of The Lpg Stove (One Per Household) Including Supply Of All Types Of Burner Nozzles/Jets And Associated Controls Etc. , Cleaning And Performing Minor Maintenance, Greasing Etc. Of Appliance, Testing/Showing Performance To The Customer ,Signing Of Joint Meter Records (Jmr) And Instructing Customer On Use & Safety Norms, Complete As Per Specifications & Tosatisfaction Of Customer , Isolation Ball Valve And Appliance Valve , Supply And Installation Of Isolation & Appliance Ball Valves As Per Technicalspecification And As Directed By Eic , Isolation Ball Valve 1/2 Max. 6 Bar (G) , Isolation Ball Valve 3/4 Max. 6 Bar (G) , Isolation Ball Valve 1 Max. 6 Bar (G) , Appliance Ball Valve 1/2 Max. 35 Mili Bar (G) , Testing,Commsioning & Integration Of Previously Laid Gi /Copper Piping Forpng Connection:-

BOQ

Sl. No. Item TitleItem Description
1PE PIPELINEPE PIPELINE
2Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/Hard surface/Pebbles/Cobbles/ Boulders/Structures/ Rock surface etc using open cut Moling (without Casing)/ Moling (with Casing)/Directional Drilling technique (with and without casing pipe) methodology.Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/Hard surface/Pebbles/Cobbles/ Boulders/Structures/ Rock surface etc using open cut Moling (without Casing)/ Moling (with Casing)/Directional Drilling technique (with and without casing pipe) methodology.
3Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.-Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification).-Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.-Casing details is as given below:-1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.-Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification).-Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.-Casing details is as given below:-1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).
4Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.
5Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.
6Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.
7Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.
8Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.
9Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.
10Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.
11Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)
12Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends /fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends /fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.
13Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.
14The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.
15The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).
16Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer- in-charge.Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer- in-charge.
17Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.
18Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)
19Handing over the completed works to owner for their operation/use, reconclation of material area wise and obtaining \\" no objection certificate\\" from owner /mecon.Handing over the completed works to owner for their operation/use, reconclation of material area wise and obtaining \\" no objection certificate\\" from owner /mecon.
20Preparation and submission of Daily progress report, Laying Graphs / PE line cardson daily basis.Preparation and submission of Daily progress report, Laying Graphs / PE line cardson daily basis.
21On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.
22In case, the minimum required depth is not possible due to site condition, necessary mitigation measures (for minimum top cover of 600mm) shall be required to be taken by contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. However required top cover can further be reduce till 375mm and payment against the same shall be made according to SOR item no. 1.3 or 1.4 (whichever is applicable).In case, the minimum required depth is not possible due to site condition, necessary mitigation measures (for minimum top cover of 600mm) shall be required to be taken by contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. However required top cover can further be reduce till 375mm and payment against the same shall be made according to SOR item no. 1.3 or 1.4 (whichever is applicable).
23Submission of all documents required for contract closure in numbers as mentioned in contract.Submission of all documents required for contract closure in numbers as mentioned in contract.
24Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.
25NOTE :NOTE :
26i) The lengths of pipelines are tentative.i) The lengths of pipelines are tentative.
27ii) For restoration of asphalt / concrete roads, the item for construction of asphalt top/ concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR.ii) For restoration of asphalt / concrete roads, the item for construction of asphalt top/ concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR.
28iii) In case, contractor prefers to lay the pipeline through HDD method in place of method as per SOR item- 1.1, contractor shall be required to lay the pipe upto a depth not more than 1.4m. The payment shall however be made as per SOR item No.- 1.1 only.iii) In case, contractor prefers to lay the pipeline through HDD method in place of method as per SOR item- 1.1, contractor shall be required to lay the pipe upto a depth not more than 1.4m. The payment shall however be made as per SOR item No.- 1.1 only.
29iv) In case quantity increases beyond 4 meter (against SOR item no 1.1.a) payment towards additional length shall be paid as per SOR item no. 1.1.b.iv) In case quantity increases beyond 4 meter (against SOR item no 1.1.a) payment towards additional length shall be paid as per SOR item no. 1.1.b.
30v) For PE laying through casing pipe ,payment for length of PE pipe will be done as per casing pipe length.v) For PE laying through casing pipe ,payment for length of PE pipe will be done as per casing pipe length.
31vi) Payment for items above under pipeline laying in all type of rocky strata shall be made only whereever hard rock is existing and supply and installationj of padding materaiIs(i.e. sand/soft soiI)shaII be done as per the direction of EIC.Bidders to quote accordingly.vi) Payment for items above under pipeline laying in all type of rocky strata shall be made only whereever hard rock is existing and supply and installationj of padding materaiIs(i.e. sand/soft soiI)shaII be done as per the direction of EIC.Bidders to quote accordingly.
32RestorationRestoration
33Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge.Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge.
34AsphaltingAsphalting
35Cement ConcreteCement Concrete
36Tiles / Paver / Blocks / Curb Stones, Red sand stoneTiles / Paver / Blocks / Curb Stones, Red sand stone
37Brick Soling / Channels, etc.Brick Soling / Channels, etc.
38Providing, hoisting and placing of 75 mm thick precast reinforced cement concrete slab of M-20 grade over pipeline as mechanical protection including the cost of required centering, shuttering, reinforcement complete as per tender drawing and direction of the EIC. Note:- Size (Length x Width) of the precast slab will be decided as per site conditionand as per instruction of EIC. Precast slab will be placed in multiple number and various location as per site condition and as per instruction of EIC.Providing, hoisting and placing of 75 mm thick precast reinforced cement concrete slab of M-20 grade over pipeline as mechanical protection including the cost of required centering, shuttering, reinforcement complete as per tender drawing and direction of the EIC. Note:- Size (Length x Width) of the precast slab will be decided as per site conditionand as per instruction of EIC. Precast slab will be placed in multiple number and various location as per site condition and as per instruction of EIC.
39Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe topcover could not be achieved 600 mm.Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe topcover could not be achieved 600 mm.
40Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.
41Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top, the RCC slab of the roof of basement shall be treated as bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top, the RCC slab of the roof of basement shall be treated as bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.
42Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumabIes,equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumabIes,equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.
43Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.
44Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.
45Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.
46Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.
47Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher].Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher].Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)
48Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques asper specification.Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques asper specification.
49Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.
50The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).
51Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer- in-charge.Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer- in-charge.
52Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.
53Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)
54Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/ Consultant.Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/ Consultant.
55On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.
56Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.
5720 mm PE 100 pipe / 32 mm PE 100 pipe20 mm PE 100 pipe / 32 mm PE 100 pipe
58Pipe laying inside Private Property i.e Multistory buildings / apartments with nomovement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.Pipe laying inside Private Property i.e Multistory buildings / apartments with nomovement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.
59Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 11Ombar.Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 11Ombar.
60Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top and RCC slab (100mm thick and 300mm width) at bohom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top and RCC slab (100mm thick and 300mm width) at bohom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.
61Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumabIes,equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc.Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of- Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumabIes,equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.
62Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.
63Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review /approval.Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review /approval.
64Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.
65Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.
66Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)
67Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.Uncoiling / stringing & aligning of PE pipes, damping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.
68Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.
69The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H>=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).
70Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.
71Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer—in—charge.
72Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work)
73Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/ Consultant.Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/ Consultant.
74On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.
75Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.
7620 mm PE 100 pipe / 32 mm PE 100 pipe20 mm PE 100 pipe / 32 mm PE 100 pipe
77Supply of GI/ MS/ Concrete Sleeves (wherever required as a Special Case as per instructions of the Engineer-in-charge)Supply of GI/ MS/ Concrete Sleeves (wherever required as a Special Case as per instructions of the Engineer-in-charge)
78Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239
79GI Sleeves /Concrete SleevesGI Sleeves /Concrete Sleeves
802 ’/,” NB, 1’ Length2 ’/,” NB, 1’ Length
814” NB, 1’ Length4” NB, 1’ Length
82MS Enamel CoatedMS Enamel Coated
834” NB, 3’ Length4” NB, 3’ Length
84Concrete Sleeve (NP-2 Class)Concrete Sleeve (NP-2 Class)
854” NB, 3’ Length4” NB, 3’ Length
866” NB, 3’ Length6” NB, 3’ Length
87The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In-Charge / OwnerThe decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In-Charge / Owner
88Fabrication & Installation of MarkersFabrication & Installation of Markers
89Warning Plate MarkersWarning Plate Markers
90Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator.Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator.
91Excavation of Hard rock/surfaceExcavation of Hard rock/surface
92Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR no. 1.1Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR no. 1.1
93Cutting of PCC/RCC surface with thickness more than 12\\" or Continuous asphalt multi-layer/ Malba/ Brick / Boulders more than 24\\".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces ofbricks/stones )Cutting of PCC/RCC surface with thickness more than 12\\" or Continuous asphalt multi-layer/ Malba/ Brick / Boulders more than 24\\".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces ofbricks/stones )
94Rock Cutting encountered while excavation of trenches for item 1.1 of SOR, not exceeding 1.5 meter in width, and lift upto 1.5 meter, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. In case of rocky soil, the bedding shall be done with approved/ good quality packing sand, subject to the approval of the EIC, the size distribution of the sand / shall be the same as per soil. The packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain.Rock Cutting encountered while excavation of trenches for item 1.1 of SOR, not exceeding 1.5 meter in width, and lift upto 1.5 meter, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. In case of rocky soil, the bedding shall be done with approved/ good quality packing sand, subject to the approval of the EIC, the size distribution of the sand / shall be the same as per soil. The packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain.
95Demolition of PCC work below plinth levelDemolition of PCC work below plinth level
96Demolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc., disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directedDemolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc., disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directed
97Core Cutting of RCC structure/Brick WallCore Cutting of RCC structure/Brick Wall
98PNG Connection to Domestic ConsumersPNG Connection to Domestic Consumers
99Installation of GI Service PipeInstallation of GI Service Pipe
100Supply, loading, storing, unloading and installation of GI pipes, including supply of GI fittings/accessories including Fittings of all sizes & thickness like Elbows, Hex NippIe,Tees, unions, sockets, reducers, GI pIugs,SIeeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials, consumables, labour and other incidental works. The scope of work excludes installation of Regulators (1/6 bar to 21 m bar with HEX nipple on inlet and outlet side of regulator) which shall be provided as free issue item. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications.Supply, loading, storing, unloading and installation of GI pipes, including supply of GI fittings/accessories including Fittings of all sizes & thickness like Elbows, Hex NippIe,Tees, unions, sockets, reducers, GI pIugs,SIeeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials, consumables, labour and other incidental works. The scope of work excludes installation of Regulators (1/6 bar to 21 m bar with HEX nipple on inlet and outlet side of regulator) which shall be provided as free issue item. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications.
101Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:Preparation and approval of schedules, execution procedures, sketches.Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:Preparation and approval of schedules, execution procedures, sketches.
102Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance.Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance.
103Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety measures including safety belts wherever required.Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety measures including safety belts wherever required.
104Installation of GI Pipes, Fittings, including NPT threading, painting as specified.Installation of GI Pipes, Fittings, including NPT threading, painting as specified.
105Drillings of holes through walls (Brick, RCC), Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackeles, using proper sealent/grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition.Drillings of holes through walls (Brick, RCC), Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackeles, using proper sealent/grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition.
106Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.
107Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin.Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin.
108All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.
109Handing over the completed works to CLIENT for operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from CLIENT / PMC.Handing over the completed works to CLIENT for operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from CLIENT / PMC.
110Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time.Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time.
111all the entry of GI related work right from Registration till Gas charging/commission is to be mapped with GAIL GAS Shahaj app including uploading the documents which will be also used for certifying the measurement by PMC /GAIL GAS and keep track of activity of all the contractors , the entry of all the activity on day to day basis is also in the scope of bidder.all the entry of GI related work right from Registration till Gas charging/commission is to be mapped with GAIL GAS Shahaj app including uploading the documents which will be also used for certifying the measurement by PMC /GAIL GAS and keep track of activity of all the contractors , the entry of all the activity on day to day basis is also in the scope of bidder.
1121/2” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Contractor1/2” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Contractor
1131/2” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Owner on Free Issue Basis.1/2” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Owner on Free Issue Basis.
1143/4” All Floors (Including lnstalltion of Risers)- with supply of GI Pipes by Contractor3/4” All Floors (Including lnstalltion of Risers)- with supply of GI Pipes by Contractor
1153/4” All Floors (Including lnstalltion of Risers)- with supply of GI Pipes by Owner on Free Issue Basis3/4” All Floors (Including lnstalltion of Risers)- with supply of GI Pipes by Owner on Free Issue Basis
1161\\" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Contractor1\\" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Contractor
1171\\" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Owner on Free Issue Basis1\\" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Owner on Free Issue Basis
118Note:-Note:-
119i) Refer Particular Job Specification for supply items.i) Refer Particular Job Specification for supply items.
120ii) The quantity measurement shall be from the outlet of the Transition Fitting (TF) upto the Meter. All intermediate GI fittings (excluding valves and regulator) shall be considered while measuring length of GI Pipes.ii) The quantity measurement shall be from the outlet of the Transition Fitting (TF) upto the Meter. All intermediate GI fittings (excluding valves and regulator) shall be considered while measuring length of GI Pipes.
121iii) Supply and installation of isolation Ball Valves shall be paid as a separate SOR Item.iii) Supply and installation of isolation Ball Valves shall be paid as a separate SOR Item.
122v) In case of SOR items b, d & f above (under SOR item No.- 7.1.1), owner shallsupply Plain or Powder Coated GI Pipes (as free issue) remaining scope of suppliesof fittings etc. including all associated works shall be as per item nos.-a, c & e (under SOR item No.- 7.1.1)v) In case of SOR items b, d & f above (under SOR item No.- 7.1.1), owner shallsupply Plain or Powder Coated GI Pipes (as free issue) remaining scope of suppliesof fittings etc. including all associated works shall be as per item nos.-a, c & e (under SOR item No.- 7.1.1)
123Supply, Installation, Testing & Commissioning of Copper Service Pipes /MuItiLayer Composite (MLC) PipesSupply, Installation, Testing & Commissioning of Copper Service Pipes /MuItiLayer Composite (MLC) Pipes
124Supply and installation of MLC Pipe as per ISO17484-1 latest standard and installation of Appliance Ball valves as per technical specification alogwith associated acessories/fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction and instruction of EIC. The MLC Pipe and fittings shall be procured from approved vendors or from those vendors, who have supplied these items for similar application earlier and with prior approved of Owner / PMC.Supply and installation of MLC Pipe as per ISO17484-1 latest standard and installation of Appliance Ball valves as per technical specification alogwith associated acessories/fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction and instruction of EIC. The MLC Pipe and fittings shall be procured from approved vendors or from those vendors, who have supplied these items for similar application earlier and with prior approved of Owner / PMC.
125MLC Pipe shall be installed from the downstream of meter upto the isolation/ appliance valve before the customer's appliance as per requirement and to the satisfaction of EIC. The Contractor to provide all equipment, tools & tackles and asoociated material required necessary to execute the work in an efficient manner by cutting, cleaning, Bending, Fixing with clamp etc. The work includes supply of all tools, tackles and consumables including clamps for fixing the MLC pipe andrestoration of the work area to the satisfaction of the customer.MLC Pipe shall be installed from the downstream of meter upto the isolation/ appliance valve before the customer's appliance as per requirement and to the satisfaction of EIC. The Contractor to provide all equipment, tools & tackles and asoociated material required necessary to execute the work in an efficient manner by cutting, cleaning, Bending, Fixing with clamp etc. The work includes supply of all tools, tackles and consumables including clamps for fixing the MLC pipe andrestoration of the work area to the satisfaction of the customer.
12616.0 mm OD16.0 mm OD
127Note:Note:
128i) Supply and installation of Appliance Ball Valves shall be paid as a separate SORItem.i) Supply and installation of Appliance Ball Valves shall be paid as a separate SORItem.
129ii) SOR item No.7.2.A & 7.2.B shall be carried out including supply of materials, onlyafter getting instruction / approval from EIC.ii) SOR item No.7.2.A & 7.2.B shall be carried out including supply of materials, onlyafter getting instruction / approval from EIC.
130Installation of Meter & Conversion of Domestic Appliance:Installation of Meter & Conversion of Domestic Appliance:
131Installation & fixing of meters with associated inlet/ooutlet connections/ fittings, valves, approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original complete as per specification. (Meter and Regulator willbe provided as as free issue Items)Installation & fixing of meters with associated inlet/ooutlet connections/ fittings, valves, approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original complete as per specification. (Meter and Regulator willbe provided as as free issue Items)
132Conversion of Domestic Appliance ,This works starts from outlet of meters which includes installation of GI pipe,AppIiance valve etc & other supports by proper scaffolding/ grouting, Restoring the area to original completre as per specification.The work also includes installation and supply of Steel reinforced Flexible Hose as per IS 9573 (with Type as per fastest PNGRB guidelines) (Gas tube from end of Isolation Valve upto burner/stove) and conevrsion of all the burners of the LPG stove (one per household) including supply of all types of burner nozzles/jets and associated controls etc.Conversion of Domestic Appliance ,This works starts from outlet of meters which includes installation of GI pipe,AppIiance valve etc & other supports by proper scaffolding/ grouting, Restoring the area to original completre as per specification.The work also includes installation and supply of Steel reinforced Flexible Hose as per IS 9573 (with Type as per fastest PNGRB guidelines) (Gas tube from end of Isolation Valve upto burner/stove) and conevrsion of all the burners of the LPG stove (one per household) including supply of all types of burner nozzles/jets and associated controls etc.
133Cleaning and performing minor maintenance, greasing etc. of appliance, testing/showing performance to the customer ,signing of Joint Meter Records (JMR) and instructing customer on use & safety norms, complete as per specifications & tosatisfaction of customerCleaning and performing minor maintenance, greasing etc. of appliance, testing/showing performance to the customer ,signing of Joint Meter Records (JMR) and instructing customer on use & safety norms, complete as per specifications & tosatisfaction of customer
134Isolation Ball Valve And Appliance ValveIsolation Ball Valve And Appliance Valve
135Supply and installation of Isolation & Appliance Ball Valves as per TechnicalSpecification and as directed by EICSupply and installation of Isolation & Appliance Ball Valves as per TechnicalSpecification and as directed by EIC
136Isolation Ball Valve 1/2 \\" max. 6 bar (g)Isolation Ball Valve 1/2 \\" max. 6 bar (g)
137Isolation Ball Valve 3/4 \\" max. 6 bar (g)Isolation Ball Valve 3/4 \\" max. 6 bar (g)
138Isolation Ball Valve 1 \\" max. 6 bar (g)Isolation Ball Valve 1 \\" max. 6 bar (g)
139Appliance Ball Valve 1/2 \\" max. 35 mili Bar (g)Appliance Ball Valve 1/2 \\" max. 35 mili Bar (g)
140Testing,Commsioning & integration of previously laid GI /Copper Piping forPNG Connection:-Testing,Commsioning & integration of previously laid GI /Copper Piping forPNG Connection:-

AI Tender Summary

OUR REF NO 57503346
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 05-10-2026
Authority
Authority Name Haridwar Natural Gas Private Limited
Work Description Bids Are invited for Custom Bid For Services - Percentage Bidding For Hiring Agencies For Lmc Work In Haridwar Ga - Pe Pipeline , Pipe Laying In Any Type Of Surface Like Unprepared Surface (Katcha Surface)/ Normal Surface/Hard Surface/Pebbles/Cobbles/ Boulders/Structures/ Rock Surface Etc Using Open Cut Moling (Without Casing)/ Moling (With Casing)/Directional Drilling Technique (With And Without Casing Pipe) Methodology. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of Pe100, Sdr11 Line Pipes Of All Sizes Including, Proper Stacking, Identification,And Supply Of Accessories Of All Sizes & Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 32 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route, Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storeage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumables, Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store.-Laying Of All Pe Pipe (Pe 100 Sdr11), Including Supply Of Hdpe Casing Pipe (In Case Of Hdd (With Case).Moling(With Case) , Couplers, End Caps Etc. (Ref. Cl. 4.3 Of Particular Job Specification).-Survey Of Under Ground Utilities, Execution Of The Work As Per Specification, Including Excavation Of Pits Moling With The Hole Size Not Exceeding 20% Of The Pipe Dia, Jointing And Insertion Of Carrier Pipe With Casing, Testing & Commissioning And Restoration Of The Pits To Original Condition, Submission Of As-Built Graph As Per Specifications And The Instruction Of Engineer-In-Charge.-Casing Details Is As Given Below:-1. For 20/32 Mm Pe Pipe (In 75 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).2. For 63 Mm Pe Pipe (In 125 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).3. For 90 Mm Pipe (In 180 Mm Dia. Hdpe Casing Pipe, Pe 63/80 Pn6.0).4. For 125 Mm Pipe (In 250 Mm Dia. Hdpe Casing Pipe, Pe63/80 Pn 6.0). , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawings. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details And Submit Same To Owner For Review / Approval. , Carrying Out Preliminary Activities Such As Preperation Of Drawings Wherever Required For Crossing Etc. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Stacking And Installation Of Construction Markers, Clearing, Fencing, Grubbing, Cutting Of Trees, Full Filling All The Requirements Of Various Statutory/ Environment Authorities To The Entire Satisfaction Of Concerned Authorities, Grading Of Work Area. , Barricading The Work Area As Per Local Authorities Norms & To The Satisfaction Of Owner/ Eingineer -In- Charge, Installation Of Safety Signs. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher]. Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends /Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques As Per Specification. , Installation / Lowering The Pipeline In Trench To Required Depth As Per Pjs, Technical Specification & Drawings, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Standard Drawings, Data Sheets & Technical Specifications, Padding Around Pipeline Including Supply Of Suitable Padding Material Duly Approved By Eic, Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil/Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against This Item Also Include Electro-Fusion Jointing Of Valves, Fittings Wherever Required And As Directed By Engineer-In-Charge. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer- In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/Use, Reconclation Of Material Area Wise And Obtaining No Objection Certificate From Owner /Mecon. , Preparation And Submission Of Daily Progress Report, Laying Graphs / Pe Line Cardson Daily Basis. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , In Case, The Minimum Required Depth Is Not Possible Due To Site Condition, Necessary Mitigation Measures (For Minimum Top Cover Of 600Mm) Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. However Required Top Cover Can Further Be Reduce Till 375Mm And Payment Against The Same Shall Be Made According To Sor Item No. 1.3 Or 1.4 (Whichever Is Applicable). , Submission Of All Documents Required For Contract Closure In Numbers As Mentioned In Contract. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , Note : , I) The Lengths Of Pipelines Are Tentative. , Ii) For Restoration Of Asphalt / Concrete Roads, The Item For Construction Of Asphalt Top/ Concrete Top / Tiles/Stone Slab/Paver Blocks/Curb Stones Shall Be Paid Separately As Per The Rates Quoted For The Same Elsewhere In The Sor. , Iii) In Case, Contractor Prefers To Lay The Pipeline Through Hdd Method In Place Of Method As Per Sor Item- 1.1, Contractor Shall Be Required To Lay The Pipe Upto A Depth Not More Than 1.4M. The Payment Shall However Be Made As Per Sor Item No.- 1.1 Only. , Iv) In Case Quantity Increases Beyond 4 Meter (Against Sor Item No 1.1.A) Payment Towards Additional Length Shall Be Paid As Per Sor Item No. 1.1.B. , V) For Pe Laying Through Casing Pipe ,Payment For Length Of Pe Pipe Will Be Done As Per Casing Pipe Length. , Vi) Payment For Items Above Under Pipeline Laying In All Type Of Rocky Strata Shall Be Made Only Whereever Hard Rock Is Existing And Supply And Installationj Of Padding Materaiis(I.E. Sand/Soft Soii)Shaii Be Done As Per The Direction Of Eic.Bidders To Quote Accordingly. , Restoration , Restoration Of The Roads, Pavements, Channels, Footpaths, Tiles, Stones Etc. To Original Condition Including Supply Of The Approved Quality Material Required, As Per Local Authorities Norms, Obtaining Noc From Concerned Local Authorities / Land Owners / Third Party Inspection Agencies (If Any) Designated By Owner And To The Satisfaction Of Engineer-In-Charge. , Asphalting , Cement Concrete , Tiles / Paver / Blocks / Curb Stones, Red Sand Stone , Brick Soling / Channels, Etc. , Providing, Hoisting And Placing Of 75 Mm Thick Precast Reinforced Cement Concrete Slab Of M-20 Grade Over Pipeline As Mechanical Protection Including The Cost Of Required Centering, Shuttering, Reinforcement Complete As Per Tender Drawing And Direction Of The Eic. Note:- Size (Length X Width) Of The Precast Slab Will Be Decided As Per Site Conditionand As Per Instruction Of Eic. Precast Slab Will Be Placed In Multiple Number And Various Location As Per Site Condition And As Per Instruction Of Eic. , Pipe Laying Inside Private Property I.E Multistory Buildings / Apartments With No Movement Of Heavy Vehicles, Surrounded With Boundary Wall Where Pipe Topcover Could Not Be Achieved 600 Mm. , Minimum Pipe Top Cover Of 375 Mm Is Required And The Line Pressure Shall Not Exceed 110Mbar. , Necessary Mitigation Measures Such As Rcc Slab (150Mm Thick And 300Mm Width) At The Top, The Rcc Slab Of The Roof Of Basement Shall Be Treated As Bottom. There Shall Be Sand Filling Across Three Sides Of The Line Pipe Of 100Mm Each Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Latest Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of 20Mm, 32Mm & 63Mm Pe Pipe (Pe 100 Sdr11) Including Proper Stacking, Identification,And Supply Of Accessories Of Below Mentioned Sizes & All Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 63 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route , Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumabies,Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store. , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawing. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details, And Submit Same To Owner For Review / Approval. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher].Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends / Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques Asper Specification. , Installation / Lowering The Pipeline In Trench To Required Depth, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Drawing No. Mec/U999/05/11/C/ And Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil / Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer- In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Owner/ Consultant. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , 20 Mm Pe 100 Pipe / 32 Mm Pe 100 Pipe , Pipe Laying Inside Private Property I.E Multistory Buildings / Apartments With Nomovement Of Heavy Vehicles, Surrounded With Boundary Wall Where Pipe Top Cover Could Not Be Achieved 600 Mm. , Minimum Pipe Top Cover Of 375 Mm Is Required And The Line Pressure Shall Not Exceed 11Ombar. , Necessary Mitigation Measures Such As Rcc Slab (150Mm Thick And 300Mm Width) At The Top And Rcc Slab (100Mm Thick And 300Mm Width) At Bohom. There Shall Be Sand Filling Across Three Sides Of The Line Pipe Of 100Mm Each Shall Be Required To Be Taken By Contractor In Consultation With Eic As Per Latest Pngrb Guidelines. No Additional Payment Shall Be Admissible Against The Same. , Receipt, Loading, Unloading, Storing, Reloading, Tranportation, Unloading, Stringing And Laying Of 20Mm, 32Mm & 63Mm Pe Pipe (Pe 100 Sdr11) Including Proper Stacking, Identification,And Supply Of Accessories Of Below Mentioned Sizes & All Thickness Like Pe Bends, Couplers, Endcaps, Tee, Reducer, Cs / Gi To Pe Fittings (I.E. Transition Fittings Of Sizes 20 Mm To 63 Mm), Warning Mat Etc.Handling, Stringing / Uncoiling, Aligning Of The Pe Line Pipe On The Pipeline Right-Of- Use / Route , Laying / Installation Of Pe Line Pipe Alongwith Required Accessories As Mentioned Above As Per Specification Wherever Required Depending On Site Condition Including Execution Of All Works; Storage Of Material In Contractors Store, Fabrication, Access For Construction Procurement And Supply Of All Materials, Consumabies,Equipments, Labour And Other Inputs.In The Case Of Free Issue Items, The Scope Also Includes, Receiving And Loading From Owners Designated Store, Transportation, Unloading And Stacking Of Free Issue Items At Contractors Store. , Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Pe Pipeline Ready For Commissioning As Per Drawing. , Surveying Of Route And Detours Required At The Time Of Execution, Preparation Of Construction Drawings Showing Survey Details, And Submit Same To Owner For Review /Approval. , Preparation And Getting Approval Of Schedules, Execution Procedures, Drawings/ Sketches/ Wherever Required, Making Trial Pits To Determine The Underground Utilities/ Services Etc., Restoration Of The Abandoned Trial Pits To Original Condition. , Barricading The Pipeline Construction Area Prior To Execution Of The Works As Per Drawing No. Mec/23Qh/05/25/M/000/011 & Mec/23Qh/05/25/M/000/10 Enclosed With Tender Document And To The Entire Satisfaction Of Owner / Engineer- In -Charge. , Laying Using Open Trench Without Casing Includes Survey Of Under Ground Utilities (Through Trial Pits), Execution Of Work As Per Specification Including Trenching To All Depths By Excavation In All Types Of Soils Including Soft/ Rocky Strata (Rock Cutting To Be Paid Separately As Per Sor No 1.120) And Different Type Of Pavement / Footpath / Roads Etc. Including Rock Breaking, Chiselling Or Otherwise Cutting Etc. As Required And Storing Excavated Soil, Reusable Materials At Designated Area As Directed By Engineer In Charge And To A Width To Accommodate The Pipeline As Per The Relevant Standard/ Specification Etc. [The Minimum Depth Of The Top Of Pipeline Shall Be 1.0 M Measured From Top Of Pipeline To The Top Of Undisturbed Surface Of The Soil Or As Per Specification/ Oisd- 226 & Pngrb Latest Guidelines Whichever Is Higher]. Dewatering Of Trenches / Pits If Required As Per Site Condition. Repairing Of All Damaged Utilities If Any, And Payment Of Any Compensation (If Claimed By Owner / Other Utility Agencies) , Uncoiling / Stringing & Aligning Of Pe Pipes, D Ing, Jointing Of The Pipe Ends / Fittings / Valves By Qualified Personnel Using Approved Electro-Fusion Techniques As Per Specification. , Installation / Lowering The Pipeline In Trench To Required Depth, Supply & Placement Of Hdpe Yellow Colour Warning Mat (Refer Pjs Item.- 4.2) Over The Pipeline Along The Complete Route As Per Drawing No. Mec/U999/05/11/C/ And Backfilling To Its Original Condition With Excavated Earth / Borrowed Select Soil / Sand Duly Approved By Eic & Its Compaction & Crowning. At Certain Specific Area Of Rou, Trench Shall Be Backfilled & Compacted And Shall Be Made Ready For Motorable. All Tiles / Slabs / Curb Stones Etc Removed During Excavation Shall Be Placed Properly And No Seperate Payment Shall Be Admissible Against This Activity. Restoration Shall Be Carried As Per Separate Sor Item Mentioned Elsewhere In The Sor Or To Be Done By Owner / Concerned Authorities. , The Scope Of Work Against Laying Of 20/32 Mm Pipe Also Includes Works Like Making Of Pcc Pedastal Of Grade (1:2:4) And Size ( (300Mm(L)X200mm(W) Xheight (H)),(H>=300Mm & Will Be As Per Site Condition) ), Supply And Installation Of Gi Sleeve (Heavy (C-Class) As Per Is-1239), Filling Of Sand And Installation Of Tf (Along With Supply). , Pneumatic Testing, Purging With Nitrogen And Commissioning As Per Specification And Approved Procedures Providing All Tools And Tackles, Nitrogen, Instruments, Manpower And Other Related Accessories And As Per The Instructions Of The Engineer-In-Charge. , Final Clean-Up Of Right-Of-Use Or Area Disturbed By Contractor During Their Construction Activities For Laying Of Pipeline Works And Disposal Of Debris And Surplus Material To Designated Disposal Areas And Backfilling Of Trench And Compaction Of The Same As Per Satisfaction Of Owner And / Or As Directed By Engineer—In—Charge. , Maintaining The Completed Pipelines And Installation For Any Defect Or Failures During Defect Liability Period (I.E. 12 Months From Date Of Completion Of Work) , Handing Over The Completed Works To Owner For Their Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Owner/ Consultant. , On Completion Of Gas Charging Of Pipelines. Preparation And Submission Of As-Built Drawings, Crossings Details, Termination, Utility Graphs And Deviation Statements. , Any Other Activities Not Mentioned / Covered Explicitly Above, But Otherwise Required For Satisfactory Completion / Operation / Safety / Statutory / Maintenance Of The Works Shall Also Be Covered Under The Scope Of Work And Has To Be Completed By The Contractor Within Specified Schedule At No Extra Cost To Owner. All The Work Shall Be Executed In Accordance With The Provision Of Contract. , 20 Mm Pe 100 Pipe / 32 Mm Pe 100 Pipe , Supply Of Gi/ Ms/ Concrete Sleeves (Wherever Required As A Special Case As Per Instructions Of The Engineer-In-Charge) , Supply, Installation Of Sleeve, Insertion Of Pipe, Sealing The Annuals, Firm Fixing Of Sleeves With Concrete Mix. Breaking Through Any Obstructions And Their Subsequent Restoration, As Per Specifications And Instructions Of The Engineer-In-Charge. Gi/Ms Pipes Shall Be Heavy (C-Class) As Per Is-1239 , Gi Sleeves /Concrete Sleeves , 2 /, Nb, 1 Length , 4 Nb, 1 Length , Ms Enamel Coated , 4 Nb, 3 Length , Concrete Sleeve (Np-2 Class) , 4 Nb, 3 Length , 6 Nb, 3 Length , The Decision Regarding Use Of Type Of Sleeves To Be Used At Various Locations Shall Be Made By Engineer In-Charge / Owner , Fabrication & Installation Of Markers , Warning Plate Markers , Supply, Fabrication And Installation Of Plate Markers, Including Application Of Approved Color And Quality Of Primer And Paint, Stencil Letter Cutting Of Lettering, Numbers, Direction, Etc. As Per The Attached Drawing In Technical Volume To Be Installed Near Regulator. , Excavation Of Hard Rock/Surface , Excavation Of Trench Or Pits, Wherever Hard Rock Presence Is Exceeding 1.5 M In Any Direction Of The Trench And Excavation Of Trench Or Pits In Malba/Multiple Layers Of Asphalt/ Brick / Pcc/Rcc Etc And Removable Only By Pneumatic Chisel / Drill As Per The Specifications And Direction Of Eic. The Rates Are Payable Over And Above The Laying Rates As Per Relevant Sor No. 1.1 , Cutting Of Pcc/Rcc Surface With Thickness More Than 12 Or Continuous Asphalt Multi-Layer/ Malba/ Brick / Boulders More Than 24.(Malba Shall Be Considered As A Strata Where Soil Is In Mixed Form Of Debris/Building Rubbish Or Discarded Pieces Ofbricks/Stones ) , Rock Cutting Encountered While Excavation Of Trenches For Item 1.1 Of Sor, Not Exceeding 1.5 Meter In Width, And Lift Upto 1.5 Meter, Including Getting Out The Excavated Soil And Disposal Of Excavated Soil As Directed Within A Lead Of 50 Meter. In Case Of Rocky Soil, The Bedding Shall Be Done With Approved/ Good Quality Packing Sand, Subject To The Approval Of The Eic, The Size Distribution Of The Sand / Shall Be The Same As Per Soil. The Packing Sand Shall Be Placed To A Minimum Thickness Of 150Mm Around The Pipe In Case Of Rocky Terrain. , Demolition Of Pcc Work Below Plinth Level , Demolishing Plain Cement Concrete (Pcc) Work (Taking All Necessary Safety Precautions) For All Depths Below Plinth Level Including Supply Of All Tools & Tackles, Necessary Scaffolding, Propping, Underpinning, Etc., Disposal Of Unserviceable Material Outside The Boundary Limits Keeping The Owner Indemnified Of Any Liabilities From Statutory/ Local Bodies, All Complete Work As Specified And Directed , Core Cutting Of Rcc Structure/Brick Wall , Png Connection To Domestic Consumers , Installation Of Gi Service Pipe , Supply, Loading, Storing, Unloading And Installation Of Gi Pipes, Including Supply Of Gi Fittings/Accessories Including Fittings Of All Sizes & Thickness Like Elbows, Hex Nippie,Tees, Unions, Sockets, Reducers, Gi Piugs,Sieeves Etc., Installation Of Gi Line (Alongwith Installation Of Required Accessories As Mentioned Above) Of Following Sizes, Including Fabrication With Supply Of All Materials, Consumables, Labour And Other Incidental Works. The Scope Of Work Excludes Installation Of Regulators (1/6 Bar To 21 M Bar With Hex Nipple On Inlet And Outlet Side Of Regulator) Which Shall Be Provided As Free Issue Item. Carrying Out All Temporary, Ancillary, Auxiliary Works Required To Make The Gi Line Ready For Commissioning As Per Drawings Specifications. , Scope Of Work Indicated In Pjs And Other Provisions Of Contract Document And Instructions Of Engineer-In-Charge, Including But Not Limited To Carrying Out The Following Works:Preparation And Approval Of Schedules, Execution Procedures, Sketches. , Finalisation Of Optimum Route With Consent Of Customer, From Transition Fitting To Cooking Oven/ Appliance. , Making Temporay But Stable Platforms/ Scaffolding/ Rope Ladders And All Other Safety Measures Including Safety Belts Wherever Required. , Installation Of Gi Pipes, Fittings, Including Npt Threading, Painting As Specified. , Drillings Of Holes Through Walls (Brick, Rcc), Granite, Marble, Glass Cutting With Proper Heavy Duty Hammer Drill Machine Tools And Tackeles, Using Proper Sealent/Grout Materialed Colors To Match The Original Replacement Of Damages During Drillling, Restoring The Area To Original Condition. , Supply & Fixing Of Approved Cl S, Dowell Plugs With Screws, Grout Material, Suitable Thread Sealant I.E. Teflon Tape/ Lock Tight, Drilling Of Holes Through Tiles/ Wood/ Marble/ Granite Etc. Jointing Of Pe To Above Ground Service Gi Pipes, Testing, Purging With Nitrogen And Commissioning Of The Complete Installation As Per Specification. , Painting Of Entire Length Of Pipe Along With Fittings After Proper Surface Finish By One Coat Of Approved Primer Paint And Two Coats Of Approved Synthetic Enamel Paint Complete As Per Specification & Direction Of Eic. Restoring The Wall Surface To Origin. , All Above Activities To Be Carried Out As Per Specification To The Complete Satisfaction Of Consumer & As Desired By Engineer-In-Charge. , Handing Over The Completed Works To Client For Operation/ Use, Reconciliation Of Material Area Wise And Obtaining No Objection Certificate From Client / Pmc. , Any Other Activity Not Mentioned/ Covered, Explicitly Above, But Otherwise Required For Satisfactory Completion/ Safety/ Statutory/ Maintenance Of Works Shall Also Be Covered Under Scope Of Work And Has To Be Completed By Contractor Within Specified Schedule Time. , All The Entry Of Gi Related Work Right From Registration Till Gas Charging/Commission Is To Be Mapped With Gail Gas Shahaj App Including Uploading The Documents Which Will Be Also Used For Certifying The Measurement By Pmc /Gail Gas And Keep Track Of Activity Of All The Contractors , The Entry Of All The Activity On Day To Day Basis Is Also In The Scope Of Bidder. , 1/2 All Floors (Including Connectivity From Tf To Regulator)- With Supply Of Gi Pipes By Contractor , 1/2 All Floors (Including Connectivity From Tf To Regulator)- With Supply Of Gi Pipes By Owner On Free Issue Basis. , 3/4 All Floors (Including Lnstalltion Of Risers)- With Supply Of Gi Pipes By Contractor , 3/4 All Floors (Including Lnstalltion Of Risers)- With Supply Of Gi Pipes By Owner On Free Issue Basis , 1 Dia All Floors (For Riser Installtions & For Commercial Connections)- With Supply Of Gi Pipes By Contractor , 1 Dia All Floors (For Riser Installtions & For Commercial Connections)- With Supply Of Gi Pipes By Owner On Free Issue Basis , Note:- , I) Refer Particular Job Specification For Supply Items. , Ii) The Quantity Measurement Shall Be From The Outlet Of The Transition Fitting (Tf) Upto The Meter. All Intermediate Gi Fittings (Excluding Valves And Regulator) Shall Be Considered While Measuring Length Of Gi Pipes. , Iii) Supply And Installation Of Isolation Ball Valves Shall Be Paid As A Separate Sor Item. , V) In Case Of Sor Items B, D & F Above (Under Sor Item No.- 7.1.1), Owner Shallsupply Plain Or Powder Coated Gi Pipes (As Free Issue) Remaining Scope Of Suppliesof Fittings Etc. Including All Associated Works Shall Be As Per Item Nos.-A, C & E (Under Sor Item No.- 7.1.1) , Supply, Installation, Testing & Commissioning Of Copper Service Pipes /Muitilayer Composite (Mlc) Pipes , Supply And Installation Of Mlc Pipe As Per Iso17484-1 Latest Standard And Installation Of Appliance Ball Valves As Per Technical Specification Alogwith Associated Acessories/Fittings Including Brass Fittings At The Outlet Of The Meter And At The Entry Of Appliance Valve As Per Satisfaction And Instruction Of Eic. The Mlc Pipe And Fittings Shall Be Procured From Approved Vendors Or From Those Vendors, Who Have Supplied These Items For Similar Application Earlier And With Prior Approved Of Owner / Pmc. , Mlc Pipe Shall Be Installed From The Downstream Of Meter Upto The Isolation/ Appliance Valve Before The Customers Appliance As Per Requirement And To The Satisfaction Of Eic. The Contractor To Provide All Equipment, Tools & Tackles And Asoociated Material Required Necessary To Execute The Work In An Efficient Manner By Cutting, Cleaning, Bending, Fixing With Cl Etc. The Work Includes Supply Of All Tools, Tackles And Consumables Including Cl S For Fixing The Mlc Pipe Andrestoration Of The Work Area To The Satisfaction Of The Customer. , 16.0 Mm Od , Note: , I) Supply And Installation Of Appliance Ball Valves Shall Be Paid As A Separate Soritem. , Ii) Sor Item No.7.2.A & 7.2.B Shall Be Carried Out Including Supply Of Materials, Onlyafter Getting Instruction / Approval From Eic. , Installation Of Meter & Conversion Of Domestic Appliance: , Installation & Fixing Of Meters With Associated Inlet/Ooutlet Connections/ Fittings, Valves, Approved Meter Brackets And Other Supports By Proper Scaffolding/ Grouting, Restoring The Area To Original Complete As Per Specification. (Meter And Regulator Willbe Provided As As Free Issue Items) , Conversion Of Domestic Appliance ,This Works Starts From Outlet Of Meters Which Includes Installation Of Gi Pipe,Appiiance Valve Etc & Other Supports By Proper Scaffolding/ Grouting, Restoring The Area To Original Completre As Per Specification.The Work Also Includes Installation And Supply Of Steel Reinforced Flexible Hose As Per Is 9573 (With Type As Per Fastest Pngrb Guidelines) (Gas Tube From End Of Isolation Valve Upto Burner/Stove) And Conevrsion Of All The Burners Of The Lpg Stove (One Per Household) Including Supply Of All Types Of Burner Nozzles/Jets And Associated Controls Etc. , Cleaning And Performing Minor Maintenance, Greasing Etc. Of Appliance, Testing/Showing Performance To The Customer ,Signing Of Joint Meter Records (Jmr) And Instructing Customer On Use & Safety Norms, Complete As Per Specifications & Tosatisfaction Of Customer , Isolation Ball Valve And Appliance Valve , Supply And Installation Of Isolation & Appliance Ball Valves As Per Technicalspecification And As Directed By Eic , Isolation Ball Valve 1/2 Max. 6 Bar (G) , Isolation Ball Valve 3/4 Max. 6 Bar (G) , Isolation Ball Valve 1 Max. 6 Bar (G) , Appliance Ball Valve 1/2 Max. 35 Mili Bar (G) , Testing,Commsioning & Integration Of Previously Laid Gi /Copper Piping Forpng Connection:-
Basic Detail
Tender No GEM/2026/B/8024374
Bidding Type Tender
Location
City Haridwar
State Uttarakhand
Key Dates
Publish Date 14 Sep 2026
Submission Date 05 Oct 2026
Open Date 06 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 7 Lakhs
Exemption Not Available
Document List
84b8a149-7626-47a5-b4e9-29f95a0628e6.pdf
1789134174.xlsx
1789134252.pdf
1789134257.pdf
1789134261.pdf
1789134275.pdf
1789134343.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Oct 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
pdf

84b8a149-7626-47a5-b4e9-29f95a0628e6.pdf

xlsx

1789134174.xlsx

pdf

1789134252.pdf

pdf

1789134257.pdf

pdf

1789134261.pdf

pdf

1789134275.pdf

pdf

1789134343.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders