Tender For Repair/Maint Including Painting/ Polishing Of Steel /Wooden Furniture At Af Stn Bhowali.
Tender Value
8.50 Lakhs
Estimated cost
Bid Submission
01 Oct 2026
6 days left
EMD
61600
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Nainital → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/Maint Including Painting/ Polishing Of Steel /Wooden Furniture At Af Stn Bhowali.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Sep-2026 | Corrigendum | Other | 01-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Bed Hard Offrs Steel MAP (FD/E6/MAP/08) |
| 2 | Taking out old unserviceable plywood top 12mm from Bed Hard and S & F of new plywood commercial 12mm BWP Grade of size 6.5'x3' including required nuts, bolts, washer, etc complete all as per drg , specified and directed by Engineer in Charge. |
| 3 | Removing of unserviceable stiffener and S&F new MS square tubing stiffener support to plywood, size 18mm x 1.6mm thick with applied synthetic enamel spray paint black of all as per drg , specified and directed by Engineer in Charge. |
| 4 | Taking out unserviceable MDF board from head rest and replace with 18mm MDF board with PVC edging screwd to MS strip all as per drg , specified and directed by Engineer in Charge. |
| 5 | Taking out unserviceable MDF board from foot rest and replace with 18mm MDF board with PVC edging screwd to MS strip all as per drg , specified and directed by Engineer in Charge. |
| 6 | Removing of unserviceable shoe and S & F new hard rubber shoes all as per drg , specified and directed by Engineer in Charge. |
| 7 | Bed Plywood Top (FD-245, FD-246) |
| 8 | Taking out old unserviceable rails of bed ply wood and S & F of new long rails of seasoned teak wood of same shape and size complete all as per drg , specified and directed by Engineer in Charge. |
| 9 | Replacement of unserviceable ply wood teak face and providing 4mm thick ply wood ISI Marked BWR teak face on one side and other commercial of size 780 x 340 mm on both side of head board complete all as per drg , specified and directed by Engineer in Charge. |
| 10 | All as per item No 2.02 above but size 780 x 180 mm for foot boards. |
| 11 | Removing old unserviceable/warnout existing plywood top from bed plywood top and supply & fixing new 12mm thick plywood BWP grade of size 1800x900mm and fixing it by minimum 18 No 30mm screw for each bed complte all as per drg , specified and directed by Engineer in Charge. |
| 12 | Taking out old unserviceable bottom supporting rails of bed ply wood top and Provision of new bottom rails of seasoned teak wood of required shape and size complete all as per drg , specified and directed by Engineer in Charge. |
| 13 | Taking out old unserviceable legs of head board supply & fixing of new legs of head board made of new seasoned teak wood of required shape and size complete all as per drg , specified and directed by Engineer in Charge. |
| 14 | Taking out old unserviceable legs of foot board supply & fixing of new legs of foot board made of new seasoned teak wood of required shape and size complete all as per drg , specified and directed by Engineer in Charge. |
| 15 | supply & fixing 4 Nos wooden corner cleat to strengthen long rails and legs made of new seasoned teak wood of required shape and size complete all as per drg , specified and directed by Engineer in Charge. |
| 16 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as per drg , specified and directed by Engineer in Charge. |
| 17 | Sofa Set 4/5 Seater (FD-281) |
| 18 | Opening and taking out old unserviceable cushion cover 21\\" x 22\\" x 4'' and supply & fixing new cushion cover made out of approved tapestry cloth as approved by AGE duly stitched with fine standard thread and providing best quality chain with runner on one side all as per drg , specified and directed by Engineer in Charge. |
| 19 | Taking out old unserviceable cushion foam 21\\" x 22\\" x 4'' and supply new cushion foam sheet 100 mm thick & 40 density complete all as per drg , specified and directed by Engineer in Charge. |
| 20 | Taking out old unservicable front or rear legs and providing new legs made out of 1st class seasoned teak wood completeall as per drg , specified and directed by Engineer in Charge. |
| 21 | Taking out old unservicable broken battens of seat and back and providing new battens made out of 1st class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 22 | Taking out old unserviceable arms and providing new arms made out of 1st class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 23 | Taking out old unserviceable side rails and providing new rails made out of 1st class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 24 | Taking out old unserviceable long rail (front or rear) of sofa chair 3 seater and providing new long rail made out of 1st class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 25 | Taking out old unserviceable long rail (front of rear) of sofa chair 1 seater and providing new long rail made out of 1st class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 26 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as per drg , specified and directed by Engineer in Charge. |
| 27 | Table Centre (FD-274 & FD-235) |
| 28 | Dismantling of unserviceable top and providing new top made of prelaminated MDF board exterior grade 18/19 mm thick BWR including 6mm thick teak wood beading all round complete all as per drg , specified and directed by Engineer in Charge. |
| 29 | M & L in Replacement of unserviceable legs with new legs made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 30 | M &L in Replacement of unserviceable short rail with new short rail made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 31 | M & L in Replacement of unserviceable long rail with new long rail made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 32 | Supply & fixing wooden corner cleat made of 1st class seasoned teakwood to strengthen long rails and legs complete all as per drg , specified and directed by Engineer in Charge. |
| 33 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as specified and as directed. |
| 34 | Table Dining 6/8 Person (FD-273, FD-239, FD-30(M)) |
| 35 | Dismantling existing unserviceable top and providing new top table dining 6 Persons of size 1500 x 900 x 18/19mm made of prelaminated MDF board exterior grade in teak shade flat pressed three layer type BWR grade ISI marked and teak wood beading all round 6 mm thick shall be provided complete all as per drg , specified and directed by Engineer in Charge. |
| 36 | M & L in Replacement of unserviceable legs of size 75 mm x 40 mm x 742 mm 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 37 | M & L in Replacement of unserviceable long rail made out of 1st class teak wood 25 mm thick and 100 mm wide complete all as per drg , specified and directed by Engineer in Charge. |
| 38 | M & L in Replacement of unserviceable short rail made out of 1st class seasoned teak wood 25 mm thick and 100 mm wide complete all as per drg , specified and directed by Engineer in Charge. |
| 39 | M & L in Replacement of unserviceable shoe with new PVC/hard rubber shoe complete all as per drg , specified and directed by Engineer in Charge. |
| 40 | Supply & fixing wooden corner cleat made of 1st class seasoned teakwood to strengthen long rails and legs complete all as per drg , specified and directed by Engineer in Charge. |
| 41 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as specified and as directed. |
| 42 | Table Peg (FD-277 & FD-236/384) |
| 43 | Dismantling of old and unserviceable top and providing new top made of pre laminated MDF board exterior grade 18/19 mm thick BWR including 6 mm thick teak wood beading all round complete all as per drg , specified and directed by Engineer in Charge. |
| 44 | M & L in Replacement of unserviceable legs with new legs made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 45 | M & L in Replacement of unserviceable short rail with new short rail made of 1st Class seasoned teak wood completeall as per drg , specified and directed by Engineer in Charge. |
| 46 | M & L in Replacement of unserviceable long rail with new long rail made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 47 | Supply & fixing wooden corner cleat made of 1st class seasoned teakwood to strengthen long rails and legs complete all as per drg , specified and directed by Engineer in Charge. |
| 48 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as per drg , specified and directed by Engineer in Charge. |
| 49 | Charpoy IP with hard top (FD/MAP-II/01) |
| 50 | Removing old unserviceable/warnout existing plywood top and supply & fixing new 12mm thick plywood BWP grade of size 1800x900mm and fixing it by minimum 18 No 30mm screw for each bed complete all as per drg , specified and directed by Engineer in Charge. |
| 51 | Removing of unserviceable shoe and supply & fixing new PVC/hard rubber shoes complete all as per drg , specified and directed by Engineer in Charge. |
| 52 | Teapoy Wooden (FD-278,FD-232) |
| 53 | Dismantling of unserviceable top and providing new top made of pre laminated MDF board exterior grade 18/19 mm thick BWR including 6 mm thick teak wood beading all round complete all as per drg , specified and directed by Engineer in Charge. |
| 54 | M & L in Replacement of unserviceable legs with new legs made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 55 | M & L in Replacement of unserviceable short rail with new short rail made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 56 | M & L in Replacement of unserviceable long rail with new long rail made of 1st Class seasoned teak wood complete all as per drg , specified and directed by Engineer in Charge. |
| 57 | Supply & fixing wooden corner cleat made of 1st class seasoned teakwood to strengthen long rails and legs completeall as per drg , specified and directed by Engineer in Charge. |
| 58 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as per drg , specified and directed by Engineer in Charge. |
| 59 | Almirah Large Steel with Shelves (FD-67/FD-1031) |
| 60 | Removing unserviceable handle and S & F CP handle of best quality 125 mm with nut and bolts complete all as specified and and as directed and as per drg. |
| 61 | Removing unserviceable locks and S&F locks 6 lever complete all as specified and and directed. Make: Harrison/ Godrej or Equivalent |
| 62 | Removing unserviceable locking device and S&F new device including MS Rod rest complete all as specified and and directed and all as per drg. |
| 63 | M & L for Adjustment of the existing shelves by providing new clamps removing unserviceable cleats complete all as specified and and directed |
| 64 | Taking out unserviceable hinges S&F new hinges of reqd size complete all as specified and and as directed and all as per drg. |
| 65 | Almirah Medium/Small Steel with Shelves (FD-243/FD-1032) |
| 66 | Removing unserviceable handle and S & F CP handle 125 mm with nut and bolts complete all as specified and and as directed and all as per drg. |
| 67 | Removing unserviceable locks and S&F locks 6 lever complete all as specified and and as directed. |
| 68 | Removing unserviceable locking device and S&F new device including MS Rod rest complete all as specified and and as directed and all as per drg. |
| 69 | M & L for Adjustment of the existing shelves by providing new clamps removing unserviceable clamps complete all as specified and and as directed. |
| 70 | Taking out unserviceable hinges S&F new hinges of reqd size complete all as specified and and as directed and all as per drg. |
| 71 | Locker Bed Side (FD-1029) |
| 72 | Removing unserviceable handle and S & F CP handle 100 mm complete all as specified and and as directed and all as per drg. |
| 73 | Removing unserviceable hasp and staple and S&F new hasp and stapple chromium plated complete all as specified and and as directed. |
| 74 | Taking out unserviceable hinges S&F new hinges of reqd size complete all as specified and and as directed and all as per drg. |
| 75 | Taking out unserviceable conduit pipe and S&F new conduit pipe 20 mm dia of 1.6 mm thick MS complete all as specified and and as directed and all as per drg. |
| 76 | Chair Verandah (FD-259) |
| 77 | Removing existing cane from chairs verandah and painting the frame with two coats of synthetic enamel paint white after preparation of surfaces and then weaving with and including new cane 4 mm wide half round and supply & fixing new PVC Shoes for chair verandah complete all as per drg , specified and directed by Engineer in Charge. |
| 78 | Chair Dining Offrs (FD/E6/MAP/10 (R)) |
| 79 | Opening and taking out old unserviceable cushion cover 440X410X75mm and supply & fixing new cushion cover made out of approved tapestry cloth duly stitched with fine standard thread and providing best quality chain with runner on one side complete all as per drg , specified and directed by Engineer in Charge. |
| 80 | Taking out old unserviceable cushion foam 440X410X75mm and supply new cushion foam sheet 40 density complete all as per drg , specified and directed by Engineer in Charge. |
| 81 | M & L in Replacement of unserviceable front legs made of 1st class seasoned teak wood complete all as specified and and directed and all as per drg. |
| 82 | M & L in Replacement of unserviceable rear legs made of 1st class seasoned teak wood complete all as specified and and directed and all as per drg. |
| 83 | M & L in Replacement of unserviceable stiffeners made of 1st class seasoned teak wood complete all as specified and and directed and all as per drg. |
| 84 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as specified all as per drg , specified and directed by Engineer in Charge. |
| 85 | Chair Easy (FD-229,FD-201,FD-281) |
| 86 | Replacement of unserviceable rail/bead for caning made of 1st class seasoned teak wood with suitable holes for caning completeall as per drg , specified all as per drg , specified and directed by Engineer in Charge. |
| 87 | M & L in Replacement of unservicable front legs with new legs made of 1st class seasoned teak wood complete all as specified and and directed and all as per drg. |
| 88 | M & L in Replacement of unservicable rear legs with new legs made of 1st class seasoned teak wood complete all as specified and and directed and all as per drg. |
| 89 | M & L in Replacement of unservicable arm rest with new of size 65x25mmx 610mm complete all as specified and and directed and all as per drg. |
| 90 | M & L in Replacement of unserviceable shoe with new PVC/hard rubber shoe complete all as specified and and directed. |
| 91 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as specified and directed. |
| 92 | M&L for running gas or electric welding as per site requirement, to make good the loose joints (size approx per joint 25mmx25mm) complete all as specified and directed. |
| 93 | M&L for MS square pipe of size 25x25x1.60mm wall thickness as in any part of steel furniture in any length as required, duly welded to the existing frame including dismantling of old unserviceable one complete all as specified and directed. |
| 94 | M&L for MS conduit pipe 20 mm bore, having 1.60 mm wall thickness as in any part of steel furniture in any length as required, duly welded to the existing frame including dismantling of old unserviceable one complete all as specified and directed. |
| 95 | M&L for preparation of the following old painted steel furniture articles of any description and in any position, filling cavities with necessary putty or other fillers to achieve even and smooth suface and applying one coat of synthetic enamel paint to achive surface even and smooth in glossy finish complete all as specified and directed: - NOTES: - (i) Painting work shall be carried out all around on the complete exposed surface including internal parts like shelves, drawers, stiffners, partions etc. with spray painting process. (ii) Newly replaced parts shall be treated with one coat of red oxide primer before painting work and cost of the same deemed included in the unit rate of these items.(iii) Cost of removing of all dent and correcting of deshaped profiles shall deemed to be included in the unit rate of these items. (iv) Surface and site shall be made neat and clean by the contractor. (v) Work shall be carried out within the area of Air Force Station Bhowali or in the Furniture yard of BSO as per direction of the Engineer-in-Charge. |
| 96 | Almirah Steel Medium with Shelves complete all as specified and directed and all as per drg FD-1032, FD-67(M) |
| 97 | Almirah Steel Large with Shelves complete all as specified and directed and all as per drg. FD-1031, FD-67 |
| 98 | Bed Hard Steel complete all as specified and directed and all as per drg. (FD/E6/MAP/08) |
| 99 | Charpoy IP with Hard Top. (MAP) |
| 100 | Locker Steel complete all as specified and directed and all as per drg. FD-1029, FD-127 |
| 101 | Book Case Steel complete all as specified and directed and all as per drg. FD-2018 |
| 102 | Rack Steel complete all as specified and directed and all as per drg. FD-1037, FD-1038 |
| 103 | Table Writing (FD-33 FD-249 FD-275) |
| 104 | Dismantling existing unserviceable top and providing new top of size 1145 x 600 x 18/19 mm made of prelaminated MDF board exterior grade in teak shade flat pressed three layer type BWR grade ISI marked and teak wood beading all round 6 mm thick shall be provieded all as specified and shown on drg, and as directed by Engr-in-Charge. |
| 105 | M & L in Replacement of unservicable legs with new legs made of 1st class seasoned teak wood complete all as specified and directed and all as per drg. |
| 106 | M & L in Repair of drawers (replacement of ply wood 6mm) including chromium plated knobs etc complete all as specified and directed. |
| 107 | M & L in Replacement of unservicable stiffeners with 1st class seasoned teak wood as per drg, and as directed by Engr-in-Charge. |
| 108 | M & L in Replacement of unserviceable drawers side with new of size 600 x 500 x 18 mm pre laminated MDF board exterior grade ISI marked complete all as specified and directed and all as per drg. |
| 109 | M & L in Replacement of unserviceable lock of drawers with new brass lock 6 lever 50 mm complete all as specified and directed and all as per drg. |
| 110 | M & L in Replacement of unserviceable shoe with new PVC/hard rubber shoe complete all as specified and directed by Engr in Charge. |
| 111 | Material & Labour for preparation of surfaces with sand / emery paper and applying french polish one or more coat of approved quality to achieve uniform smooth texture and high glossy finish after filing holes with bee's wax complete all as specified and directed. |
| 112 | Chair Writing (MAP)/Steel (Drg No FD/E6/MAP/12) |
| 113 | Taking out old/unserviceable seat and supply & fixing new seat made of 12mm thick hot pressed plywood with acrylic/poly propylene fabric( range not less than 350/RM) and moulded polyurethene foam 50 mm thick and 50 density with PVC lipping all round complete all as specified and directed and all as per drg. |
| 114 | All as per item No 20.01 above but unserviceable back complete all as specified and directed and all as per drg. |
| 115 | Taking out old broken/unserviceable arm rest of chair writing steel & supply & fixing new PU arm rest complete all as specified and directed and all as per drg. |
| 116 | Taking out unserviceable/broken frame and S&F new frame duly painted complete all as specified and directed and all as per drg. |
| 117 | Chair Computer (Drg No FD/E6/MAP/01) |
| 118 | supply & fixing new seat made of 12mm thick hot pressed plywood with fabric polyproplene /acrylic (range of fabrics not less than Rs 350/RM)and mouled polyurethene foam 40 Density with PVC lipping all around complete all as specified and directed and all as per drg. |
| 119 | All as per item No 21.01 above but back complete all as specified and directed and all as per drg. |
| 120 | Removing old broken/worn casters wheels and supply and fixing new casters wheels as existing complete all as specified and directed. |
| 121 | Pedestal assembly complete all as specified and directed and all as per drg. |
| 122 | Removing existing old broken lifting mechanism and supply and fixing new lifting mechanism including steel spring as per existing complete all as specified and directed. |
| 123 | Removing of unserviceable PVC Arm rest and supply & fixing new PVC Arm rest complete all as specified and directed. |
| 124 | Taking out old/unserviceable shifting locking lever assembly and Supply & fixing new complete all as specified and directed and all as per drg. |
| 125 | Table Bed Side (FD/E6/MAP/15(R)) |
| 126 | Taking out unservicable top of table bed side and providing new top of Prelaminated MDF board exterior grade 18/19 mm thick with PVC edging BWR grade of size 450mm x 450mm and shape complete all as specified and directed and all as per drg. |
| 127 | Taking out unservicable sides of table bed side and providing new sides of Prelaminated MDF board exterior grade 18/19 mm thick with PVC edging BWR grade of size 450mm x 450mm and shape complete all as specified and directed and all as per drg. |
| 128 | Removing of unserviceable shoe and supply & fixing new PVC/hard rubber shoes complete all as specified and directed. |
| 129 | Table 3' x 2' with drawer (FD-1008) |
| 130 | Removing unserviceable top and supply & fixing new top made out of 18/19 mm prelaminated MDF board exterior grade of shape and size with 6 mm teak wood beading all around complete all as specified and directed and all as per drg. |
| 131 | Removing unserviceable locks of drawer and S&F locks 5 lever complete all as specified and directed and all as per drg. |
| 132 | Removing unserviceable drawers and S&F new drawers made out of 1mm thick MS sheet complete all as specified and directed and all as per drg. |
| 133 | Removing of unserviceable shoe and supply & fixing new hard rubber shoes complete all as specified and directed and all as per drg. |
| 134 | Table 3' x 2' without drawer (FD-1007) |
| 135 | Removing unserviceable top and supply & fixing new top made out of 18/19 mm prelaminated MDF board exterior grade of shape and size with 6 mm teak wood beading all around complete all as specified and directed and all as per drg. |
| 136 | Removing of unserviceable shoe and supply & fixing new hard rubber shoes complete all as specified and directed and all as per drg. |
| 137 | Table office Clerk Steel (FD-84/1004) |
| 138 | Removing unserviceable top and supply & fixing new top made out of 18/19 mm prelaminated MDF board exterior grade of shape and size with 6 mm thick teak wood beading all around complete all as specified and directed and all as per drg. |
| 139 | Removing unserviceable locks of drawer and S&F new locks 5 lever complete all as specified and directed and all as per drg |
| 140 | Removing of unserviceable shoe and supply & fixing new hard rubber shoes complete all as specified and directed and all as per drg. |
| 141 | M & L for Adjustment of drawers where ever required complete all as specified and directed. |
| 142 | Charpoy GI Pipe (FD-220) |
| 143 | Taking out all old U/S material (Nylon Newar/ Plywood) from Charpoy GI pipe and cleaning of dust, wax, grease and replacing the damaged legs/short rails and elbow etc and making good the frame duly tightening all the loose joints of legs/long/short rails and make good the frame in original shape complete all as per drg , specified and directed by Engineer in Charge. |
| 144 | Supply only GI Elbow 32mm dia 3 way heavy duty ISI marked |
| 145 | Supply only check nut 32mm dia heavy duty ISI marked |
| 146 | Supply only long rail of GI pipe 32mm dia medium grade |
| 147 | Supply and fixing 12mm thick ply wood commercial BWP IS 710, 07 and fixing same with two Nos of flat iron strip of size 900mm x 32mm x 5mm, bolts, nuts and washers, bolts of size 5x65 mm- 10 Nos round head bolts after drilling the three hole of each long rail and drilling the two hole on each short rail including tightening of loose frame/fixing of loose charpoy GI pipe component to make the frame fit for fixing including two coat of syntetic enamel paint over a coat of red oxide on the the iron strip complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 21, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Oct 01, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysOct 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender