Tender For Construction Of Temporary L.T. Line, Installation Of Street Light And Other Miscellaneous Works In Sangam Area North Of Shivala Marg To End Of Mela West Of Ganga River , During Magh Mela 2026-27
Tender Value
25.38 Lakhs
Estimated cost
Bid Submission
26 Sep 2026
10 days left
EMD
25380
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Temporary L.T. Line, Installation Of Street Light And Other Miscellaneous Works In Sangam Area North Of Shivala Marg To End Of Mela West Of Ganga River , During Magh Mela 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, E.U.D.C.-I, Prayagraj Name of Work: Construction of Temporary L.T. line, Installation of Street Light and other Miscellaneous works in Sangam Area North of Shivala marg to end of mela West of ganga river , during Magh Mela 2026-27 Contract No : 26/SE/EUDC-I-Pra/MM/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Description Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Construction of Temporary L.T. line, Installation of Street Light and other Miscellaneous works in Sangam Area North of Shivala marg to end of mela West of ganga river , during Magh Mela 2026-27 which includes loading, unloading and carriage of all required materials from Mela Store to Site and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. (MS Nut & Bolts with washer for all related works will be provided by contractor on rental basis). |
| 3 | Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. Long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on roads Crossing, Ghat & 4 No. latching per span in other area) & earthing of every Fifth poles. |
| 4 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock for complete Mela period |
| 5 | Dismantling of L.T. line single phase, 4 wire after completion of Mela period. |
| 6 | Construction of L.T. line Three phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on Road crossing, Ghats and 4 nos latching per span in other area) & earthing of every Fifth poles. |
| 7 | Maintenance of L.T. Line Three phase 6 wire by providing maintenance gang round the clock for complete Mela period |
| 8 | Dismantling of L.T. line Three phase 6 wire after completion of Mela period. |
| 9 | Testing, Checking & Installation of LED Street Light Fittings including Maintenance by Mounting & fixing of street light bracket with clamps and LED street light fitting, on erected S.T.P. in proper position and making electrical connection. which includes loading, unloading and carriage of all required materials from Mela Store to Mela Area and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. |
| 10 | LED 105-120 Watt |
| 11 | LED 160-180 Watt |
| 12 | LED 245-260 Watt/Solar Light |
| 13 | Installation, Maintenance & Dismantling of L.T. P.V.C. Cable Laying of following L.T. P.V.C. Cables for giving 24 hours supply during Magh Mela 2026-27,which includes loading, unloading and carriage of all required materials from Mela Store to Mela Area and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. |
| 14 | 2x4 sq. mm./ 2x6 sq. mm./ 2x10 sq. mm. |
| 15 | 4x10 sq.mm. |
| 16 | 4x16/4x25/ 3.5x70/150 sq mm or equivalent size (single core) |
| 17 | Providing Camp Connection with 4sqmm wire in Solid PVC conduit non inflammble, and Light Fitting in camps, premises, shops etc. by fixing, fitting, tapping of connection from nearest mains with 2 core insulated cable having no joints except end terminal and all such materials required for actual energisation of these light points irrespective of their distance inside the camps, shops, premises etc will be provided by the contractor on rental basis. (All wiring should be done in Solid PVC conduit with 4sqmm wire, Solid PVC conduit non inflammble, wire and all accesories will be provided by contractor on rental basis) |
| 18 | 14/20/Rechargable 20 watt LED BULB(Rechargable Led bulb will be installed as per instruction of Je/sdo incharge) (BIS CERTIFIED) |
| 19 | 20 Watt TUBE ROD(BIS CERTIFIED) |
| 20 | 16 Amp. DOUBLE POLE MCB WITH BOX BIS CERTIFIED (Suitable for Phase & Neutral) |
| 21 | Providing Bulk supply/single points connection to Mela Area for administrative camps and all essential services by providing following capacity of distribution board (Distribution board along with all required accesories will provided by contractor on rental basis) during Magh Mela 2026-27 and dismantling after completion of Mela period. |
| 22 | Installation of Distribution board of size 2.5'x2' on wooden board with cutout of 200/100/63 amp as per requirement of site for three phase along with neutral link on rental basis. The distribution board should be fixed on iron angle frame at the height of 5' from ground level. |
| 23 | Installation of Single Phase/Three Phase (as per requirement) Distribution board having capacity of 32/16/5 amp on wooden/PVC board on rental basis. |
| 24 | Providing 5 Amp Socket & Switch Point connection for Charging Mobile/Battery for communication. |
| 25 | Providing 15 Amp Socket & Switch Point connection. |
| 26 | Painting of 9.0/11 Mtr. long ST poles (Silver Paint with Red Oxide Coating) upto 7 feet from ground level at main road and ghats, Installed pole which erected on main roads, different offices during Magh Mela 2026-27. (All required materials will be provided by the contractor). |
| 27 | Errection of 9mtr STP for CCTV Camera with it's connection of nearest Points. |
| 28 | Construction of Temporary 11/0.4KV 2x400KVA Substations and other Miscellaneous works in Sangam Area North of Shivala marg to end of mela West of ganga river ganga during Magh Mela 2026-27 which includes loading, unloading and carriage of all required materials from Mela Store to Mela Area and dismantling of all materials after completion of mela and Carriage back to Mela Store. (MS Nut & Bolts with washer, all type of lugs for all related work will be provided by contractor on rental basis). |
| 29 | Construction of four pole structure on S.T.P. 11 Mtr. long including cutting fabrication and fitting of channels/angles, painting and earthing etc Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four/six pole and dismantling after completion of Mela period. |
| 30 | Construction of double pole structure on S.T.P. 11 Mtr. long including cutting fabrication and fitting of channels/angles/G.O., D.O., plinthing, painting and earthing etc. Gang/D.O. as per requirement and dismantling after completion of Mela period. |
| 31 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. (All required material for T/F plinth will be provided by the contractor.) |
| 32 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections with proper earthing from transformer to L.T Tailless unit and dismantling after completion of Mela period. |
| 33 | Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 12 to 16 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point and dismantling after completion of Mela period. |
| 34 | Making of foundation plinth for D.G. Set of Size 14x4 ft. with the help of 1st Class Brick and its plastering with cement and Sand in ratio 1:6 which includes Installation of D.G. Set, fixing of Change Over Switch on Sub Station Angle size 65x65x6 mm and its proper connection. (All required material for D.G Set plinth will be provided by the contractor.) |
| 35 | Installation, Earthing and carriage of DG set 125/63 KVA and dismantling after completion of Mela period. |
| 36 | Iron wire mesh 6 feet hight barricading around four pole, Tailless unit and transformer plinth for saftey purpose including its painting. (All required material will be provided by the contractor.) |
| 37 | Brick barricading, singhara with bricks and painting alternatively with Geru and Lime. (All required material will be provided by the contractor.) |
| 38 | Operation, maintenance of above 11/0.4 KV, 2x400 KVA sub station during Magh Mela 2025-26 round the clock from the date of energization with the help of skilled maintenance staff (Maintenance Staff will be provided by the contractor.) (Minimum manpower must not be less than 2 people available round the clock and must be performed everyday) |
| 39 | Fixing of Fire bucket stand with four nos. buckets at various sub-station in Magh Mela 2026-27 and painting of buckets and stand. |
| 40 | Laying of L.T. PVC cable 3.5x400 sq mm or equivalent size which also include maintenance and dismantling after completion of Mela period. |
| 41 | Laying of L.T. PVC Cable 3 ½ x240 sq. mm.or equivalent size inside sand, which also includes maintenance and dismantling after completion of Mela period. |
| 42 | Laying of L.T. PVC cable 3.5x 150 sq mm or equivalent size which also include maintenance and dismantling of cable after completion of Mela period. |
| 43 | Laying of L.T. PVC cable 3.5x 70 sq mm or equivalent size which also include maintenance and dismantling of cable after completion of Mela period. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysSep 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender