Public Administrative Department Local Bodies Closing in 19 days TDR #57490374

Tender For Restoration Of 240 Kw, 11Kv Ht Induction Motor By Replacing Defective Coils And De/Nde Bearings At Anandapur Bps

Issued by Local Bodies · Kolkata, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Oct 2026
19 days left
EMD
40000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Restoration Of 240 Kw, 11Kv Ht Induction Motor By Replacing Defective Coils And De/Nde Bearings At Anandapur Bps

BOQ

Name of Work:- RESTORATION OF 240 KW, 11KV HT INDUCTION MOTOR BY REPLACING DEFECTIVE COILS AND DE/NDE BEARINGS AT ANANDAPUR BPS
Sl. No. Item Description
11. TAKING OUT THE BEARINGS (HAVING MINIMUM ID-75MM TO 200MM) WITH PROPER CARE AND CAUTION BY PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC , [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
22. TAKING OUT THE ROTOR (HAVING BALL/ ROLLER BEARINGS ETC) FROM THE STATOR AFTER SEQUENTIAL DE ASSEMBLING OF THE HT MOTOR PART BY PART & AFTER NECESSARY MEASUREMENT AND DEMARCATION AND PLACING THE SAME ON THE PEDESTAL AT THE WORKING FLOOR BY USING THE DEPARTMENTAL OVERHEAD CRANES ETC. WITH CARE & CAUTION WITH THE COMPLIANCE OF THE RELEVANT SAFETY NORMS & COMPLETE AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
33. REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
44. TAKING OUT ALL STATOR COILS AFTER TAKING NECESSARY PARAMETER FROM STATOR SLOTS VERY CAUTIOUSLY BY ARRANGING ALL THE MACHINERIES, SKILLED MANPOWER, TOOLS & TACKLES AS INVOLVED WITH PROPER CARE AND COMPLETE CAREFULLY AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
55. THOROUGH CLEANING THE 6KV RATED STATOR SLOTS FROM DUST DIRT LOOSE PARTICLES ETC AND DRYING THE STATOR SLOTS COMPLETE CAREFULLY AS PER DIRECTION OF EIC. (HOT-SPOT TEST TO BE CARRIED OUT FOR CHECKING OF HEALTHINESS OF STATOR CORE). [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019
66. REPLACEMENT OF DAMAGED COIL AS IDENTIFIED BY EIC, BY NEW IDENTICAL COILS WITH PROPER CROSS-SECTION, INSULATION, WITH CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (THE RATE IS AFTER DEDUCTING THE SALVAGE VALUE OF OLD DAMAGED COPPER COILS). [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
77. SUPPLY, FITTING & FIXING OF THE RTD SENSORS (PT100) ON EACH OF THE WINDINGS OF THREE PHASES IN ORDER TO MEASURE/MONITORING THE TEMPERATURE OF THE WINDINGS DURING THE MOTOR IS IN OPERATION. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
88. LAYING OF COILS USING WEDGES MADE OF FIBER GLASS/EPOXY LAMINATED OF SUITABLE THICKNESS FOLLOWING PROPER METHOD OF STRIPPING /FOLDING THE SLOT INSULATION, DRYING THE SLOT WEDGES ETC COMPLETE IN ALL RESPECT WITH SKILLED WORKMANSHIP MANNER, SECURING THE COILS LASHING WITH SUPPORTS CONNECTION ETC & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
99. REPLACEMENT OF LOOSE WEDGES USING NEW WEDGES MADE OF GLASS/EPOXY LAMINATED OF SUITABLE THICKNESS FOLLOWING PROPER METHOD AND COMPLETE IN ALL RESPECT SKILLED WORKMANSHIP MANNER, WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1010. EFFECTIVE SERIES CONNECTION BETWEEN COILS, SILVER BRAZING THE COILS ENDS TAPING THE JOINTS WITH CLASS-F INSULATING MATERIALS EFFECTIVE INTER-PHASE CONNECTOR AND SOLDERING WITH PROPER F-CLASS MATERIALS, CLEANING & CHECKING THE HT TERMINALS AND TAKING OUT THE WINDING LEADS TO THE TERMINALS ETC & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1111. EFFECTIVE JUMPER CONNECTION BETWEEN COILS, SILVER BRAZING THE COILS ENDS TAPING THE JOINTS WITH CLASS-F INSULATING MATERIALS EFFECTIVE INTER-PHASE CONNECTOR AND SOLDERING WITH PROPER F-CLASS MATERIALS, CLEANING & CHECKING THE HT TERMINALS AND TAKING OUT THE WINDING LEADS TO THE TERMINALS ETC & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1212. HEAT VARNISHING THE HT RATED STATOR WINDING WITH TWO COATS OF DR. BECK HTF-50 VARNISH AND SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL REQUISITE RESULT IS OBTAINED TO GET THE SATISFACTORY IR VALUE, PI VALUE, INDUCTANCE/RESISTANCE MEASUREMENT & HIGH VOLTAGE TEST & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1313. DUSTING OFF THE ROTOR OF HT RATED MOTOR BY SUITABLE BRUSH AND MOIST FREE GAS (OXYGEN)/ CLEAN DRY AIR JETTING ARRANGEMENT (PRESSURE IS NOT SO HIGH AS TO DAMAGE THE INSULATION) AND SUBSEQUENT HEATING AND CLEANING WITH PETROLEUM BASED SUITABLE ORGANIC COMPOUND THOROUGHLY ETC COMPLETE AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1414. ASSEMBLING THE HT RATED MOTOR AFTER INSERTING THE ROTOR (HAVING BALL OR ROLLER BEARINGS ATTACHMENTS ETC) INTO STATOR MAINTAINING THE PROPER 'AIR GAP' WITH CARE & CAUTION & COMPLIANCE OF THE RELEVANT SAFETY NORMS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1515. STATUTORY REQUISITE PRE-COMMISSIONING HIGH VOLTAGE TESTS OF THE HT MOTOR TO BE DONE, BY ENGAGING THE EQUIPPED AUTHORIZED AGENCY OF DIRECTORATE OF ELECTRICITY, HAVING ALL RELEVANT CALIBRATED HIGH VOLTAGE TESTING SET WITH ITS ALLIED ACCESSORIES AND DO NEEDFUL FOR A 'NO-LOAD TRIAL RUN' OF THE OF THE HT MOTOR AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC AND THE RELEVANT PRE-COMMISSION HV TEST RESULT TO BE FURNISHED TO THE EIC [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1616. COMMISSIONING THE HT MOTOR WITH' LOAD' & DO NEEDFUL OBSERVATION UNDER TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE HT MOTOR WITH LOAD & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC.[ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1717. FITTING & FIXING OF THE HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1818. FITTING FIXING OF THE BALL/ROLLER BEARING (HAVING MINIMUM ID-75MM TO 200MM) BY APPLYING THE METHOD OF EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER SUITABLE METHOD OF EXPANSION WITH PROPER CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.[ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019]
1919. DISCONNECTION OF MOTOR TERMINALS FROM ALL EXISTING CABLES CONNECTED WITH THE FEEDER BREAKER/CAPACITOR/SOFT STARTER & OTHER LT CONNECTIONS AS EXISTS VIZ MOTOR SPACE HEATER/TEMPARATURE SCANNER, EARTHENING TERMINALS ETC WITH CARE AND CAUTION WITH COMPLIENCE OF RELEVANT PROTECTION & SEFTY NORMS AND SEQUENTIAL PRE-CONDITION ASSESMENT(I.E CHECKING AND RECORDING THE MEGGER VALUE, INSULATION RESISTANCE ETC.) OF THE HT MOTOR COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019.
2020. SEQUENTIAL DE-ASSEMBLING OF THE INSPECTION COVER / WINDOWS / STRAINER /LOUVERS ETC AND DE-COUPLING OF THE HT PUMP FROM THE DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC WITH CARE & CAUTION AND KEPT THE COUPLING BOLTS IN THE DEPARTMENTAL GODOWN & COMPLATE AS PER DIRECTION OF EIC.RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019
2121. DEMOUNTING THE PARTLY DEASSEMBLED INSPECTION COVER / LOUVERS / WINDOWS ETC OF THE HT MOTOR FROM THE SOLE PLATE AND PLACING THE SAME ON THE AVAILABLE WORKING FLOOR BY USING THE DEPARTMENTAL OVERHAED CRANS ETC WITH CARE & CAUTION WITH THE COMPLIENCE OF THE RELEVANT SAFTY & PROTECTION NORMS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019
2222. TO & FRO TRANSPORTATION OF ROTOR ASSEMBLY FROM WORK SITE TO THE ROTOR REPAIRING / SERVICING WORKSHOP AND VICE-VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC.RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019
2323. TO & FRO TRANSPORTATION OF STATOR ASSEMBLY FROM WORK SITE TO THE ROTOR REPAIRING / SERVICING WORKSHOP AND VICE-VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC.RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019
2424. THOROUGH CHECKING OF ROTOR WINDING BY STATUTORY TESTING SUCH AS IR TEST, RESISTANCE/INDUCTANCE MEASUREMENT, SURGE COMPENSATION TEST AS PER RELEVANT IS CODE OF 6 KV RATED MOTOR & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG WS DATED 26.02.2019
25Supply and delivery of the following bearing (Make: SKF):6221C3
26Supply and delivery of the following bearing (Make: SKF):NU226C3
27Supply and delivery of the following bearing (Make: SKF):NU221C3
2828. PLACING THE COMPLETE ASSEMBLED MOTOR ON THE SOLE PLATE BY UTILIZING THE OVER HEAD CRANES AVAILABLE IN THE PUMPING STATION, TIGHTENING THE FOUNDATION BOLTS, FIXING THE DOWELS PINS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019.
2929. MAKING HT CONNECTION OF MOTOR TERMINAL WITH ALL EXISTING CABLES CONNECTED WITH THE FEEDER BREAKER / CAPACITOR / SOFT STATER / LT CONNECTIONS AS EXISTS OF THE MOTOR SPACE HEATER / MOTOR TEMPARATURE SCANNER & EARTHING TERMINALS ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY CEO & EX OFFICIO DG(WS) ON DATED 26.02.2019
3030. CHECKING AND ALIGNMENT OF THE MOTOR WITH RESPECT TO PUMP DONE, COMPLETE IN ALL RESPECT TO PUMP DONE, COMPLETE IN ALL RESPECTACCORDING OF E.I.C USING PRECISION DIAL GAUGE ETC & AFTER THAT THE FOUNDATION BOLT FIXED PROPERLY & COMPLETE IN ALL RESPECT ACCORDING TO THE DIRECTION OF E.I.C. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 07/01/19.
31Sub Total
32GST 18%
33CESS 1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57490374
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 01-10-2026
Authority
Authority Name Kolkata Municipal Corporation
Work Description Tender for Restoration Of 240 Kw, 11Kv Ht Induction Motor By Replacing Defective Coils And De/Nde Bearings At Anandapur Bps
Basic Detail
Tender No KMC/WS/ABPS/26-27/06
Bidding Type Tender
Location
City Kolkata
State West Bengal
Key Dates
Publish Date 12 Sep 2026
Submission Date 01 Oct 2026
Open Date 05 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 40000
Exemption Not Available
Document List
BOQ_2556261.xls
fc98e864-f484-4611-ae51-d996431c5029.html
techbid.pdf
Tendernotice_1 (39).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 12, 2026
11:30 IST

Tender Published

Tender notice published.

Today
Oct 01, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Oct 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 23 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_2556261.xls

html

fc98e864-f484-4611-ae51-d996431c5029.html

pdf

techbid.pdf

pdf

Tendernotice_1 (39).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders