Tender For Supply Installation Testing and Commissioning of Fbfm At The Output Line Of Tube Wells Feeding To Capfims, Aiims Hospital.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Sep 2026
4 days left
EMD
45100
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supply Installation Testing and Commissioning of Fbfm At The Output Line Of Tube Wells Feeding To Capfims, Aiims Hospital.
BOQ
| Sl. No. | Item Description |
| 1 | SITC of Krohne Marshall make OPTIFLUX 2000 full bore electromagnetic flow meter, tested at inhouse NABL approved lab, working on faradays law of electromagnetic induction and should be having two parts the flow sensor (primary head) and Flow transmitter / converter. The Flow sensor shall have 2 built in sensing electrodes of SS 316. The liner material shall be strictly PTFE or Hard Rubber with drinking water approval from CFTRI. The liner approval should be submitted with the offer. The flow meters should be calibrated at 3 points with water as medium at the manufacturer in house NABL accredited volume flow calibration facility in India. In case the flow meter manufacturer facility is not NABL accredited then flow meter calibration should be compulsory done at FCRI Palakkad only. Operating pressure : Max pressure 10 Kg/cm2 g, Operating temperature: 0 °C to 60 °C max , Fluid: Water, FLOW SENSOR ( PRIMARY HEAD), Type : Pulsed DC excitation, MOC of Flow tube/Meter Tube: SS 304, Lining material : Hard Rubber or PTFE, Measuring Electrode material: SS 316. Meter Flange type & MOC : Fixed Welded Flanges in CS. (Lap joints flanges or Wafer Design not acceptable), Meter Flange Pressure Rating: ANSI 150#, Flow Sensor Coil housing type & MOC: Fully Welded Construction., Material: SS 316, Junction Box MOC: SS 316 or Die Cast Aluminium, Earthing Type Grounding Ring of SS 316 on both sides of the meter, Ingress Protection: IP 67. FLOW TRANSMITTER (CONVERTER), Type: Microprocessor based, Remote/compact Version, Power supply: Universal…100…230 VAC (-15% / +10%), 50/60 Hz OR 24 VDC suitable for Solar system, Type of display: 2 Line Backlit LCD display, Display parameter: Instantaneous Flow, Sum Totalizer Flow, Forward / Reverse Totalizer, Flow Direction, Status symbols, Measuring accuracy: ±0.5% of the measured value for velocity > 0.5 m/S, Input: From flow Sensor, Outputs: 1 X 4-20mA ( HART), 1 X Pulse,1 X MODBUS RS 485,1 X Status (For Diagnosis),Communication Interface:,1 X MODBUS RS 485, 1 X HART, Application Diagnostic Functions: Empty Pipe Detection, Flow Exceeding Limit, Device/ Hardware Error, Totalizer Overflow, High Electronics Temperature. Enclosure MOC: Die Cast Aluminium, Enclosure protection class: IP 67, Programming: Keypad or Magnetic or Optical, Cable Glands: 4 nos. M20 X 1.5 Polyamide cable glands. The job involves Installing and commissioning of the flow meter and accessories. It also involves stoppage of road, managing traffic, putting up hazard signs, digging of road manually or mechanically as the case may be managing leakages, shuttering the sides to avoid transgression of dug up soil, welding fixing and alignment of meter, Covering the dug-up trench and making the road workable again to avoid disturbance to general public, managing and coordinating with other external government agencies etc. The flow meter should be IP 68 to stop damage by ingression of water/seepage. Custody and responsibility of the above system will be in customer’s scope after commissioning. In case of foreign manufacturers who do not have manufacturing facility in India the Flow meter 3 point water calibration should be compulsory done at FCRI Palakkad only or should have CE certification for the Flow Meter. The accuracy of manufacturer’s in house volume flow calibration lab should be at least 3 times better than accuracy of the flow meter. Accuracy of manufacturer’s in house volume flow calibration lab should be mentioned in NABL accreditation and should be less than +/- 0.1%. Testing of meters: Magnetic flow meter manufacturer should carry out the following test on every single flow meter during the manufacturing process and below test certificates should be provided for review during inspection and finally all certificates supplied along with the material: Three Point Water calibration certificate, Hydro test certificate, Material test certificate for Electrode, Coil housing & flow tube, Test and Guarantee Certificate. Separate Transmitter panel, LPU, FIT, MCB, power cable and signal cable of reputed make should also be provided. Department to inspect approved make’s factory to ensure that the flowmeter is manufactured by them at their factory. 150 mm |
| 2 | Supply of RTU based system : RTU controller 301 and Modbus communication with the IO modules, panel with all above mentioned modules, Panel with complete internal wiring and accessories. This also includes SIM card, UPS and all other related accessories. Provision should be there too for downloading the data 24 x 7 on PC and mobile with help of login and password ID make forbes marshall. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysSep 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender