Power Boards / Undertakings / PSU Closing in 0 days TDR #57481542

Tender For Tnpgcl- Nctps Stage Iii-Operation And Maintenance Of Ash Handling System (Mechanical & Electrical) Excluding The Ash Water Recovery System For A Period Of One Year From The Date Of Handing Over Of Site

Issued by Boards / Undertakings / PSU · Thiruvallur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Sep 2026
0 days left
EMD
4.84 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Tnpgcl- Nctps Stage Iii-Operation And Maintenance Of Ash Handling System (Mechanical & Electrical) Excluding The Ash Water Recovery System For A Period Of One Year From The Date Of Handing Over Of Site

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Sep-2026 BQR condition Technical Bid 27-Sep-2026

BOQ

Name of Work:- TNPGCL- NCTPS Stage III-Operation and Maintenance of Ash Handling System (Mechanical & Electrical) excluding the ash water recovery system for a period of One year from the date of handing over of site
Sl. No. Item Description
1Charges for providing operation staff in all locations of Bottom Ash System, Fly Ash System (including AHP control room operator) including Electrical and C&I works of AHP in NCTPP-III.
2I Mechanical Works:A ROUTINE MAINTENANCE WORKS:Fly Ash Handling System: Attending of routine maintenance work (General Shift & Night shift) for up keeping of the Transport air compressor house and its equipments, Vacuum pump house and its connected air line and water lines up to Buffer Hoppers and EOT crane, ESP Hoppers and Ash conveying Pipes in the ESP Area and ensuring the free and continuous flow of fly ash from ESP hopper to fly ash Buffer Hoppers and cleaning the air preheater, duct hoppers and ensuring the free and continuous flow of ash from APH hoppers and Duct hoppers to Buffer hoppers, fluidizing lines from blowers to ESP hoppers and fly ash conveying pipe lines, structures from Air lock vessel to ESP silos and its pneumatic lines, solenoid operated pneumatic valves of Air lock vessels, ESP hoppers, Fluidising pads, working platforms in above hoppers area and hopper gate valves, working platform area and its connected equipments like rotary vane feeders, dust conditioners, mixing pots, blower, sump pumps, vent filter and ensuring the free and continuous flow of fly ash from fly ash silo to closed, open trucks and mixing pot to slurry sump.including cost of Consumables.
3Bottom Ash Handling System: Attending of routine maintenance work (General Shift & Night shift ) for up keeping of the Bottom Ash Hopper area and its equipments like Bottom Ash Hoppers, Jaw crushers, Primary stainless steel Belt Chain Conveyors(SSBCC),Clean out chain conveyor and its connected pipelines & its discharge chute, Hydraulic Power Pack for SSBCC , Accumulator Assembly for auto chain tensioning and its pipelines, Secondary transport conveyor, Clean out chain conveyor, Clinker Grinder & its discharge chute, Quenching nozzles, Flushing nozzles, Refractory cooling nozzles, Economiser hoppers & its pipelines and ensuring the free and continuous flow of ash from Eco hoppers to Intermediate surge hopper & all valves in this area, Bottom Ash Silo area and its equipments like Bottom Ash silos and ensuring the free and continuous flow of Bottom Ash from Bottom Ash Silo to closed trucks or through mixing pot to slurry sump, Vent bag filters and silo roof structures for monorail arrangement, purging air pipes and valves, LP and HP water Pumps and its connected pipelines, Dust conditioner pumps & its connected pipelines, 5 ton and 3 ton EOT Cranes, sump drain pump, Rotary vane feeder, Discharge spout for BA Silo & all valves in this area, Tertiary Stainless steel Belt Chain Conveyor and its equipments such as clean out conveyor, dampers and view glasses, Intermediate surge hopper and its equipments such as Target box, milling, vibrating screen, Air lock vessel and its auxiliaries, connected lines, valves.including cost of Consumables.
4B. MECHANICAL BREAKDOWN MAINTENANCE:FLY ASH SYSTEM PER UNIT:ESP AND BUFFER HOPPER AREA:Charges for Removal of ash chock from ESP Hopper and ash discharge pipes and fittings: This work involves dismantling the ash discharge valve, Cast iron “T” piece, sleeve coupling and by poking and tapping of ESP Hopper remove the ash choking and then assembling the ash discharge valve ,cast-iron “T” piece and sleeve coupling after removing of chock from ESP Hoppers, APH and Duct hoppers.Including Cost of Hire charges ,Consumables and T&P's
5Charges for removal of ash chock in buffer hopper: This work involves dismantling the Ash intake gate valve above the Air lock vessel and removal of ash choke by poking and tapping the buffer hopper. Assembling the Ash intake valve after removal of choking in the buffer hopper Including Cost of Hire charges ,Consumables and T&P's
6Charges for Dismantling the Pneumatic operated valve size of 100NB. This work involves transporting the valve from stores to work site, dismantling the vent/balancing line in Air lock vessel, replacing the damaged/defective valve and fixing vent piping.Including Cost of Hire charges ,Consumables and T&P's
7Charges for Replacing of Pneumatic operated gate valve size of 150NB/200NB and manual isolation valve 150NB/200NB. This work involves transporting the valve from stores to work site, dismantling the cast iron “T” piece, sleeve coupling and valve. Assembling the new valve, sleeve coupling and cast iron “T” piece after replacing the damaged/defective valve/manual isolation valve.Including Cost of Hire charges ,Consumables and T&P's
8Charges for Dismantling of the Pneumatic operated valve size of 250NB. This work involves transporting the valve from stores to work site, dismantling the spool piece, sleeve coupling and valve. Assembling the new valve, sleeve coupling and spool piece after replacing the damaged/defective valve Including Cost of Hire charges ,Consumables and T&P's
9Charges for Dismantling of the Pneumatic operated valve size of 300NB/manual isolation valve 300NB. This work involves transporting the valve from stores to work site, dismantling the valve and replacing the defective valve with new valve.Including Cost of Hire charges ,Consumables and T&P's
10Charges for Replacing/attending the defects in Pneumatic operated valve size of 350NB. This work involves transporting the valve from stores to work site, dismantling the damaged/defective valve replacing the defective valve with new valve.Including Cost of Hire charges ,Consumables and T&P's
11Charges for Inspection of ESP buffer hoppers/bag filter chambers manually by opening the inspection door, removing the purging air pipes, fittings and valves, removing the choked bags with cages from bag filter chamber, mobilising the choked bag filters manually from 12m elevation to ground floor, cleaning the choked bag filters with compressed air, identifying the damaged bag filters and Replacing the damaged/defective bag filters with new one, assembling the bag filters with cage, positioning in the bag filter chamber, refixing the inspection door and purging air pipings, fittings and valves for bringing in to service.i) DATA for Inspection and removal of defective Bag Filters from 1 No Buffer hopper .ii) DATA for separating the bag filters from its cage, mobilising the defective bag filters to ground floor from 12 m, cleaning the bags by compressed air, identifying the defective and attending any repair in the cages (for 1 No Buffer hopper) iii) DATA for assembling the bag filters with cages, mobilising manually to 12m elevation, positioning the assembled bag filters in their respective chamber, closing the inspection door and fixing the purging air pipings (for 1 No Buffer hopper).Including Cost of Hire charges ,Consumables and T&P's
12Charges for Renewal of damaged/broken fluidized pad in ESP Hopper and Buffer hopper in ESP area Including Cost of Hire charges ,Consumables and T&P's
13VACCUM PUMP HOUSE: Charges for Renewal of damaged/wornout internals like shaft/impeller/bearing/wear rings/shaft sleeve/locknut by removing the seal water and air piping, decoupling the vacuum pump from motor, dismantling the pump casing, internals and inspecting the shaft/impeller/bearing/wear rings/shaft sleeve/locknut and replacing the damaged/wornout internals if any and reassembling the vaccum pump. i) Labour Charges for dismantling vacuum pump 1 No.ii. Labour Charges for assembling , Aligning with motor and commissioning the vacuum pump 1 No. Including Cost of Hire charges ,Consumables and T&P's
14Transport and Instrument Air Compressor HouseCharges for Renewal of damaged/wornout internals like Shaft/Twin lobe/Bearing/Locknut in blower: decoupling the blower from motor, removing the suction filter, dismantling the casing, internals and inspecting the Shaft/Twin lobe/Bearing/Locknut, Identifying the defect and replacing the wornout internals if any and reassembling the blower. i) Labour Charges for dismantling 1 No blower. ii. Labour Charges for assembling, aligning with motor and commissioning the blower.Including Cost of Hire charges ,Consumables and T&P's
15ASH SILO AND ITS EQUIPMENTS:Charges for Renewal of damaged/wornout internals like Shaft/Twin lobe/Bearing/Locknut in blower: decoupling the blower from motor, removing the suction filter, dismantling the casing, internals and inspecting the Shaft/Twin lobe/Bearing/Locknut, Identifying the defect and replacing the wornout internals if any and reassembling the blower.i) Labour Charges for dismantling 1 No blower. ii.Labour Charges for assembling, aligning with motor and commissioning the blower 1 No.Including Cost of Hire charges ,Consumables and T&P's
16Charges for Replacement of plumber block/Bearings/Sleeves in the ash conditioner. Including Cost of Hire charges ,Consumables and T&P's
17Charges for Renewal of damaged/broken fluidized pad in ash silo.Including Cost of Hire charges ,Consumables and T&P's
18Inspection of ash silo bag filter chambers manually by opening the inspection door, removing the purging air pipes, fittings and valves, removing the choked bags with cages from bag filter chamber, mobilising the choked bag filters manually from 37m elevation to ground floor, cleaning the choked bag filters with compressed air, identifying the damaged bag filters and Replacing the damaged/defective bag filters with new one, assembling the bag filters with cage, positioning in the bag filter chamber, refixing the inspection door and purging air pipings, fittings and valves for bringing in to service.i) DATA for Inspection and removal of defective Bag Filters from 1 No Ash Silo, ii) DATA for separating the bag filters from its cage, mobilising the defective bag filters to ground floor from 37 m, cleaning the bags by compressed air, identifying the defective and attending any repair in the cages (for 1 No ash silo),iii) DATA for assembling the bag filters with cages, mobilising to 37m elevation, positioning the assembled bag filters in their respective chamber, closing the inspection door and fixing the purging air pipings (for 1 No ash silo) Including Cost of Hire charges ,Consumables and T&P's
19BREAK DOWN MAINTENANCE OF BOTTOM ASH SYSTEM: Dismantling of the worn-out/Damaged plate segment of Stainless steel belt conveyor in Primary, Secondary and Tertiary conveyors after releasing the chain tension and positioning the new/reconditioned plate segment and adjusting the conveyor belt tension and normalizing the system and defective plate segment if any to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
20Renewal of the worn-out/elongated Chain links/Chain Couplers/Bar connector with bolts of clean out Scrapper Chain Conveyor in Primary, Secondary and Tertiary conveyors and normalizing the system and worn-out Chain links/Chain Couplers/Bar connector devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
21Dismantling of the worn-out/Damaged drive/driven shaft Assembly of Stainless steel belt conveyor in Primary, Secondary and Tertiary conveyors after releasing the belt tension and positioning the new/reconditioned drive/driven shaft Assembly and adjusting the chain tension and normalizing the system and wornout components if any to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
22Dismantling of the worn-out/Damaged drive/driven shaft Assembly of clean out Scrapper Chain Conveyor in Primary, Secondary and Tertiary conveyors after releasing the chain tension and positioning the new/reconditioned drive/driven shaft Assembly and adjusting the chain tension and normalizing the system and released wornout component if any to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
23Renewal of damaged Plummer block with Bearing in Primary, Secondary and Tertiary conveyors, for drive and driven shaft after releasing the clean out Scrapper Chain Conveyor tension, shifting plumber block, assembling new plumber block and bearing, positioning pulley, normalizing the clean out Scrapper Chain Conveyor tension and conducting the trial run (plumber block will be supplied by Board).Including Cost of Hire charges ,Consumables and T&P's
24Renewal of damaged Plummer block with Bearing in Primary, Secondary and Tertiary conveyors, for drive and driven shaft after releasing the SS belt conveyor tension, shifting plumber block, assembling new plumber block and bearing, positioning pulley, normalizing the SS belt tension and conducting the trial run (plumber block will be supplied by Board). Including Cost of Hire charges ,Consumables and T&P's
25Clearing of chocked ash in Economiser hoppers at 21m level and its discharge line from eco hopper to Air lock vessel by dismantling the adapter and poking, reassembling the adapter, clearing of chock in Air lock vessel at 13m level and its conveying pipe from Air lock vessel to Intermediate surge hopper.Including Cost of Hire charges ,Consumables and T&P's
26Dismantling of the worn-out/Damaged Scrapper Bar of clean out Scrapper Chain Conveyor in Primary, Secondary and Tertiary conveyors after releasing the clean out Scrapper Chain Conveyor tension, shifting scrapper bar, assembling new scrapper bar, normalizing the clean out Scrapper Chain Conveyor tension and conducting the trial run (plumber block will be supplied by Board). wornout Scrapper Bar to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
27Dismantling of the failed Gear Box for clean out Scrapper Chain Conveyor in Primary, Secondary and Tertiary conveyors, draining oil, inspection and renewal of wornout internals, bearings and oil seals, cleaning of gear teeth, refilling of oil, and reassembling the gear box internals, positioning Gear Box, aligning and normalizing the system. wornout components to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
28Dismantling of the failed Gear Box for SS BELT CONVEYOR in Primary, Secondary and Tertiary conveyors, draining oil, inspection and renewal of wornout internals, bearings and oil seals, cleaning of gear teeth, refilling of oil, and reassembling the gear box internals, positioning Gear Box, aligning and normalizing the system. wornout components to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
29Inspection and Renewal of the worn-out/damaged Internals in Clinker grinder such as Rollers, spur gears, sleeve, Dismantling bearing housing, Replacing the wornout bearings, oil seals, 'O'rings etc, and normalizing the system. wornout components to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
30Inspection and Renewal of failed Gear Box of Clinker Grinder by dismantling of all internals, cleaning of gear teeth, draining and refilling of oil, renewal of bearings and oil seals and reassembling the gear box and normalizing the system. wornout components to be devoluted to stores.Including Cost of Hire charges ,Consumables and T&P's
31Dismantling the wornout drive motor from head shaft assembly of SSBC/Clean out scrapper chain conveyor after removing power cable, fixing up of new motor with head shaft assembly, reconnecting the power cable.devoluting scrap if any to stores.Including Cost of Hire charges ,Consumables and T&P's
32Dismantling the failed Hydraulic pump for power pack of SSBC and Clean out scrapper chain conveyors after lifting the motor and fixing of new hydraulic pump, draining the contaminated oil ,cleaning the oil chamber, refilling with new oil, carry out oil flushing ,conducting the trail run after mounting motor and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
33Attending the oil leakages in hydraulic hoses /pipe lines in Primary,Secondary and Tertiary conveyors by replacing/ welding the failed pipe including oil flushing, conducting trail run and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
34Removal of chocked filter cartridge in SSBC Power Pack , Cleaning/Replacing with new filter cartridge, oil flushing,conducting trail run and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
35Dismantling of failed Hydraulic Cylinder for Bottom Ash Hopper Jaw crusher after removing all connected hydraulic hoses/ pipes, fixing of new/reconditioned hydraulic cylinder and its connected hoses/pipes and ensuring smooth operation of BAH Jaw crusher. Including Cost of Hire charges ,Consumables and T&P's
36Dismantling of motor,Lifting logs,Vibrating exciter,Liner, Sleeve plate and maintenance door and rectifying defects, reassemblying the above components, Conducting trial run and ensuring smooth operation of vibrating screen and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
37Dismantling of cover plate,motor,Liner,Sleeve plate, maintenance door, adjusting mechanism, working door, circular ring, Ring gear, Hammer mill case, Flywheel and coupler and rectifying defects, reassemblying the above components, Conducting trial run and ensuring smooth operation of Hammer mill and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
38Dismantling the failed Hydraulic pump in power pack for Tensioning of SSBC and cleanout scrapper chain conveyor,draining the contaminated oil and refilling with new oil, carrying out oil flushing, fixing of new hydraulic pump and ensuring effective operation of tension assembly of SSBC and Clean out scrapper chain conveyor and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
39Dismantling the failed equipments/internals in Hydraulic Power Pack for SSBCs such as relief valve, proportional valve, control valve etc., and fixing of new equipments/ internals and conducting the trial run and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
40Dismantling,Inspection and Renewal of damaged/wornout internals in LP seal water pump (multi stage) and seal water makeup at Fire water pump house such as impeller, shaft, balance disc, latern ring, wear ring, shaft sleeves, bearings, gland, gland packing, gasket etc, conducting trial run and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
41Dismantling,Inspection and Renewal of damaged/wornout internals in Ash humidifier pump such as impeller, shaft, latern ring, wear ring, shaft sleeves, bearings, gland, gland packing, gasket etc, conducting trial run and normalizing the system.Including Cost of Hire charges ,Consumables and T&P's
42Removal of settled ash and clinkers inside the Bottom Ash Hoppers and Boiler front & rear and dislodged boulders from Bottom Ash Hopper @3.5mt to Intermediate Surge Hopper through steel conveyors by using manual poking and electrically vibrating machine with necessary poking tools, hammering and necessary safety arrangements to carry out the work including all T&P’s and consumables etc.,(5 m² per operation) Including Cost of Hire charges ,Consumables and T&P's
43A ELECTRICAL WORKS:MOTOR - Routine Maintenance Charges for carrying walkdown check/monitoring all HT/LT AHP motors as instructed by our maintenance engineer in charge.
44Charges for preventive maintenance for 415V LT motors 7.5kW and above 1. Checking of LT motors power cable terminal tightness at motor and space heaters2. Measuring Winding resistance and IR value3. Greasing of LT motors4. Attending minor repairs and defects handling of equipments if required as directed by engineer incharge
45Motor-Breakdown maintenance Charges for removing the damage and replacing the power circuit and control circuit wiring in juction box, pendant fastoon trolley remodification work, replacing the damaged push buttons and wiring work in pendant of cranes/hoists of various kW ratings
46Removing motor coupler from old motor and refixing in new spare 415V LT 90kW and above motor as directed by engineer incharge.
47Charges for of LT motors ranging from 0.37kw to 1.5 kW-replacement of new terminal block, New bearings, cooling fan and fan cover , enshield metalizing , Machining and restacking the statorincluding consumables and T&P items (Bearing to be supplied by the contractor)
48Charges for of LT motors ranging from1.5kw to 90kW-replacement of new terminal block, New bearings, cooling fan and fan cover , enshield metalizing , Machining and restacking the statorincluding consumables and T&P items (Bearing to be supplied by the contractor)
49SWITCH GEAR :Routine and Breakdown maintenanceCharges for carring walk Down check/ monitor for any abnormalities in Dry Type Transformer as instructed by our maintenance Engineer incharge.
50Charges for checking of oil type Transformer rating (3 MVA) as directed by Engineer incharge.
51Charges for carring preventive maintenance of HT Transformer such as attending minor repairs in cooler fans and pumps ,attending oil leaks and changing silica gel measurement s of each resistance and applying betonite powder in earth pits, Tightness of terminals in marshalling boxes and motor terminals blocks , checking IR Values of winding resistance of pumps and fans , oil circulating if required , oil topping up in the conservator tank , cleaning of HV bushings and lightening arrestor and tightness checking as well, checking of IR values of the Transformers, Taking of oil samples and checking of BDV Values in Transfomer oil if required .
52Charges for External cleaning of 6.6 KV HT breakers switch gear pannels /Dry type Transformers / LT modules , WDB, MLDB's, 220 volt Battery charger pannels and etc as directed by the TANGEDCO Engineer .
53Charges for checking the condition monitoring of mechanism and lubricating of HT breakers (6.6 KV)/ LT breakers AND checking , cleaning of fingers contactors of circuit breakers ,Tightness checking terminals.
54Batteries:• Monitoring of all Battery Chargers & Batteries daily.• Measuring of Pilot Cell Voltage & Specific gravity for 220V, 24V& UPS Batteries.• Recording Charger voltage, Charger Amps, Battery
55CABLES: ROUTINE MAINTENANCE Routine checking of HT Cable route and Terminations - Walk down throughout the route of the cable to check any cable abnormalities: 1. Cable insulation damage,2. Noises in Cable joints,3. cable tray damage, 4. Rodent disturbances, 5. damage of cable dressing, 6. Trees and bushes intervention, 7. corrosion of supports, etc.
56Charges for various sizes of LT power, control, instrumentation and lighting cables cleaning, dressing, binding and relaying in the cable trays in cable trays erection areas and cleaning the fly ash, coal dust deposit from the cable trays and binding of disturbed cables while cleaning
57Charges for Maintenance of Ash Silo lift. Cleaning of all panels in lift, control/power modules, Battery Units and checking the tightness of terminals as per direction of Engineer incharge
58CABLES: BREAKDOWN MAINTENANCE CABLES: Charges for laying /Dismantling /relaying HT 6.6 kV 3CX120 Sqmm, 11kV 3CX185 Sqmm & 11kV 3CX240 Sqmm, 11kV 1CX240 Sqmm, 11kV 1CX630 Sqmm & 6.6kV 3CX95 Sqmm Armoured Aluminium Power Armoured Aluminium Power cable including loading, transporting & unloading of cable from central stores to site and devoluting the remaining to the stores.
59Charges for dismantling/relaying , of various sizes of LT power, control cables and instrumentation cables from various locations.
60Charges for Straight through joint of1) 1CX 16 / 35/ 120/400/630 sqmm. 2) 2CX2.5/4/6/10/25/50/953) 3C X 2.5/10/16/25/50/95/150/185/240 4) 4CX10 sq.mm Armoured Aluminium Power cable.
61LIGHTING - ROUTINE MAINTENANCE Charges for cleaning light fittings shades, glass, ballast and other related accessories of various rating in service in peripheral buildings once in two months
62Charges for Monthly LDB Cleaning and tightness checking in peripheral Buildings
63Charges for Monthly cleaning of LP box and tightness checking of terminals in peripheral Buildings
64Charges for Complete overhauling and maintenance of Lighting DBs in Peripheral buildings
65LIGHTING - BREAKDOWN MAINTENANCE Lighting : Charges for attending circuit fault of light fittings and receptacles at various locations / elevations of peripheral buildings with required T&Ps
66Charges for Defective replacement /Repairing of light fittings shades, glass, ballast and other related accessories of various rating in service in peripheral buildings.
67Charges for replacement/repairing of burnt/failed MCBs in LP boxes in peripheral Buildings
68Charges for rewiring of LP including dismantling in peripheral Buildings whenever main fault occurs.
69ELECTRICAL MRT WORKS: Charges for Preventive maintenance and periodical cleaning (i.e. weekly, Monthly, Quarterly and Half yearly) of protection relay compartments in 6.6 KV, 415 V Switchgear panels, Data Concentrator panels and Marshaling Box and its controls of Transformers (11/6.9kV) and Transformers (11/0.415kV) in AHP area as instructed by Engineer in charge.
70Charges for Testing of protection relays, Transducer, TVM / Multi-function meter, Analog/Digital Meters and replacing defective Relays, transducers and meters if required, CT terminal tightness checking in 11 kV, 6.6kV, 415 V switchgear panels and Marshalling box of Transformers (11/6.6kV) & (11/0.4515kV) as instructed by Engineer in charge.
71Charges for Checking the AC & DC control circuits, identifying the defective parts and rectification in 11KV, 6.6 KV, 415 V Switchgear panels, Control Panels of DG-1 & 2, Data Concentrator panels and Marshaling Box and its controls of Transformers (11/6.9kV) and Transformers (11/0.415kV) in AHP area as instructed by Engineer in charge.
72Charges for daily walk down to 11kV, 6.6 kV, 415V switchgears, incomers and bus coupler panels, Data concentrator to check the healthiness of relay, meters and record the electrical parameters.
73C&I WORKSCharges for cleaning of outer portion of the Junction Boxes, field instruments like Pressure transmitter, Temperature transmitter, Flow Transmitter, Level Transmitter, DPT & gauges, Solenoid/ Control Valves, PLC panels, UPS panels, VMS panels checking and cleaning of all the above without disturbing the system operation by carring out daily walkdown. Arresting holes in cable entries inside the panels listed above, if required, to avoid dust accumulation. Attending minor repairs if any, ensuring proper closing of JBs/panels including consumables under the technical guidance of TNPGCL Engineers.
74Charges for checking healthiness of automation system of PLC A&B in Ash Handling System OWS, OEWS, LVS and printers, checking healthiness of control room network, Panel networks, other systems interfacing networks and attending minor rectification if required, attending to the network (OWS,OEWS,LVS, printers) functionality issues reported by the operators and rectification of the same including consumables under the guidance of TNPGCL Engineers.) 2 operations per month).
75Charges for checking functionality healthiness of UPS system in Ash Handling System, attending the minor rectification works, attending the UPS functionality issues reported by the operators and rectification of the same including consumables under the Technical guidance of TANGEDCO Engineers.(1 operations per month).
76Charges for cleaning of batteries in Ash Handling Plant, checking pilot cell reading by carrying out daily walk down and duly entering in the battery maintenance register including consumables under the Technical guidance of TANGEDCO Engineers
77Charges for carrying out monthly maintenance of battery banks and respective Battery Health montioring system, measuring battery bank & individual cell voltages, measuring specific gravity for individual cells and duly entering in the battery maintenance register, checking the tightness of inter cell connectors and total outgoing cable system, top-up of distilled/DM water in battery cells and attending the minor rectification works, in the battery bank including consumables under the Technical guidance of TANGEDCO Engineers.( 1 operation per month.)
78Charges for carry out preventive maintenance/minor repair works of field instruments and checking healthiness of all field instruments like transmitters, RTD, Thermocouples, Pressure/temperature gauges & switches, all Solenoid/ Control Valves, and their display units, physical condition at local and attending to the minor rectification works, attending to the instruments functionality issues reported by the operators and rectification of the same including consumables under the Technical guidance of TANGEDCO Engineers. (2 operations per month)
79Charges for attending minor repair works in impulse lines, JBs, when necessary with all welding equipments Isolation of the damaged portion/impulse line circuits as directed by the TANGEDCO Engineer-in-charge, removal of lines, damaged portions by welding/cutting or by manually which ever is applicable, replacing the end ferrules , repainting the lines with anticorrosive paint. Refixing/modifying the circuits with healthy materials by welding or manually with necessary arrangements, ensuring proper work completion and re-insertion of the circuit with healthy conditions including consumables under the technical guidance of TANGEDCO Engineers. (one operation / month )
80Charges for attending C&I cable fault from JB to field in all AHP areas from Instruments, panels, motors, solenoid/control valves, local JBs and other equipments tracing the healthiness of cable up to control room including consumables under the technical guidance of TANGEDCO Engineers.(Approx. 10 faults per month) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57481542
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 27-09-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Tnpgcl- Nctps Stage Iii-Operation And Maintenance Of Ash Handling System (Mechanical & Electrical) Excluding The Ash Water Recovery System For A Period Of One Year From The Date Of Handing Over Of Site
Basic Detail
Tender No CE/SE/M II/NCTPS Stage III / 03 /2026-27
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 21 Sep 2026
Submission Date 27 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4.84 Lakhs
Exemption Available
Document List
BOQ_846093.xls
d596a3da-82b0-4cc3-956f-55e1d63f6330.html
SpecOT03.pdf
Tendernotice_1 (19).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 27, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Today
Sep 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today

Tender Documents

Download All (ZIP) ↓
xls

BOQ_846093.xls

html

d596a3da-82b0-4cc3-956f-55e1d63f6330.html

pdf

SpecOT03.pdf

pdf

Tendernotice_1 (19).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders