Tender For Construction Work From Malahpurwa To Balua Dala Via Ramkola Tola Belma In The Financial Year 2026–27, Including 5 Years Of Maintenance And Repairs — Lot No. 8 Of 12.
Tender Overview
Project Description
Tender For Construction Work From Malahpurwa To Balua Dala Via Ramkola Tola Belma In The Financial Year 2026–27, Including 5 Years Of Maintenance And Repairs — Lot No. 8 Of 12.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Sep-2026 | work time of complition and RMC | Other | 19-Sep-2026 |
| 2 | 12-Sep-2026 | work time of complition and RMC | Other | 22-Sep-2026 |
| 3 | 15-Sep-2026 | Date | Date | 22-Sep-2026 |
| 4 | 12-Sep-2026 | work time of complition and RMC | Other | 19-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 2 | Cemented sub base (GSB+2% Cement (OPC))Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with 2% cement (OPC) with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired denisity complete as per techinical specifiaction clause 401 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 3 | Cemented Base (WBMIII + Cement 4% OPC)Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity Gradeing 3 as per technical specification clause 405 including 4% Cement (OPC) & its mixing with Rotavator. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 4 | Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503. and as per direction of E/I. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508.. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 6 | Providing and applying seal coat type \\"C\\" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST) |
| 8 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 20 Rs.18033900.00 @ Zero percent & for 2nd year @ 0.75% |
| 9 | For 3rd Year @ 1.50% |
| 10 | For 4th Year @ 2.25% |
| 11 | For 5th Year @ 3.00% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender