Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; As Per Atc; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Attending Chockages Complaints Of External Sewer Lines Including Removal Of Choc
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; As Per Atc; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Attending Chockages Complaints Of External Sewer Lines Including Removal Of Chockages In Rectangular Inspection Chambers And Circular Manhole Chambers & External Sewer Lines And Removing Hard Chockages Through Openings Made On Pipe Lines, Closing This Openings After The Work Is Completed Including Removing All Settlements, Silt, Stones, Other Wastes Thoroughly With Flexible Steel Rods, Ms Rods, Powdas, Split Bamboos, Brushes And Other Cleaning Attachments To Facilitate Smooth Flow, Closing Of Rat Holes And Other Gaps Around Connections & Other Openings, Lifting The Rubbish & Other Waste Materials, Transporting And Dumping The Same At Suitable Locations Within 500M. Lead Levelling Stacking Etc. All Complete As Directed By The Engineer-In-Charge , Between Gully Trap & Inspection Chambers , Between Rectangular Inspection Chambers , Between Circular Manhole Chambers , Earthwork For Pipes, Sewers, Cables Etc Upto Following Depth In All Soils Other Than Soft And Hard Rock Including Shoring, Dewatering Till Completion Of Work Wherever Necessary, & Refilling The Trenches With Selected Excavated Earth In Layers Not Exceeding 25Cm. Thick, Watering, Consolidating And Removing Surplus Materials To A Distance Not Exceeding 150M & Disposing Off All As Per Specifications & As Directed By The Engineer-In-Charge , Upto 1.50M Depth From Gl , From 1.50M To 3.0M Below Gl , Plain Cement Concrete 1:2:4 Using Graded Stone Aggregate Of 40Mm Maximum Size Including Consolidation, Formwork, Scaffolding, Finishing, Curing Etc. Complete All As Per Specifications & As Directed All As Per Specifications & As Directed By Eic , Brick Work In Cement Mortar 1:6 Using Well Burnt Locally Available Bricks Of Approved Quality Including Raking Out Joints Above Ground Level Simultaneous Pointing Below Ground Level, Curing, Scaffolding, Demolishing Existing Brick Work At All Levels And Disposal Of Debris Out Side Of Colony Etc. All Complete As Per Specification And As Directed By Engineer-In-Charge. , Water Proof Cement Plaster 20Mm Thick In Cement Mortar 1:3 With Water Proofing Compound @ 2% By Weight Of Cement For External Wall Surfaces Of Sewer Line Chambers Including Preparation Of Surface Removing & Disposal Of Damaged Plaster Curing Including The Cost Of Water Proofing Compound , Maintaining And Cleaning :-Grease Trap Chambers, Which Arrest Oil And Solid Particles During Flow, Are Collected In Chambers,Arresting Material In Chamber Creates Severe Unhygienic Condition In The Surrounding Area And It Should Be Clean, This Item Includes As Follows , Flushing Of Sewer Line 160Mm Nom.Dia From Sector Market To Dilwara Bldg.At Anushaktinagar. Above Said Work Includes 1) Filling Of Sintex Tanks (5000 Ltrs.*2 Nos.) Water Supplied By Department. 2) Operation Of Valves From Sintex Tank For Flushing Inspection Chamber, Provided In Existing System For Flushing. 3) Removing Of Floating And Settled Materials, Oil And Grease, From Surrounding Which Are Produce During Flushing. 4) In Case Of Overflowing Of Chambers During Flushing , Contractor Should Do Necessary Arrangements For Smooth Flow , And Removing Water Comes During Flushing On Ground. , Cleaning Of Manholes By Cleaning Machines:- , Machines Operated Cleaning Of Sewer Line :-
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Attending chockages complaints of external sewer lines including removal of chockages in rectangular inspection chambers and circular manhole chambers & external sewer lines and removing hard chockages through openings made on pipe lines, closing this openings after the work is completed including removing all settlements, silt, stones, other wastes thoroughly with flexible steel rods, MS rods, powdas, split bamboos, brushes and other cleaning attachments to facilitate smooth flow, closing of rat holes and other gaps around connections & other openings, lifting the rubbish & other waste materials, transporting and dumping the same at suitable locations within 500M. Lead levelling stacking etc. all complete as directed by the Engineer-in-Charge | Attending chockages complaints of external sewer lines including removal of chockages in rectangular inspection chambers and circular manhole chambers & external sewer lines and removing hard chockages through openings made on pipe lines, closing this openings after the work is completed including removing all settlements, silt, stones, other wastes thoroughly with flexible steel rods, MS rods, powdas, split bamboos, brushes and other cleaning attachments to facilitate smooth flow, closing of rat holes and other gaps around connections & other openings, lifting the rubbish & other waste materials, transporting and dumping the same at suitable locations within 500M. Lead levelling stacking etc. all complete as directed by the Engineer-in-Charge |
| 2 | Between gully trap & inspection chambers | Between gully trap & inspection chambers |
| 3 | Between rectangular inspection chambers | Between rectangular inspection chambers |
| 4 | Between Circular manhole chambers | Between Circular manhole chambers |
| 5 | Earthwork for pipes, sewers, cables etc upto following depth in all soils other than soft and hard rock including shoring, dewatering till completion of work wherever necessary, & refilling the trenches with selected excavated earth in layers not exceeding 25cm. Thick, watering, consolidating and removing surplus materials to a distance not exceeding 150m & disposing off all as per specifications & as directed by the Engineer-in-Charge | Earthwork for pipes, sewers, cables etc upto following depth in all soils other than soft and hard rock including shoring, dewatering till completion of work wherever necessary, & refilling the trenches with selected excavated earth in layers not exceeding 25cm. Thick, watering, consolidating and removing surplus materials to a distance not exceeding 150m & disposing off all as per specifications & as directed by the Engineer-in-Charge |
| 6 | Upto 1.50m depth from GL | Upto 1.50m depth from GL |
| 7 | From 1.50m to 3.0m below GL | From 1.50m to 3.0m below GL |
| 8 | Plain cement concrete 1:2:4 using graded stone aggregate of 40mm maximum size including consolidation, formwork, scaffolding, finishing, curing etc. complete all as per specifications & as directed all as per specifications & as directed by EIC | Plain cement concrete 1:2:4 using graded stone aggregate of 40mm maximum size including consolidation, formwork, scaffolding, finishing, curing etc. complete all as per specifications & as directed all as per specifications & as directed by EIC |
| 9 | Brick work in cement mortar 1:6 using well burnt locally available bricks of approved quality including raking out joints above ground level simultaneous pointing below ground level, curing, scaffolding, demolishing existing brick work at all levels and disposal of debris out side of colony etc. all complete as per specification and as directed by Engineer-in-Charge. | Brick work in cement mortar 1:6 using well burnt locally available bricks of approved quality including raking out joints above ground level simultaneous pointing below ground level, curing, scaffolding, demolishing existing brick work at all levels and disposal of debris out side of colony etc. all complete as per specification and as directed by Engineer-in-Charge. |
| 10 | Water proof cement plaster 20mm thick in cement mortar 1:3 with water proofing compound @ 2% by weight of cement for external wall surfaces of sewer line chambers including preparation of surface removing & disposal of damaged plaster curing including the cost of water proofing compound | Water proof cement plaster 20mm thick in cement mortar 1:3 with water proofing compound @ 2% by weight of cement for external wall surfaces of sewer line chambers including preparation of surface removing & disposal of damaged plaster curing including the cost of water proofing compound |
| 11 | Maintaining and Cleaning :-Grease trap chambers, which arrest oil and solid particles during flow, are collected in chambers,Arresting material in chamber creates severe unhygienic condition in the surrounding area and it should be clean, this item includes as follows | Maintaining and Cleaning :-Grease trap chambers, which arrest oil and solid particles during flow, are collected in chambers,Arresting material in chamber creates severe unhygienic condition in the surrounding area and it should be clean, this item includes as follows |
| 12 | Flushing of sewer line 160mm nom.dia from sector market to Dilwara bldg.at Anushaktinagar. Above said work includes 1) Filling of Sintex tanks (5000 Ltrs.*2 Nos.) water supplied by department. 2) Operation of valves from Sintex tank for flushing inspection chamber, provided in existing system for flushing. 3) Removing of floating and settled materials, oil and grease, from surrounding which are produce during flushing. 4) In case of overflowing of chambers during flushing , contractor should do necessary arrangements for smooth flow , and removing water comes during flushing on ground. | Flushing of sewer line 160mm nom.dia from sector market to Dilwara bldg.at Anushaktinagar. Above said work includes 1) Filling of Sintex tanks (5000 Ltrs.*2 Nos.) water supplied by department. 2) Operation of valves from Sintex tank for flushing inspection chamber, provided in existing system for flushing. 3) Removing of floating and settled materials, oil and grease, from surrounding which are produce during flushing. 4) In case of overflowing of chambers during flushing , contractor should do necessary arrangements for smooth flow , and removing water comes during flushing on ground. |
| 13 | Cleaning of manholes by Cleaning Machines:- | Cleaning of manholes by Cleaning Machines:- |
| 14 | Machines operated cleaning of sewer line :- | Machines operated cleaning of sewer line :- |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender