Tender For Annual Maintenance Contract (Amc) For Erection, Diversion And Dismantling Of 440/220V Overhead Electrical Lines Comprising Metallic Tubular Poles, Aaac Conductors, Shackle And Pin Insulators, Channels And Other Iron Materials, Including En
Tender Overview
Project Description
Tender for Annual Maintenance Contract (Amc) For Erection, Diversion And Dismantling Of 440/220V Overhead Electrical Lines Comprising Metallic Tubular Poles, Aaac Conductors, Shackle And Pin Insulators, Channels And Other Iron Materials, Including Engagement Of Skilled Manpower For Climbing On Poles For Dismantling And Erection Of Light Fittings, As And When Required, At Tetariakhar Open Cast Project (Ocp) Under Rajhara Area.
BOQ
| Sl. No. | Item Description |
| 1 | Erection of metallic pole of following length in cement concrete1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. asrequired .Above 10.00 metre and upto 12.00 metre |
| 2 | Dismantling of pole/ street light standard/strut embedded in cement concrete foundation etc. as required. |
| 3 | Supplying and erection of 100 mm X 65 mm pin insulator complete with G. I. Spindle and nuts etc. as required . |
| 4 | Supplying and erection of 75 mm X 90 mm shackle insulator with G. I. Bolt, nuts and straps etc. as required . |
| 5 | Erection of LV/MV shackle/pin insulator etc. as required. |
| 6 | Supply of G.I. wire 8 SWG ( Galvanized Iron Fencing Wire 85.00/1.18=72.03) Cradling 30 places X 50 Mtr X 6 WIRE X 131 Kg P/Kmtr X 1.05 =1237.95Kg) |
| 7 | Erection of G.I. Wire No. 8 SWG including binding etc. as required. |
| 8 | Erection of cradle guard as required. |
| 9 | Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diameter including binding etc. as required. 1.5 Km X 3 WIRE X 149.2 Kg/Km X 1.05=704.97 |
| 10 | Dismantling of over head lines comprising of copper/ aluminium over head conductor, Cl. wire, cross arms,insulators etc. as required .(704.97x1.25 = 881.21Kg) (conductor + insulator,channel iron,cross arm , nut bolt etc.) |
| 11 | Erection of angle iron/ channel iron cross arm on wood/ RCC/ PCC/ steel tubular/ rail pole etc. as required. |
| 12 | Supplying and erection of stay set complete (galvanised) with 19/20mm diaX1.8metres long stay rod,anchor plate of size 45cmX45cmX 7.5mm, thimble,stay clamps, turnbuckle (20mmX60cm), 7/4.00 mm dia G.I. stay wire and strain insulator etc in cementconcrete 1:3:6 (1cement :3 coarse sand: 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. |
| 13 | Providing the manpower for climbing on pole for dismantling and erection of light fittings. whenever required |
| 14 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender