Tender For For New Connection Work In Full Deposit Item In The Area Of Work Of Electricity Distribution Section Palia
Tender Overview
Project Description
Tender For For New Connection Work In Full Deposit Item In The Area Of Work Of Electricity Distribution Section Palia 1 Safe Loading Carriage & Unloading Of Following Materials From Centre Store, Lakhimpur To Different Work Sites And Its Stacking Distance Approx (0-100) Kms 2 Line Material 3 Pcc Pole 8.5 Mtr.Long 4 Pcc Pole 9.0 Mtr.Long 5 Pcc Pole 11.0 Mtr.Long 6 Stp Pole 11 Mtr. Long 7 T/F 10/16 Kva 8 T/F 25 Kva 9 T/F 63 Kva 10 T/F 100 Kva 11 T/F 250 Kva 12 Acsr Weasel Conductor 13 Acsr Rabbit Conductor 14 Acsr Dog Conductor 15 Lt Abc (1X25+1X16) Sqmm 16 Lt Abc (3X50+1X35+1X16) Sqmm 17 Lt Abc (3X95+1X70+1X16) Sqmm 18 Lt Abc (3X120+1X95+1X16)Sqmm 19 11Kv Xlpe Cable (3X70) Sqmm 20 11Kv Xlpe Cable (3X120) Sqmm 21 11 Kv Pilfer Resistant Material Cubical 22 11 Kv Ct 15/5 Amp 23 Dp Box 1 Phase / 3 Phase 24 Carriging Of 11 Kv Cable Jointing Kit Od And Id 25 Fabrication, Erection Of Sub-Station Type Double Pole On 8.5 Mtr Long Pcc Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 26 Fabrication, Erection Of Sub-Station Type Double Pole On 9 Mtr Long Pcc Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 27 Fabrication, Erection Of Sub-Station Type Double Pole On 11 Mtr Long Pcc Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 28 Fabrication, Erection Of Sub-Station Type Double Pole On 11 Mtr Long St Pole Along With Fixing Of Necessary Hardware Of Double Pole Along With Necessary Pin Insulator As Per Resspo Specification Complete In All Respect. 29 Dragging Of Pcc Pole 8.5 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 30 Dragging Of Pcc Pole 9.0 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 31 Dragging Of St Pole 11 Mtr To Pit Site Digging Of Pit Erection Including Providing All Decentralised Material Required For Completion Of Work . Work Is To Be Carried Out As Per Resspo Specification Complete In All Respect. 32 Grouting Of Pcc/St Pole With Cement, Bricks Ballat And River Sand Ratio 1:4:8 33 Fabrication And Erection T-Off Pole Single Section Pole Alongwith T Off Channel Clamp Disc Fittign And Pin Accessories 34 Providing Nut Bolts Washers Of Different Sizes 35 Ordinary Earthing By Ms Earth Rod 2500Mm Long As Per Resspo Schedule. Only Gi Wire & Earth Rod Shall Be Supplied By The Department 36 Grouting And Nuzzling Of Stay Set Complete Including Its Grouting By Civil Material (Cement, Brick Ballast And River Sand ) Only Stay Set Shall Be Supplied By The Department. 37 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Weasel Conductor As Per Resspo Specification And Direction Of E/I 38 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Rabbit Conductor As Per Resspo Specification And Direction Of E/I 39 Laying And Sagging Of 03 Phase 03 Wire 11Kv Line On Acsr Dog Conductor As Per Resspo Specification And Direction Of E/I 40 Providing And Fixing Of Guarding Angle On Existing 11Kv Support With Clamp And Nut Bolts 41 Laying & Commisioning Of 11 Kv Xlpe Cable (3X70) Sqmm 42 Laying & Commisioning Of 11 Kv Xlpe Cable (3X120) Sqmm 43 Laying Of Cable 11Kv Xlpe Cable (3X70) Sqmm In Pakka Road By Boring Method Laying Cable As Per Resspo Specification & Direction Of E/I 44 Stringing Of Lt Abc (1X25+1X16) Sqmm 45 Stringing Of Lt Abc (3X50+1X35+1X16) Sqmm 46 Stringing Of Lt Abc (3X95+1X70+1X16) Sqmm 47 Stringing Of Lt Abc (3X120+1X95+1X16)Sqmm 48 Hoisting Of 11Kv Xlpe Cable Will Be Passed Through Ms Pipe Of Required Size Duly Clamped With Pole At The Bottom Middle And Top Of The Pole 49 Fixing Of 11 Kv Cable Jointing Kit O/D I/D 50 Construction Of Brick Masonry Plinth Suitable For Installation Of 11Kv Pilfer Metering Cubical Along With Plastering. 51 Dragging Of 11Kv Pilfer Metering Cubical Inside The Metering Room, Its Installation And Commisioning. 52 Cutting And Chopping Of Tree Branches For Clearence Of Ht/Lt Line After Clearance Line Throughout Pieces Of Tree Branches Of Site As And When Required For Completion Of Work. 53 Safe Installation & Energisation Of 16/25/63 Kva T/F On Double Pole By Providing And Fixing Of L Piece Lugs Making Ht/Lt Connection And Its Commisioning Only Transformer Shall Be Supplied By The Deparment. 54 Safe Installation & Energisation Of 250 Kva T/F On Plinth By Providing And Fixing Of L Piece Lugs Making Ht/Lt Connection And Its Commisioning Only Transformer Shall Be Supplied By The Deparment. 55 Fixing Of Well Type Earthing 01 No Nutral Body And 01 No Body Complete In All Respect As Per Resspo Specification. 56 Construction Of Plinth 2 Meter X 2 Meter X 1.5 Meter For 100/250 Kva. Transformer Plinth Wall Shall Be Brick/ Stone Masonry Of 230 Mm Thick, Outside Of The Wall To Be Plastered With 18 Mm Thick Cement Mortar (1:3), Inside Of The Plinth Shall Be Filled With Borrowedsand Duly Compacted R.C.C. Top Slab (1:2:4) Shall Be 75 Mm Thick (Construction Of Plinth Should Comply With Resspo Norms) 57 Poper Wire Mesh Fencing Of Transformer Along Side The Plinth The Height Of The Fence Should Be Feets Above From Ground,Providing Fabrication And Fixing Main Gate In Fromt Of The Plint With Provision For Locking System.Painting Of Entire Metal Works/Main Gate Wire Mesh With Super Enameled Paint In Two Coat Of Red 58 Providing And Fixing Of Dead End Clamp 59 Providing Of Fixing Of Eye Hook 60 Providing Of Fixing Of J- Hook 61 Providing Of Fixing Of Suspension Clamp 62 Providing Of Holding Clamp For Top Dropper T/F 63 Providing Of Holding Clamp For Pcc/Stp Poles 64 Providing Of F Clamp For Pcc /Stp Poles
BOQ
| Sl. No. | Item Description |
| 1 | SAFE LOADING CARRIAGE & UNLOADING OF FOLLOWING MATERIALS FROM CENTRE STORE, LAKHIMPUR TO DIFFERENT WORK SITES AND ITS STACKING DISTANCE APPROX (0-100) KMS |
| 2 | LINE MATERIAL |
| 3 | PCC POLE 8.5 MTR.LONG |
| 4 | PCC POLE 9.0 MTR.LONG |
| 5 | PCC POLE 11.0 MTR.LONG |
| 6 | STP POLE 11 MTR. LONG |
| 7 | T/F 10/16 KVA |
| 8 | T/F 25 KVA |
| 9 | T/F 63 KVA |
| 10 | T/F 100 KVA |
| 11 | T/F 250 KVA |
| 12 | ACSR WEASEL CONDUCTOR |
| 13 | ACSR RABBIT CONDUCTOR |
| 14 | ACSR DOG CONDUCTOR |
| 15 | LT ABC (1X25+1X16) SQMM |
| 16 | LT ABC (3X50+1X35+1X16) SQMM |
| 17 | LT ABC (3X95+1X70+1X16) SQMM |
| 18 | LT ABC (3X120+1X95+1X16)SQMM |
| 19 | 11KV XLPE CABLE (3X70) SQMM |
| 20 | 11KV XLPE CABLE (3X120) SQMM |
| 21 | 11 KV PILFER RESISTANT MATERIAL CUBICAL |
| 22 | 11 KV CT 15/5 AMP |
| 23 | DP BOX 1 PHASE / 3 PHASE |
| 24 | CARRIGING OF 11 KV CABLE JOINTING KIT OD AND ID |
| 25 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 8.5 MTR LONG PCC POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 26 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 9 MTR LONG PCC POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 27 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 11 MTR LONG PCC POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 28 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 11 MTR LONG ST POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 29 | DRAGGING OF PCC POLE 8.5 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 30 | DRAGGING OF PCC POLE 9.0 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 31 | DRAGGING OF ST POLE 11 MTR TO PIT SITE DIGGING OF PIT ERECTION INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 32 | GROUTING OF PCC/ST POLE WITH CEMENT, BRICKS BALLAT AND RIVER SAND RATIO 1:4:8 |
| 33 | FABRICATION AND ERECTION T-OFF POLE SINGLE SECTION POLE ALONGWITH T OFF CHANNEL CLAMP DISC FITTIGN AND PIN ACCESSORIES |
| 34 | PROVIDING NUT BOLTS WASHERS OF DIFFERENT SIZES |
| 35 | ORDINARY EARTHING BY MS EARTH ROD 2500MM LONG AS PER RESSPO SCHEDULE. ONLY GI WIRE & EARTH ROD SHALL BE SUPPLIED BY THE DEPARTMENT |
| 36 | GROUTING AND NUZZLING OF STAY SET COMPLETE INCLUDING ITS GROUTING BY CIVIL MATERIAL (CEMENT, BRICK BALLAST AND RIVER SAND ) ONLY STAY SET SHALL BE SUPPLIED BY THE DEPARTMENT. |
| 37 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR WEASEL CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 38 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR RABBIT CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 39 | LAYING AND SAGGING OF 03 PHASE 03 WIRE 11KV LINE ON ACSR DOG CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 40 | PROVIDING AND FIXING OF GUARDING ANGLE ON EXISTING 11KV SUPPORT WITH CLAMP AND NUT BOLTS |
| 41 | LAYING & COMMISIONING OF 11 KV XLPE CABLE (3X70) SQMM |
| 42 | LAYING & COMMISIONING OF 11 KV XLPE CABLE (3X120) SQMM |
| 43 | LAYING OF CABLE 11KV XLPE CABLE (3X70) SQMM IN PAKKA ROAD BY BORING METHOD LAYING CABLE AS PER RESSPO SPECIFICATION & DIRECTION OF E/I |
| 44 | STRINGING OF LT ABC (1X25+1X16) SQMM |
| 45 | STRINGING OF LT ABC (3X50+1X35+1X16) SQMM |
| 46 | STRINGING OF LT ABC (3X95+1X70+1X16) SQMM |
| 47 | STRINGING OF LT ABC (3X120+1X95+1X16)SQMM |
| 48 | HOISTING OF 11KV XLPE CABLE WILL BE PASSED THROUGH MS PIPE OF REQUIRED SIZE DULY CLAMPED WITH POLE AT THE BOTTOM MIDDLE AND TOP OF THE POLE |
| 49 | FIXING OF 11 KV CABLE JOINTING KIT O/D I/D |
| 50 | CONSTRUCTION OF BRICK MASONRY PLINTH SUITABLE FOR INSTALLATION OF 11KV PILFER METERING CUBICAL ALONG WITH PLASTERING. |
| 51 | DRAGGING OF 11KV PILFER METERING CUBICAL INSIDE THE METERING ROOM, ITS INSTALLATION AND COMMISIONING. |
| 52 | CUTTING AND CHOPPING OF TREE BRANCHES FOR CLEARENCE OF HT/LT LINE AFTER CLEARANCE LINE THROUGHOUT PIECES OF TREE BRANCHES OF SITE AS AND WHEN REQUIRED FOR COMPLETION OF WORK. |
| 53 | SAFE INSTALLATION & ENERGISATION OF 16/25/63 KVA T/F ON DOUBLE POLE BY PROVIDING AND FIXING OF L PIECE LUGS MAKING HT/LT CONNECTION AND ITS COMMISIONING ONLY TRANSFORMER SHALL BE SUPPLIED BY THE DEPARMENT. |
| 54 | SAFE INSTALLATION & ENERGISATION OF 250 KVA T/F ON PLINTH BY PROVIDING AND FIXING OF L PIECE LUGS MAKING HT/LT CONNECTION AND ITS COMMISIONING ONLY TRANSFORMER SHALL BE SUPPLIED BY THE DEPARMENT. |
| 55 | FIXING OF WELL TYPE EARTHING 01 NO NUTRAL BODY AND 01 NO BODY COMPLETE IN ALL RESPECT AS PER RESSPO SPECIFICATION. |
| 56 | CONSTRUCTION OF PLINTH 2 METER X 2 METER X 1.5 METER FOR 100/250 KVA. TRANSFORMER PLINTH WALL SHALL BE BRICK/ STONE MASONRY OF 230 MM THICK, OUTSIDE OF THE WALL TO BE PLASTERED WITH 18 MM THICK CEMENT MORTAR (1:3), INSIDE OF THE PLINTH SHALL BE FILLED WITH BORROWEDSAND DULY COMPACTED R.C.C. TOP SLAB (1:2:4) SHALL BE 75 MM THICK (CONSTRUCTION OF PLINTH SHOULD COMPLY WITH RESSPO NORMS) |
| 57 | POPER WIRE MESH FENCING OF TRANSFORMER ALONG SIDE THE PLINTH THE HEIGHT OF THE FENCE SHOULD BE FEETS ABOVE FROM GROUND,PROVIDING FABRICATION AND FIXING MAIN GATE IN FROMT OF THE PLINT WITH PROVISION FOR LOCKING SYSTEM.PAINTING OF ENTIRE METAL WORKS/MAIN GATE WIRE MESH WITH SUPER ENAMELED PAINT IN TWO COAT OF RED |
| 58 | PROVIDING AND FIXING OF DEAD END CLAMP |
| 59 | PROVIDING OF FIXING OF EYE HOOK |
| 60 | PROVIDING OF FIXING OF J- HOOK |
| 61 | PROVIDING OF FIXING OF SUSPENSION CLAMP |
| 62 | PROVIDING OF HOLDING CLAMP FOR TOP DROPPER T/F |
| 63 | PROVIDING OF HOLDING CLAMP FOR PCC/STP POLES |
| 64 | PROVIDING OF F CLAMP FOR PCC /STP POLES |
| 65 | PROVIDING OF LT INSULATOR FOR PCC /STP POLES |
| 66 | PROVIDING OF STAY INSULATOR FOR PCC /STP POLES |
| 67 | PROVIDING OF LT CLAMP FOR PCC /STP POLES |
| 68 | PROVIDING OF STAY CLAMP FOR PCC /STP POLES |
| 69 | DRILLING CUTTING AND MAKING OF HOLE. |
| 70 | उक्त कार्यो के अलावा यदि कोई कार्य पूर्ण करने ने किसी एनी वस्तु उपकरण या कार्य की आवश्यकता होगी टो इन्ही दरो के अन्दर सम्पादित करना होगा |
| 71 | INCLUDING GST Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender