Public Administrative Department Local Bodies Closing in 13 days TDR #57464202

Tender For Appointment Of Agency For Supply, Installation, Testing & Commissioning And Maintenance Of Medical Gas Pipeline System At Dialysis Centre, (Plot No. G-1, Sector- 7, New Panvel) Of Pmc

Issued by Local Bodies · Raigad, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Sep 2026
13 days left
EMD
1.50 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Raigad → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Appointment Of Agency For Supply, Installation, Testing & Commissioning And Maintenance Of Medical Gas Pipeline System At Dialysis Centre, (Plot No. G-1, Sector- 7, New Panvel) Of Pmc

BOQ

Name of Work:- Appointment of agency for Supply, Installation, Testing & Commissioning and Maintenance of Medical Gas Pipeline System at Dialysis centre, (Plot no. G-1, Sector- 7, New Panvel) of PMC
Sl. No. Item Description
1Supply, Installation, Testing & Commissioning and Maintenance of Medical Gas Pipeline System at Dialysis centre, (Plot no. G-1, Sector- 7, New Panvel) of PMC
2Supply, Installation, Testing and Commissioning of 2 X10 Cylinder Main Manifold for Oxygen with NRV pipe connection and with middle frame with chain compatible for Control Panel. Wall mounting type gas manifold fabricated with 5/8\\"x 15 swg. Copper pipe as per BS EN 1057 &brass blocks as per IS 319 equally spaced at 250 mm fitted on duly powder coated MS frame (95 x 45). Hydraulically tested at 300 bar with high pressure non return Valve, 1.25 metre long 5/16\\" x l6g copper tail pipe tested at 300 bar. With Standards IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006, CE. CDSCO.
3Supply, Installation, Testing and Commissioning of 2 X4 Cylinder Main Manifold for Oxygen with NRV pipe connection and with middle frame with chain compatible for Control Panel. Wall mounting type gas Manifold fabricated with 5/8\\"x 15 swg. Copper pipe as per BS EN 1057 &brass blocks as per IS 319 equally spaced at 250 mm fitted on duly powder coated MS frame (95 x 45). Hydraulically tested at 300 bar with high pressure non return Valve, 1.25 metre long 5/16\\" x l6g copper tail pipe tested at 300 bar. With Standards IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006, CE. CDSCO.
4Supply, Installation, Testing and Commissioning Microprocessor based 2 Source Fully Automatic Control Panel (LCD DISPLAY -TOUCH SCREEN) for Oxygen with 40 micron filters both sides (Left Bank & Right Bank),2100 LPM. It shall be dome loaded fully automatic control panel and shall have touch screen display. The manifold shall consist of two bank regulators (dome bias) used to reduce the cylinder pressure to the two lines regulators which in turn controls the final line pressure. The manifold has an intermediate and line relief valve that is internally connected to a common vent port, terminating into a l/2\\" FNPT pipe. The header bars shall be equipped with high-pressure shutoff valves outside the cabinet to allow for emergency isolation of the header bars. The header bar shall incorporate integral check valves for each station. The manifold is equipped with pressure transducers, which sends information to the main circuit board for operation of the fail-safe relay which transmits a remote signal to the master alarm or buzzer. The external shut-off valves connecting to the header bars must be ball valves capable of withstanding pressure of 3,000 psi. With Standards IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006,IS/ISO 10524-2:2018,IS/ISO 10524-4:2008 CE.CDSCO. Should also be installed with leak measurement device It should be specifically designed for measuring the flow of oxygen, catering to the requirements of hospital where precise oxygen flow control is critical, providing features for easy installation, versatile units election, and comprehensive diagnostic functions., It should incorporate at hermalmass flow sensor designed for measuring oxygen. It should utilizes a calorimetric measuring principle, eliminating the need for additional pressure and temperature measurements. It should supports digital interfaces such as Modbus RTU and RS485, facilitating seamless communication with other systems. Should also provide sanalog (4...20mA) and pulse outputs, ensuring compatibility with different data acquisition and control systems. Anda user- friendly display for unit selection and diagnostic functions. It should be designed to achieve a high level of accuracy, with specified measuring ranges 0-90 Nm/ hand accuracy levels of + 1.5% of measured value and + 0.3% of full - scale value. It should operate effectively in a temperature range of -3Oto80°C and can withstand operating pressure s ranging from-1 to 16 bar. It should be with display degreased or 02 service. The flowmeter should be designed for case of maintenance It should include diagnostic functions that can be read on the display or accessed remotely, facilitating proactive maintenance.
5Supply, Installation, Testing and Commissioning Terminal units for Gas of British Standard (METAL) gas outlets with stainless steel probe are CE marked as a Class IIb Medical Device 93/42/EEC with notified body British Standards Institute and stamped CE. With Standards IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006,IS/ISO 10524-2:2018,IS/ISO 10524-4:2008 CE.CDSCO.It should have one-piece chromed fascia plate shall frame the outlet. With the back rough-in mounted, the outlet shall adjust from 3/8\\" [10 mm] to 1\\" [25 mm] variation in wall thickness. It should have modular design and include a gas specific 16 ga. [1.6 mm] steel mounting plate designed to permit on-site ganging of multiple outlets, in any order, on 5\\" [127 mm] spacing. It should be cleaned and degreased for medical gas service, factory assembled and tested. It should be Indexed to eliminate interchangeability of gas services. It should have 360° Swivel Inlet Pipe for easy installation and should have universal rough-in assembly to accept quick disconnects or diss front adaptors or BS AdaptorsMedical Oxygen Gas
6Medical Air Gas
7Vacuum
8Supply, installation, Testing and Commissioning of BPC Flow Meter with Dehumidifier Bottle of Specifications: Flow Range: 0-15 LPM For Adult, Accuracy: ±10% of the scale value or 0.2 LPM, whichever is higher. Material: Brass (chrome plated), float (AISI 316 with mesh), filter (AISI 3 16 wire mesh). Inlet/Outlet Connection: 3/8\\" BSP RH. Calibration: 50 psig (3.45 bar) at 21°C. Operation Mode: Manual (with a knob to adjust flow). Supply, It shall fully comply and meets with active medical device of class ILA and in compliance with the EN ISO15002:2008 standard. It should be duly CE marked and comply with 93/42/EEC Medical Devices: General. It shall be CE marked with the notified body number specified. It shall be provided with a copy of the certificate of origin. Its Pressure compensated to prevent back pressure build upon flow indicator. Expanded scale providing higher reading accuracy. Durable polycarbonate flow tube with cover. Flowmeter should be placed in the vertical position. lt should be lightweight of 200 g. The flowmeters should be of 0-15 LPM range for oxygen and with inlet pressure 50-60psi. (4.5 bar). The closing of the knob should be without any leakage. Polysulphone 250 cc Humidifier bottle should be unbreakable, reusable to disinfectants and complements. With Standards IS/ISO 15002:2008,IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006, CE.CDSCO.
9Supply, Installation, Testing and Commissioning of Ward vacuum unit Adult (1000 ml) with vacuum regulator a clear, autoclavable polycarbonate jar with varying capacities a vacuum range of 0 to 760 mmHg, a regulator with an adjustable knob for precise control, and a gauge to measure negative pressure, often with a range of 0 1o -760 mmHg. The jar is designed to be shatterproof and autoclavable, while the regulator typically has an aluminium body, brass inner parts, and a neoprene diaphragm. Conform to relevant standards IS/ISO 10079-3 :2014 for devices .IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006, CE. CDSCO.
10Supply, Installation, Testing and Commissioning of Medical Grade Copper Pipes BSEN 13348:2016, CE Cerified. Kite Marked. Copper Pipes used should be solid drawn, seamless, Deoxidized phosphorus, non-arsenical, half hard, tempered and degreased. Manufactured as per BSEN 13348:2016 in cither R250 half hard or R290 hard meeting the requirements as per the Medical grade Copper pipe standards. Degreasing of pipe shall be such that there is less than20mg/m2(0.20mg/dm2 of hydrocarbons on the degreased surface when tested by method specified by BSEN13348: 2016. 1t should also have LLOYD third-party inspection of copper pipes. The supplier should provide Manufacturer's Test Certificate of copper Pipes for physical Properties and chemical composition. Copper pipes joined by silver brazing method for copper to brass. Inert gas welding technique should be used by passing Nitrogen gas inside the copper pipes during brazing, in order to avoid carbon deposition inside the copper pipes. All copper pipes and fittings like bends, Tees, reducers and straight couplings should be as per ENI254-1 Copper pipes to be fixed with walls with suitable saddles and supports after erection, All the pipes should be cleaned or purged with the help of dry nitrogen gas & Should be tested with dry Nitrogen12 mm Thickness 1 mm
1115 mm Tickness 0.9 mm
1222 mm Thickness 0.9 mm
1328 mm Thickness 0.9 mm
1442 mm Thickness 1.2 mm
15Supply, Installation, Testing, Commissioning of Isolation Valve of Ball Valve, its shall have a body of Brass metal Ball/Stem shall be of Stainless steel or other materials depending on the application. Ball Valve Seats/Seals are made of PTFE, EPDM, Viton, or other materials depending on the fluid and temperature. With Standards IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006,IS/ISO 10524-2:2018,IS/ISO 10524-4:2008 CE.CDSCO.12 mm Isolation ball valve
1615 mm Isolation ball valve
1722 mm Isolation ball valve
1828 mm Isolation ball valve
1942 mm Isolation ball valve
20Supply, Installation, Testing and Commissioning of AIR COMPRESSORS 100% OIL FREE\\" Oil Less reciprocating piston compressor, TEFC motor standard with Dynamically balanced flywheel for low vibration, must have 5 microns oversized filter for large dirt holding capacity with Electric sensor tank drain A rated Control Panel. Also provided with Two-way cooling from fan and flywheel to eliminate excess heat. Composite Piston Technology with insulated wrist pin to reduce bearing heat800 LPM
21Supplying, Installing, Testing and commissioning of Indigenous Electrical Control Panel for Duplex Vacuum & Duplex Compressed Air Plant.
221000 Air Receiver Tank
23Supply, Installation, Testing, Commissioning of Heatless Decicant Air Dryer Designed For - 1SO:7183-1986 (E) Dryer Quality Class -ISO:8573-1:2010 (E) class 2, Pre-Filter Quality Class - ISO:8573-1:20 10 (E) class 1, Consistent Dew Point performance, Noise Level <70 dBA I Pressure Drop <03 kg/em2 (g), it is of Aluminium Construction Free From Corrosion & Scale Formation at Inner and Outer sides. Uses High Crush Strength Adsorbent Materials. lt shall also consist of pre and post microbial filter of suitable grade and class60 CFM
24Supply, lnstallation, Testing and Commissioning of Coarase filter for Medical Air for Oil Removal (Coalescing) and Particulate, Its Flow from 20 to 1810 m3/hour. Particle Removal 0.01 (um)
25Supply, lnstallation, Testing and Commissioning of Activated Carbon filter for Medical Air for Odour removal, and Particle removal, Its Flow from 20 to 1810 m3/hour Particle Removal 0.01 (um)
26Supply, Installation, Testing and Commissioning of Bacteria filter for Medical Air of Borosilicate filter element 99,995% efficiency and must Compliant with HEALTH TECHNICAL MEMORANDUM 2022, To meet Air flow rates from 850 -7504 litres/min (30-265 scfm)
27supply, installation, Testing and Commissioning Vacuum Pump with motor, starter, Silencer with fitting and Bracket Cast Iron Construction - Cylinders and frame are designed with 100% cast iron for durability and long life. *Cylinders - Separately cast cylinders with deep fins allow for 360 cooling. removing the heat of compression. Individual bolting of the cylinders to the frame for easy inspection and maintenance Low Oil Level Protection -The low oil level switch protects the pump from operating without proper lubrication. \\" Piston Rings - Each piston is equipped with (2) compression rings and (2) oil control rings to maintain maximum operating efficiency and low oil carryover. \\" Valves - Stainless steel valves are readily accessible and inexpensively replaced if necessary. \\"Connecting Rods -One piece design permits precision aligned machining of both crankpin and piston pin bearings resulting in longer bearing life. Also allows for simple maintenance-no bolts to come loose or adjust.600 LPM
28Supply, Installation, Testing and Commissioning of Vacuum tanks: Tanks are designed for the safe and efficient storage of compressed medical air. The air tanks meet stringent medical standards, making them reliable components in hospitals, clinics, and other healthcare environments. It shall be painted to avoid corrosion, It shall be Made of high-quality carbon steel to ensure durability, corrosion resistance, and long service life. It should Includes safety valves, pressure gauges, and drain valves to monitor and maintain safe operating conditions. Vertical or horizontal options to accommodate available space and facility layouts. Maximum Working Pressure is 8 bar to 13 bar (custom options available) as pe Standard: GBIS0.1~150,4-2011, HG/T20584-2011,TSG21-2016. Its Working temperature s100°C1000 Ltr for vacuum system (Water Volume)
29Supply, Installation, Testing and Commissioning of Zonal Valve Box with Pressure Gauge. The valve box shall be constructed of 18-gauge steel, complete with a baked white enamel finish. Affixed to the opposite sides of the box will be two adjustable steel brackets for the purpose of mounting the box to the structural support. The steel brackets shall accommodate various finished wall thicknesses between 3/8\\"and 1- 3/16\\"and shall be field adjustable. The frame assembly shall be constructed of anodized aluminium and shall be mounted to the back box assembly by standard 6x3/8\\" tapping screws as provided with the exception of the security valve box, the removable front shall consist of an opaque window with a pull-out ring pre-mounted to the center of the window with the exception of the security valve box, access to the zone shut-off valves shall be by merely pulling the ring assembly to remove the window from the frame. The window can be reinstalled without the use of tools only after the valve handles have been returned to the open position with the exception of the security valve box and the alarm/ valve combination units, the window shall be marked to prohibit unauthorized persons from tampering with the valves with the following silk-screen caution: “MEDICAL GAS CONTROLVALVES.CLOSE ONLY IN EMERGENCY “and with the exception of the security valve box and thealarm/valve combination units, each valve shall be supplied with an identification bracket which shall be bolted directly on to the valve box for the purpose of applying an approved medical gas identification label The front panel shall be labelled to instruct persons to close the valves only in an emergency. The valve boxes hall be constructed so that the front panel cannot be attached to the box while any valve inside is in the closed position. lt should have openings to the box' sinterior shall be dust-tight. It should have each pipe inside the boxes hall come with it shown pressure gauge that can be viewed through the clear window. All ases and their respective gauges shall be clearly labelled with the proper color coordination.IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006,IS/ISO 10524-2:2018,IS/ISO 10524-4:2008 CE.CDSCO.3 Gas (Oxygen, Vacuum, Medical Air)
30Supply, Installation, Testing and Commissioning Of Digital Medical Gas Area Alarm, It should fully complies and meets NFPA-99 standards only. The alarm shall be microprocessor based witha 10\\"screcn and capable of monitoring up to 8 sensors. Sensors shall be mounted locally (in the rough-inbox) by installing the copper pipe provided or mounted remotely. Sensors shall be automated for gas specific detection. Arca alarm shall be fabricated from18gauge steel with a 3/8\\"O.D. type \\"K” copper pipe for connection to the service line. The default set-points shall be +- 20% variation from normal condition, In the calibration mode High / Lowest -points shall be adjustable by on board push buttons. To view the set points and audible alarm sound level, press and hold the mute button for twenty (20) seconds. The digital sensors can be mounted locally or remotely utilizing shielded twisted pair wiring up to 500 ft. The sensors shall be designed to create interference barrier for increased RFI/EMI protection. The LCD brightness and volume shall be field adjustable. The LCD display shall be readable in poor lighting conditions. Screen text shall be customizable for gas locations. The sensors shall be gas specific with a DISS nut and a nipple. The LCD sensors' operating range shall be the following: Mid-pressure:0-99 psi; Oxygen and Vacuum. The alarm shall conform to UL Standard 1069. The alarm shall comply with the electro magnetic compatibility standards FCC Part1S Class A and 1CES 003 Class A. IS/ISO 7396-1:2016 + A1:2017 htm 02-01 Part A:2006, IS/ISO 10524-2:2018, IS/ISO 10524-4:2008 CE. CDSCO.3 Gas (Oxygen, Vacuum, Medical Air)
31Supply, Installation, Testing and Commissioning Of HORIZONTAL/ VERTICAL BED HEAD PANEL Double Duct, It shall be duly CE marked and comply with 93/42/EEC Medical Devices: General & shall have CE No or NFPA-99 standards or CGA standards. Or HTM02-01 or ENISO7396 1&2. It should be with 2 channels to provide a modular surface mounted unit with integrated accessory rails for equipment management. It should have 2 separate partition rows wise for medical gases and electrical Switch & sockets. Length should be 1800mm All medical gas piping shall be hard-piped and brazed to a single point of connection. Fascia panels, top, middle and bottom cover panels shall be removable for access for easy installation and maintenance. It should be pre-piped with provision for 2 to 6 gas outlets as required. (Bed head panels does not include gas out let cost) It should have 4 electrical sockets., RJ-45=1, RJ-=1, It should have one stainless steel vertical pole with IV stand and 4 Hooks on which dedicated accessories can be mount. Out Of two partitions one partitions should have medical gas piping shall be hard- piped and brazed to a single point of connection. Fascia panels, top, bottom cover panels shall be removable for access for easy installation and maintenance. Design to meets the need of the 1CU wards. Designed to makel recovery more pleasant, should be made of an innovative polycarbonates hee ton to which it is applied a colorful film, featuring pictures recommended by user, Supply, Installation, Testing and Commissioning of IV Pole Cum Syringe Stand, Supply, Installation, Testing and Commissioning of SS Wire Basket
32HP Medical Gas anti-static Hose Assembly Oxygen, Vacuum, Medical Air4, Medical Air 7, Nitrous Oxide, Carbon Dioxide)
33Construction of Manifold and Plant Room And Electrical Work in Plant and Manifold Room Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57464202
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 28-09-2026
Authority
Authority Name Panvel Municipal Corporation
Work Description Tender for Appointment Of Agency For Supply, Installation, Testing & Commissioning And Maintenance Of Medical Gas Pipeline System At Dialysis Centre, (Plot No. G-1, Sector- 7, New Panvel) Of Pmc
Basic Detail
Tender No PMC/MHD/03/2026-27
Bidding Type Tender
Location
City Raigad
State Maharashtra
Key Dates
Publish Date 11 Sep 2026
Submission Date 28 Sep 2026
Open Date 29 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 1.50 Lakhs
Exemption Not Available
Document List
7aaa2c14-7a5c-439f-84ac-3d80510eef4a.html
BOQ_2287955.xls
New_Panvel_Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Sep 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
html

7aaa2c14-7a5c-439f-84ac-3d80510eef4a.html

xls

BOQ_2287955.xls

pdf

New_Panvel_Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders