Tender For Repair And Renovation Of Arulmigu Kalainatha Swamy Thirukoil, Pallimadam Village, Thiruchuli Taluk, Viruthunagar District
Tender Overview
Project Description
Tender for Repair And Renovation Of Arulmigu Kalainatha Swamy Thirukoil, Pallimadam Village, Thiruchuli Taluk, Viruthunagar District
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Sep-2026 | DATE | Date | 06-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | water washing to Cleaning cut stones using mild hydrofloric acid and powder and water pressure of stone structure to removel of oil and etc.The rate is inclusive of cost of all materials, taxes , brushes, scaffolding charges and labour chrges for removel of oil etc.,complete complying with standard specification. |
| 2 | Dismantling the damaged weathering course of lime brick concrete and removing out side of the temple |
| 3 | Dismantling the Existing Masonary Brick in cement mortar walls under 3m high and removing out side of the temple |
| 4 | Dismantling of Existing cut stone member (Chitranvanam, Padma Jagati, Adhistanam, Kandam, Pattiyal,Jagati, Kumudagam, Aswapadam, Sthamaba, Sthambam,Kalasam, Thadi, Kudam, Palagai, Veerakandam, Bodhiyal,Uthiram, Kambu, Eludham, Kabothagam, Viyalam, Koodu,Ull Vari, Pavukkal, Thun, Flooring, Nilaikal, Bodhiyal Thani,Uthiram. pauvkal,Walls etc,) from the 3.50m height using with palm tree and grane including labour charges for numbering the old stone without damagesetc complete |
| 5 | Dismantling of Existing cut stone member ( Thanithun, Bodhiyal Uthiram. ) from the 3.50m height using with palm tree and grane including labour charges for numbering the old stone without damagesetc complete in standard specification. |
| 6 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. |
| 7 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. |
| 8 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 9 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means |
| 10 | R.R Masonary in cement mortar1:5(one cement,and five crushed stone sand) for foundation and basement including simultaneously pointing above ground level with the same mortar etc.,complete |
| 11 | Refixing the Existing cut stone member Cthiravanam,Athisdanam Sthampam Uthiravari Kodungai Viyalavari,Inner Walls pauvkal etc, from the 3.50m height using with palm tree and grane including labour charges for numbering the old stone without damagesetc complete |
| 12 | Supply of cut stone for Uthiravari cut stone member ,uthiram, Bothiyal,Piller wall stones cost at Quary for cut stone blocks of length upto 5 feet (1’x1’x5’) and (1^1/2’x 1^1/2’x10’) complete complying with standard specification. |
| 13 | cut stone blocks of length upto 5 feet (1’x1’x5’) |
| 14 | Uthiravari, pauvkal ,etc cut stone blocks of length above 5 feetand upto 10 feet (1^1/2’x 1^1/2’x10’) |
| 15 | Labour charges for three Line Dressing for Cthiravanam,Athisdanam Sthampam Uthiravari Kodungai Viyalavari,Inner Walls pauvkal etc, |
| 16 | Compound wall dressing |
| 17 | Chithiravanam |
| 18 | ubabeedam-kandam |
| 19 | Adhirstanam -kanda pattiyal |
| 20 | Sthambam-Kalvari,kalasam,thaddi vari |
| 21 | Uthiram-prastharam kambu Eluthagam |
| 22 | Kapothagam |
| 23 | Viyalavari |
| 24 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9\\" x 4 3/8\\" x 2 3/4\\" with class designation of 12.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. |
| 25 | Stone members and pillars,walls,Cellings Etc joints are pointing with high rich cement mortar 1:3 mix 20mm depth flush pointing works including cost of all materials, labour charges, scaffolding and curing etc. completed as per specification |
| 26 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 27 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 28 | Finishing the top of roof with one course of machine pressed tiles of following size of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 29 | Laying cut stone flooring using new stones 0.60 x 0.60 & Fixing the Cut stone for 3 line dressed on all face set in Cement Mortar 1:3 including handling charges cost of tools and fixing in position etc., complete with standard specifications. |
| 30 | Clean removal of cement plaster from Vimanam complete with standard specifications. |
| 31 | Brick masonry Cement Mortar 1:4 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram |
| 32 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortar1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram |
| 33 | White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers. |
| 34 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 35 | Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area. |
| 36 | Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. |
| 37 | Up to 50' ht. |
| 38 | Up to 15' ht. |
| 39 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:1.50 finishing the same with LM 1:1.50 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed here under) Sudhai size above 2' 6\\" up to 3' 6\\" |
| 40 | Supply of Country Wood for making the following itemsusing Vengai Wood-Temple Pattern Ornamental Doors with high quality Country Wood with 2” minimum to 7” maximum thick Ornamental Frames, 2” thick to 5” thick Kamala (Flower Planks), Creeper, Birds, Animal Figures, Sculptures, etc. Backside1” thick to 3” plank including necessary carving, shaping, wastage, etc., as per approved plan and design. |
| 41 | Painting new wood work with Three finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 42 | GST 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender