Tender For Dismanlting , Shifting , Re-Installation, Testing & Commissioning Including Refurbishment Of Pbbs At Agra Airport And Its Operation And Aicmc.
Tender Overview
Project Description
Tender for Dismanlting , Shifting , Re-Installation, Testing & Commissioning Including Refurbishment Of Pbbs At Agra Airport And Its Operation And Aicmc.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Oct-2026 | Corrigendum-I | Date | 08-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SH-I: Dismantling, Shifting, Re-installation with refurbishment |
| 2 | Dismantling of 03 Nos existing PT Bukaka make Passenger Boarding Bridges complete unit including UPS, batteries , rotunda , AC units , panel ( Type: B3-18/36- Qty-02 Nos, B3-19/37-Qty-01 Nos) at Vizag Airport etc complete as required. |
| 3 | Shifting / Transportation of 03 Nos dismantled PT Bukaka make Passenger Boarding Bridge complete unit including UPS, batteries , rotunda , AC units , panel ( Type: B3-18/36- Qty-02 Nos, B3-19/37-Qty-01 Nos) from Vizag Airport to Agra Airport including packing, insurance of complete material etc complete as required. |
| 4 | Reinstallation, testing and commissioning of complete unit of PBB at Agra Airport along with rotunda foundation work and SITC of anchor bolts etc complete as required. |
| 5 | Refurbishment work required in PBB unit including replacement of 4 Ton capacity rotunda AC unit, floor mats with beading, canopy without frame, all lights, bay signages, step ladder door hinges, auto leveller, sensors, door closer and minor roofing works required to avoid leakage during rain, gaskets, rain guards, re-wiring of distribution & operator panel as required, software updation, painting of all parts of PBB, oiling & greasing etc complete as required |
| 6 | Replacement of existing 20KVA online UPS and 12V, 42AH batteries 32 Nos Complete etc as required |
| 7 | Annual Operation and routine maintenance of complete PBB systems as mentioned under SH:I in 01 shift of 08 hrs by providing requisite man-power, tools, equipments, consumables and technical support etc. during operations as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. |
| 8 | Year 1 (During DLP) |
| 9 | Year 2 (1st Year after DLP) |
| 10 | Year 3 (2nd Year after DLP) |
| 11 | Year 4 (3rd Year after DLP) |
| 12 | Year 5 (4th Year after DLP) |
| 13 | Year 6 (5th Year after DLP) |
| 14 | All inclusive Comprehensive Maintenance after DLP of all Passenger Boarding Bridges (PBBs) as mentioned under SH-I with its all associated electrical and mechanical accessories, including cost of all required spares (imported/Indian), labour & arranging of tools & plants, technical supports, preventive and corrective maintenance etc. as specified in the SCC, technical specification and particular specifications of operation & AICMC with complete in all respect. |
| 15 | CAMC for 1st year after DLP |
| 16 | CAMC for 2nd year after DLP |
| 17 | CAMC for 3rd year after DLP |
| 18 | CAMC for 4th year after DLP |
| 19 | CAMC for 5th year after DLP Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender