Science and Technology Boards / Undertakings / PSU Closing in 7 days TDR #57458106

Tender For General-Pashchima Kadamanthodu Lss Phase I-Pashchima Kadamanthodu Lss Phase I-General Civil Work

Issued by Boards / Undertakings / PSU · Kottayam, Kerala
Tender Value
12.66 Lakhs
Estimated cost
Bid Submission
21 Sep 2026
7 days left
EMD
31667
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kottayam → Kerala
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for General-Pashchima Kadamanthodu Lss Phase I-Pashchima Kadamanthodu Lss Phase I-General Civil Work

BOQ

Name of Work:- GENERAL-PASHCHIMA KADAMANTHODU LSS PHASE I-PASHCHIMA KADAMANTHODU LSS PHASE I-General Civil Work
Sl. No. Item Description
1Retaining Wall 1.10 m Ht. - 32.00 Rm
22.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
3OD2072/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site
45.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
55.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
65.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
7Retaining Wall 1.30 m Ht. - 100.50 Rm
82.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
9OD2/2026-2027:Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site
105.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
115.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
125.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
13Retaining Wall 1.60 m Ht. - 4.50 Rm
142.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
15OD34/2026-2027:Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site
165.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
175.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
185.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
19Retaining Wall above Bedrock 1.30 m Ht. - 30.00 Rm
202.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
21OD30/2026-2027:Rock anchoring with dowel bars- Supplying and providing MS dowel bars of size 12 mm dia of1m long (50 cm in rock and 50cm in concrete ) including drilling holes of 20mm dia to a depthof 50 cm in rock and filling the gap with cement grout( 0.050kg/each) etc complete
224.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
234.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
24OD31/2026-2027:Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site
255.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
265.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
275.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
28Retaining Wall above Bedrock 1.60 m Ht. - 3.00 Rm
292.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
30OD32/2026-2027:Rock anchoring with dowel bars- Supplying and providing MS dowel bars of size 12 mm dia of1m long (50 cm in rock and 50cm in concrete ) including drilling holes of 20mm dia to a depthof 50 cm in rock and filling the gap with cement grout( 0.050kg/each) etc complete
314.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
324.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
33OD33/2026-2027:Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site
345.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
355.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
365.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57458106
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 12.66 Lakhs
LAST DATE 21-09-2026
Authority
Authority Name Directorate Of Soil Survey And Soil Conservation
Work Description Tender for General-Pashchima Kadamanthodu Lss Phase I-Pashchima Kadamanthodu Lss Phase I-General Civil Work
Basic Detail
Tender No DSCO/KTM/138/2026-R3
Bidding Type Tender
Location
City Kottayam
State Kerala
Key Dates
Publish Date 11 Sep 2026
Submission Date 21 Sep 2026
Open Date 23 Sep 2026
Finance
Tender Value 12.66 Lakhs
Tender Fee 2760
EMD 31667
Exemption Available
Document List
af431866-0419-4a47-a277-dce59ec24e33.html
BidDocument.pdf
BOQ_1471894.xls
FormsAndConditions.pdf
PreliminaryAgreementAndCo_1.pdf
TechnicalSpecificationsAndDrawings.pdf
Tendernotice_1 (19).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 11, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Sep 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

af431866-0419-4a47-a277-dce59ec24e33.html

pdf

BidDocument.pdf

xls

BOQ_1471894.xls

pdf

FormsAndConditions.pdf

pdf

PreliminaryAgreementAndCo_1.pdf

pdf

TechnicalSpecificationsAndDrawings.pdf

pdf

Tendernotice_1 (19).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders