Bids Are invited for Repair And Overhauling Service - Short Refit Of Db Dravan O/L-26/A; Any Other Suitable Brand; Yes; Buyer Premises - Sow For Dumb Barge Dravan(Sr-26)Description Hull Note: Projected Scope Work Including Spares And Material Firms R
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Short Refit Of Db Dravan O/L-26/A; Any Other Suitable Brand; Yes; Buyer Premises - Sow For Dumb Barge Dravan(Sr-26)Description Hull Note: Projected Scope Work Including Spares And Material Firms Requested To Quote Considering The Same. Non Quoting Of The Material / Spares Column Will Be Considered As Inclusive Quote And No Growth Of Work Will Be Admitted. , 1.0001Vessel To Be Docked In Both Versions , 1.0002 A) Under Water And Boot Top Area Hp Jet Clean Entire Under Water Area And Boot Top Area (With A Pressure Not Exceeding 3000 Psi) Including Ship Side And Remove The Marine Growth/Barnacles And Present For Survey. , 1.0002 B) Shipside Above Water Hp Jet Clean Entire Shipside (With A Pressure Not Exceeding 3000 Psi) To Remove The Salts And Contaminants From The Surface And Present For Survey And Present For Survey , 1.0002 C) Weather Deck (Including Super Structure) Hp Jet Clean Entire Weather Deck (With A Pressure Not Exceeding 3000 Psi) Remove Salts And Contaminants From The Surface And Present For Survey , 1.0003 A) Cable Locker Manually Clean Cable Locker And Present For Survey. The Tanks Should Be Washed Out With Fresh Water And Soap Water To Remove Any Sediment Or Dirt Present In The Tank , 1.0003 B) Machinery Compartments And Llrw Tank Spaces Manually Clean Bilges And Bulkheads Of Engine Room Using Detergent Solution To Remove Oil, Grease And Other Contaminants And Present For Survey , 1.0003 C), Water Tight Tanksmanually Clean Wt Tanks For Contaminants And Present For Survey , 1.0003 D), Tanks (Fresh Water Tank, Fuel Tank, Sewage Tank And Llrw Tanks)Manually Clean Tanks(Fresh, Sewage And Fuel Tank) Using Detergent Solution To Remove Oil, Grease And Other Contaminants And Present For Survey , 1.0003 E) Accommodation Spacesmanually Clean Bulk Heads Of All Accommodation And Clean All The Floors , 1.0004 A) Undertake Visual Survey Of Under Water And Boot Top Area , 1.0004 B) Undertake Visual Survey Of Shipside Above Water , 1.0004 C) Undertake Visual Survey Of Weather Deck, Superstructure And All Fitments On Weather Decks , 1.0004 D) Undertake Visual Survey Of Cable Locker , 1.0004 E) Undertake Visual Survey Of Machinery Compartments And Llrw Tank Spaces , 1.0004 F) Undertake Visual Survey Of Water Tight Tanks , 1.0004 G) Undertake Visual Survey Of Tanks (Fresh Water Tank, Fuel Tank Sewage Tank And Llrw Tank) , 1.0004 H) Undertake Visual Survey Of Accommodation Space , 1.0004 J), Undertake Usg Survey (5 Points Per Sqm Suspected Area) On Under Water And Boot Top Area , 1.0004 K), Undertake Usg Survey (5 Points Per Sqm Suspected Area) On Shipside Above Water , 1.0004 L), Undertake Usg Survey (5 Points Per Sqm Suspected Area) On Weather Deck, Superstructure And All Fitments On Weather Decks , 1.0004 M), Undertake Usg Survey (5 Points Per Sqm Suspected Area) On Machinery Compartments And Llrw Tank Spaces And Other Internal Spaces , 1.0004 N), Undertake Usg Survey (5 Points Per Sqm Suspected Area) On Water Tight Tanks , 1.0005 A), Under Water Area And Boot Top (Jotun Scheme) Carry Out Surface Preparation To The Standards Of Sa 2.5 And Restore The Paint As Under As Per Joint Inspection Report With Paint Oem Rep , 1.0005 B), Under Water Area And Boot Top (Jotun Scheme) Carry Out Surface Preparation To The Standards Of Sa 1 And Restore The Paint As Under As Per Joint Inspection Report With Paint Oem Rep , 1.0005Carry Out Uw Painting C), 1St Coat: Primer - Epoxy Holding Primer -40-50 Microns , 1.0005Carry Out Uw Painting D), 2Nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 Microns , 1.0005 Carry Out Uw Painting E) 3Rd Coat: Anti Corrosive - Jotacote Universal (Grey) - 150 Microns , 1.0005 Carry Out Uw Painting F) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns , 1.0005 Carry Out Uw Painting G) 5Th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 Microns , 1.0005Carry Out Uw Painting H) 6Th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 Microns , 1.0005 Carry Out Uw Painting J) 7Th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 5150 Microns , 1.0005 Carry Out Uw Painting K) 8Th Coat: A/F: Seaquantum Ultra(Black) - 150 Microns , 1.0005 L)Draught Markscarryout Repairs, Chipping And Painting Of Draught Marking (Fwd And Aft). , 1.0006 A) Shipside Above Water (Jotun Scheme) Carry Out Surface Preparation To The Standards Of Sa 2.5 And Restore The Paint As Under As Per Joint Inspection Report With Paint Oem Rep , 1.0006 B) Shipside Above Water (Jotun Scheme) Carry Out Surface Preparation To The Standards Of Sa 1 And Restore The Paint As Under As Per Joint Inspection Report With Paint Oem Rep , 1.0006 Carry Out Painting On Ship Sidec) 1St Coat: Primer - Epoxy Holding Primer -30 Microns Dft , 1.0006 Carry Out Painting On Ship Sided) 2Nd Coat: Presmatic(Red) - 125 Microns Dft , 1.0006 Carry Out Painting On Ship Sidee) 3Rd Coat: Presmatic(Grey) - 125 Microns Dft , 1.0006 Carry Out Painting On Ship Sidef) 4Th Coat: Hard Top Black - 150 Microns Dft , 1.0007 A) Weather Deck And Associated Fittings (Jotun Scheme) Carryout Necessary Surface Preparation To The Standards Of St3 On Paint Damaged Locations As Recommended By Paint Oem During Joint Inspection And Restore Paint , 1.0007 B) Weather Deck Painting1st Coat: Penguard Primer-50 Μdft , 1.0007 C) Weather Deck Painting2 Nd Coat: Jotamastic 87(Al)-200 Μdft , 1.0007 D) Weather Deck Painting3rd Coat: Jotarmor(As)-800 Μ Dft , 1.0008 A) Super-Structure (Jotun Scheme) Carryout Necessary Surface Preparation To The Standards Of St3 On Paint Damaged Locations As Recommended By Paint Oem During Joint Inspection And Restore Paint , 1.0008 B) Super-Structure (Jotun Scheme) Carryout Necessary Surface Preparation By Minor Buffing As Recommended By Paint Oem During Joint Inspection And Restore Paint , 1.0008 C) Super Structure Painting 1St Coat: Penguard Primer-50 Μdft , 1.0008 D) Super Structure Painting 2 Nd Coat: Primastaic- Red- 125 Μdft , 1.0008 E) Super Structure Painting 3Rd Coat: Primastaic- Red- Grey- 125 Μdft , 1.0008 F) Super Structure Painting 4Th Coat: Hard Top As - 60 Μdft , 1.0009 A) Rudder - Examine Rudder Bushes And Glands. Ensure Bushes Are Fully Lubricated And Free Before Undocking. , 1.0009 B) Rudder - Manual Rudder Mechanism To Be Cleaned, Inspected And Overhauled. , 1.0009 C) Rudder - Examine Rudder And Hull Plating In The Vicinity Of Rudder Shaft And Brackets, Rudder Fittings Up To Rudder Head And Keel. Recoat Rudder And Shaft Brackets , 1.0010 A) Following Deck Fittings To Be Visually Surveyed And Necessary Repairs To Be Carried. (Fasteners Included In Cost Of Services)(A) Bollards (Double) (219 Mm Od,300 Mm High From Base, Base-900X100 Mm High,10 Mm Thick Circular Disc Of 250 Mm Dia, 02 No Semi-Circular Disc Of 10 Mm Dia 170 Mm High From Base ) , 1.0010 B) Following Deck Fittings To Be Visually Surveyed And Necessary Repairs To Be Carried. (Fasteners Included In Cost Of Services)(B) Bollards (Cruciform) (Approx. 125 Mm Dia, 400 Mm High) , 1.0010 C) Following Deck Fittings To Be Visually Surveyed And Necessary Repairs To Be Carried. (Fasteners Included In Cost Of Services)(C) Fairleads(Approx. 400X200 Mm Base, Each Fairlead Bolted On Deck With 04 Bolts And 01 Allen Bolt) , 1.0010 D) Following Deck Fittings To Be Visually Surveyed And Necessary Repairs To Be Carried. (Fasteners Included In Cost Of Services)(D) Berthing Rope Reel , 1.0010 E) Following Deck Fittings To Be Visually Surveyed And Necessary Repairs To Be Carried. (Fasteners Included In Cost Of Services)(E) Bull Ring (40X40x6 Mm Thick Bracket, 100X14x2500 Flat Bar, 915X480x10 Mm Thick Doubler Plate, 680 Mm High From Deck) , 1.0011 A) Stanchion Shoes Along With Stanchion Pipes On Upper Deck And Accessories To Be Visually Inspected And Necessary Repairs To Be Carried. Stanchions To Be Fitted Back Post Inspection With New (Ss) Fasteners , 1.0011 B) Defective Stanchions/Stanchions Accessories To Be Repaired. , 1.0011 C) Renew The Following Accessories Of Stanchions :-(A) Steel Wire Rope With Pvc Covered Steel Wire Rope, Dia 10 Mm , 1.0011 C) Repair The Following Accessories Of Stanchions :-(B) Bottle Screws Material-Ss , 1.0011 C) Renew The Following Accessories Of Stanchions :-(C) D Shackles-Ss , 1.0011 C) Renew The Following Accessories Of Stanchions :-(D) Timbales-Ss , 1.0012 A) Carry Out Hydro Blasting Of The Anchor, Chain And Associated Accessories And Land At Nd(V) Fab Dept And Offer For Survey As Per Norms. (A) Anchor , 1.0012 B) Carry Out Hydro Blasting Of The Anchor, Chain And Associated Accessories And Offer For Survey At Nd(V) Fab Dept And Fitback The Same Post Survey As Required By User(B) Anchor Chain , 1.0012 C) Carry Out Hydro Blasting Of The Anchor, Chain And Associated Accessories And Offer For Survey At Nd(V) Fab Dept. (C) Anchor Shackles , 1.0012 D) Carry Out Hydro Blasting Of The Anchor, Chain And Associated Accessories And Offer For Survey At Nd(V) Fab Dept. (D) Screw Stoppers , 1.0012 E) Carry Out Hydro Blasting Of The Anchor, Chain And Associated Accessories And Offer For Survey At Nd(V) Fab Dept. (E) Eye Plates , 1.0012 F) Clean Out Cable Lockers And Remove Portable Perforated Plates. Clean Out Sump And See That Suction Strainer And Box Is Clear. Examine Structure Paying Particular Attention To That In Vicinity Of Cable Clench, Ships Side Behind Projection Plates And Bars, Junction Between Plating And Horizontal Stiffeners And Sumps. Thoroughly Grease Fastenings With Xg-274 Grease. Ensure That The Inboard End Of The Cable Is Properly Secured To The Cable Clench. , 1.0012 G) Layout All Anchor Chain Cables And Associated Fittings. Survey Cables And Shackles. Break, Clean And Grease All Joining Shackles. Strip And Grease Slip In Cable Locker. Re-Arrange Cable Length To Ensure Quality Of Wear. Chain Cable To Be Coated With Bituminous Paint , 1.0013 Carry Out Complete Overhaul And Trials To Ensure Satisfactory Performance On Completion Of Overhaul Of Windlass , 1.0014 A) Quote For Steel Renewal At Various Locations As Per Survey Report. Note:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A Quality Ship Building Steel For Shell And Is 2062 Grade `B Quality Steel For Non-Structural Works, Degutting/Regutting/ Renewal Of All Obstructions In Way Of Steel Renewals Including Lagging/Panelling, Minor Fittings/ Equipment With Their Foundations, Ventilation Systems, Staging Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. , 1.0014 B) Build-Ups - Carry Out Build Ups As Indicated By The Hull Survey Team/ Surveyor(I) 25 X 25 Mm , 1.0014 C) Buildups - Carry Out Build Ups As Indicated By The Hull Survey Team/ Surveyor(Ii) 50 X 50 Mm , 1.0014D) Welding Runs To Be Carried Out On Deteriorated Weld Seams As Per Hull Survey Report , 1.0014E) Carry Out Fairing Of The Areas Indicated By Survey Report , 1.0015 A) Clean, Inspect And Renew All Sacrificial Anode As Per No 16/2000.Size:- 300X95x33 Mm – 10 Nothe Sacrificial Anode Will Be Provided By Navy / Sss(V) , 1.0015 B) Clean, Inspect And Renew All Sacrificial Anode As Per No 16/2000. 750X140x40 Mm – 13 Nothe Sacrificial Anode Will Be Provided By Navy / Sss(V) , 1.0016 A) Carryout Overhauling Of Following Sea Inlet And Outlet Valves (A) Sea Chest Vv, - 200Nb, Ci With Gm Insert - Nos. 2 , 1.0016 B) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(B) Dg.S/W Cooling, 50 Nb Nos. 1 , 1.0016 C) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(C) Scupper Discharge, 65 Nb- Nos. 2 , 1.0016 D) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(D) Sewage Discharge, 100 Nb -Nos. 1 , 1.0016 E) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(E) Sea Water Cooling, 80 Nb -Nos. 1 , 1.0016 F) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(F) Fuel Loading, 80Nb -Nos. 1 , 1.0016 G) Carryout Overhauling Of Following Sea Inlet And Outlet Valves(G) Hull Valve, 80 Nb -Nos. 1 , 1.0017 A) Ventilation System(A) Carry Out Internal Cleaning Of 100 % Ventilation Trunking And Tank Compartment Exhaust Trunking As Per Br 2203 And Check Watertight Sluice Valves For Air Tightness As Per Br 2170 (100 Nb And 250X250 Nb) , 1.0017 B) Ventilation System(B) Carry Out Necessary Repairs To Ventilation Trunking As Necessary , 1.0017 C) Ventilation System (C) (I) Replace Hepa Filter Fitted As Per Aerb Norms To Determine Efficiency Of The Filter. , 1.0017 C) Ventilation System (C) (Ii) Calibration Of Pressure Gauges Before And After Hepa Filter. , 1.0017 D) Ventilation System (D) Mushroom Type Ventilators On Weather Deck To Be Removed, Cleaned/ Overhauled And Fitted Beck Post Necessary Repairs. , 1.0018 A) Renew All The Following Sanitary Fittings (A) Wc (Western)-3 No (Ceramic Mat) , 1.0018 B) Renew All The Following Sanitary Fittings (B) Wash Basins (Ss)- 9 No , 1.0018 C) Renew All The Following Sanitary Fittings (C) Towel Rail (Ss)-08 No , 1.0018 D) Renew All The Following Sanitary Fittings (D) Mirror Cabinet -05 No , 1.0018 E) Renew All The Following Sanitary Fittings (E) Showers (Ss)- 05 No , 1.0018 F) Renew All The Following Sanitary Fittings (F) Flush Tank – 03 No , 1.0018 G) Renew All The Following Sanitary Fittings (G) Water Tapes (Ss)-15 No , 1.0018 H) Renew All The Following Sanitary Fittings (H) Faucet(Ss)-03 No , 1.0019 A) Wt Tanks - Restore / Renew Paint Scheme:- (M/S Akzonobel Paints Pvt. Ltd.) Post Mechanical Surface Preparation St3 And Buffing As Recommended By Paint Oem Repdetails Of Tanks:-Fr. Stn 52-45 (P)Fr. Stn 52-45 (S)Fr. Stn 45-35 (P)Fr. Stn 45-35 (S)Fr. Stn 35-25 (P)Fr. Stn 35-25 (S)Fr. Stn 25- 13(P)Fr. Stn 25- 13(S)Fore Peak Tankaspcable Locker , 1.0019 B) Wt Tanks - Application Of Paint - 1St Coat: Primer (Interguard 269) – 50 Μ Dft. , 1.0019 C) Wt Tanks - Application Of Paint - 2Nd Coat: Intershield (Al) - 150 Micron Dft , 1.0019 D) Wt Tanks - Restore / Renew Paint Scheme:- (M/S Akzonobel Paints Pvt. Ltd.) Post Requisite Surface Preparation / Buffing As Recommended By Paint Oem Rep3rd Coat: Intershield ( Bronze) - 150 Micron Dft , 1.0020 A) Fuel Tank -Clean The Tanks Thoroughly By Using Mechanical Cleaning Methods. , 1.0020 B) Fuel Tank - Renew Defective Paint Coats As Following: (M/S Akzonobel Paints Pvt. Ltd.) , 1.0021 A) Fw Tanks- Clean The Tanks Thoroughly By Using Mechanical Cleaning Methods. St3 Standards, (02 Tanks Of 15 Sqm Each.) , 1.0021 B) Fw Tanks- Renew Paint Coats As Following: (M/S Akzonobel Paints Pvt. Ltd.) Cold Bituminous Solvent (Intertuf Jba 016) To Achieve 150 Μ Dft. , 1.0022 A) Machinery Bilges - Carry Out Visual Survey Of Machinery Compartments And Bilges After Removing Floor Plates And Other Obstructions, If Any. , 1.0022 B) Machinery Bilges - Surface Preparationpaint Scheme: (M/S Akzonobel Paints Pvt. Ltd.) Method Of Surface Preparation Power Tooling To St3 Standard. , 1.0022 C) Machinery Bilges - Paint Restoration(A) Epoxy High Build Interguard 403 Buff (Kba 400) To Achieve 150 Μ Dft. , 1.0022 D) Machinery Bilges - Paint Restoration(B) Epoxy High Build Interguard 403 Buff (Kba 402) To Achieve 150 Μ Dft. , 1.0023 Internal Bulk Headscarryout Survey And Repairs After Removal Of Panelling And Lagging Of Bulkheads At Suspected Location. Defects Observed To Be Rectified. Panneling To Be Fitted Back Post Repairs , 1.0024 A) Llrw Tanks - (A) Carry Out 100% Visual Survey And 100% Usg Of Ss Tanks (07 No). , 1.0024 B) Llrw Tanks (B) Radiometric Testing Of Lead Cladded Tanks. Note: Report To Be Submitted From Registered/ Accredited Certified Agency. , 1.0025 A) Doors - (A) Check Clips, Hinges For Looseness And Wedge Pieces For Signs Of Wear. Examine Rubber Sealing. Repair If Defective , 1.0025 B) Doors - (B) Carry Out Watertight Integrity Checks Of All Doors In Accordance With Br 2170 , 1.0025 C) Doors- (C) Carry Out Chalk Test Of All Doors. , 1.0025 D) Doors - (D) Renew Rubber Sealing If Defective , 1.0026 Scuttle And Windowssurvey Window/ Scuttle Structure And Frame For Deterioration. Inspect Toughened Glass, Glass Rails Securing Arrangements For Intactness And Correct Alignment. Repair/ Renew As Necessary , 1.0027 Hatches And Manholes(A) Examine All Parts Of Hatches E.G. Pins, Hinges, Clips, Rubber Gaskets, Brass Pinion And Structure Of Hatch. Renew Or Repair As Necessary. , 1.0027 B) Hatches And Manholes(B) Carry Out Chalk Test Of All Wt Hatches. , 1.0027 C) Hatches And Manholes(C) Renew Rubber Gaskets , 1.0027 D) Ladders (Vertical And Slope)(A) Inspect And Renew As Necessary, Portable Aluminium Treads Of Between Deck Ladders. , 1.0028 Ladders (Vertical And Slope)(B) Neceassary Repairs To Be Undertaken For Galvanised Ladders , 1.0029 A) Rubber Fenders To Be Removed And Refitted To Facilitate Blasting, Survey, Repairs And Painting On Undernith Area Of D Fenders. (A) Flat Bars Of Length 5 Mtrs Each Fitted With Studs And Nuts. Firms To Quote Including Material With New Materail & Fastners , 1.0029 B) Rubber Fenders Fitted To Be Renewed (Neoprene Rubber, Sea Water, Oil, Dust, High Temperature Resistant, Hardness 70+/- 4)(A) D- Shaped – 23, Length 5 Mtrs Each , 1.0029 B) Rubber Fenders Fitted To Be Renewed (Neoprene Rubber, Sea Water, Oil, Dust, High Temperature Resistant, Hardness 70+/- 4)(B) Cylindrical – 28Length Of Cylindrical Fender- 1.45M , 1.0030 A) Rubber Fenders - Securing Chains For Cylindrical Fender To Be Renewed Along With D Shackles Post Repairs To The Securing Brackets :Length Of Fender Chain - 1.7M, 16Mm Dia(Mat-Gi) , 1.0030 B) Rubber Fenders - Securing Sleeves For Cylindrical Fender Of Dia 03 Inch And Length 250 Mm (Mat Ms Pipe Of 06Mm Thick) , 1.0030 C) Rubber Fenders - Fender Brackets To Be Renewed , 1.0031 A) Fire Locker To Be To Renewed (Fibber Material) As Per S Le , 1.0031 B) Fire Hoses To Be Renewed (10M) , 1.0031 C) Fire Hydrant And Fire To Be Painted Red , 1.0032 Floor Plates- Defective Plating In Machinery Compartment To Be Renewed. Mat - Al , 1.0033 A) Deck Covering In Accommodation Compartments, Bridge, Main Alleyways And Tank Space Damaged To Be Renewed. Area -- 500 Sq Mtrsmaterial --Linoleum, Marine Grade,3Mm. , 1.0033 B) Deck Covering In Wet Compartments Damaged To Be Renewed Macrotech Post Requisite Surface Preparation As Per New Scheme. , 1.0034 A) Manufacturing Of Covers For The Following Fittings On Upper Deck.Mat : Canvasanchor Windlass Control Panel – 01 No. , 1.0034 B) Manufacturing Of Covers For The Following Fittings On Upper Deck.Mat : Canvasanchor Windlass Motor – 01 No. , 1.0034 C) Manufacturing Of Covers For The Following Fittings On Upper Deck.Mat : Canvasmain Broadcasting Speakers – 02 No , 1.0034 D) Manufacturing Of Covers For The Following Fittings On Upper Deck.Mat : Canvasac Outdoor Unit-05 , 1.0035 Unit Logo Of Sss Is To Be Painted On Superstructure As Indicated By Ss. ( 1M X 1M) , 1.0036 Nuclear Radiation Symbol Is To Be Painted On All Hatches, Collection Tanks And On Superstructure As Indicated By Ss. (20 Cm X20 Cm) , 1.0037Ro Not Working. To Be Renewed.(Capacity - 15 Liters) , 1.0038Twin Elertic Plate To Be Repaired Capacity 1Kw(Each), Supply 230V 50Hz, Oem: Guna Enterprises , 1.0039 Ships Illumination Board To Be Renewed , 1.0040Wooden Chairs Detoriorated. To Be Renewed With Feather Light Cushioned Chair , 1.0041Heighted Chair Of Wheel House To Be Renewed With Feather Light Cushioned Chaire , 1.0042 Mast To Be Surveyed And Necessary Repairs To Be Undertaken , 1.0043 Wooden Cupboards To Be Repaired And Locking Arrangement To Be Fixed. , 1.0044 Mettalic Shoe Racks Under Bunks To Be Repaired. , Description - Engineering Note:Projected Scope Work Including Spares And Material Firms Requested To Quote Considering The Same. Non Quoting Of The Material / Spares Column Will Be Considered As Lump Sum Quote And No Growth Of Work Will Be Admitted. , 1.1001 Main Diesel Alternator(Make & Model: Kirloskar Oil Engine 6R 1080T, 100 Kva, 127 Bhp @ 1500 Rpm) Spare List Enclosed , 1.1001 Main Diesel Alternator (A) Carry Out 1000 Hourly Routine Of Da As Per User Manual And Prove For Satisfactory Performance , 1.1001 Main Diesel Alternator(B) Engine Oil: Drain And Renew The Oil. (Omd 113, Qty: 25 Ltrs) , 1.1001 Main Diesel Alternator(C) Rubber Hose: Check The Condition Of Rubber Hose And Clips. Renew. (79.563.01.0.00) , 1.1001 Main Diesel Alternator(D) Lub Oil System: Renew Lub Oil Filter Element/Cartridge. , 1.1001 Main Diesel Alternator(E) Clean Centrifugal Filter. , 1.1001 Main Diesel Alternator(F) Fuel System: Renew Filter Cartridge Of Fuel System And Clean Primary Fuel Filter , 1.1001 Main Diesel Alternator(G) V- Belt: Check Condition And Tension Of V-Belt. Replace And Adjust. , 1.1001 Main Diesel Alternator(H) Radiator And Cooling System: Chemical Cleaning Of Radiator Tubes. Drain And Refill The Cooling System. Coolant Supplied By The Ss. , 1.1001 Main Diesel Alternator(J) Tappet Valve: Check Valve Clearance And Adjust If Necessary. , 1.1001 Main Diesel Alternator(K) Check Fasteners For Tightness. , 1.1001 Main Diesel Alternator(L) Check All Foundation Bolts Of Dg. , 1.1001 Main Diesel Alternator(M) Exhaust System: Clean Exhaust Silencer & Piping Da Exhaust Pipe - Length- 6.5M, Dia-0.5M, Hot Lagging - 6.5 M , 1.1001 Main Diesel Alternator(N) Over Speed Trip: Check And Calibrate Over Speed Trip , 1.1001Main Diesel Alternator(P) Injector Unit: Check The Condition Of Injectors. , 1.1001 Main Diesel Alternator(Q) Turbo Charger: Check The Clearances Of Rotor Of Turbo Super Charger And Clean The Carbon Deposit , 1.1001 Main Diesel Alternator(R) Air Intake System: Renewal Of Filter , 1.1001 Main Diesel Alternator(S) Exhaust Trunking: Renewal Of Hot Laggingda Exhaust Pipe - Length- 6.5M, Dia-0.5M, Hot Lagging - 6.5 M , 1.1001 Main Diesel Alternator(T) Vibration: Measurement Of Vibration & Analysis Post Completion Of Routines , 1.1001 Main Diesel Alternator(U) Thermostat Element: Calibrate And Change If Necessary , 1.1001 Main Diesel Alternator(V) Fuel Pump: Overhauling Of Fuel Pump , 1.0001 Main Diesel Alternator (W) Sea Water Pump (I) Overhauling To Be Carried Out. , 1.0001 Main Diesel Alternator (W) Sea Water Pump (Ii) Pump Allignment To Be Fixed And V-Belt To Be Renewed. , 1.1001 Main Diesel Alternator(X) Thermostat Element To Be Renewed. , 1.1002 Pressure Gauges - Serviceability Checks, Calibration And Renewal Of Fallowing Pressure Gauges As Per S Le. , 1.1002 Pressure Gauges - Serviceability Checks, Calibration Of Fallowing Pressure Gauges As Per S Le(A) 0-10 Bar – 01 , 1.1002 Pressure Gauges - Serviceability Checks, Calibration Of Fallowing Pressure Gauges As Per S Le(B) -1 To 1.5 Kgf/Cm2 - 05 , 1.1002Pressure Gauges - Serviceability Checks, Calibration L Of Fallowing Pressure Gauges As Per S Le(C) 0 To 10 Kgf/Cm2 - 09 , 1.1002 Pressure Gauges - Serviceability Checks, Calibration Of Fallowing Pressure Gauges As Per S Le(D) –760 To O Mm Hg - 04 , 1.1002 Pressure Gauges - Serviceability Checks, Calibration Of Fallowing Pressure Gauges As Per S Le(E) – 1 To 1 Kgf/Cm2 - 02 , 1.1002 Temperature Gauges - Serviceability Checks, Calibration And Renewal Of Fallowing Pressure Gauges As Per S Le(F) 0 To 1200 C - 02 , 1.1002Temperature Gauges - Serviceability Checks, Calibration Of Fallowing Pressure Gauges As Per S Le (G) 0 To 6000 C - 01 , 1.1002 Rpm Indicator Serviceability Checks, Calibration Rpm Indicator (H) Rpm Indicator Range 0 – 4000) , 1.1002 Pressure Gauges - Renew Of Fallowing Pressure Gauges As Per S Le(J) 0-10 Bar , 1.1002Pressure Gauges - Renew Fallowing Pressure Gauges As Per S Le(K) -1 To 1.5 Kgf/Cm2 , 1.1002 Pressure Gauges - Renew Of Fallowing Pressure Gauges As Per S Le(L) 0 To 10 Kgf/Cm2 , 1.1002Pressure Gauges - Renew Of Fallowing Pressure Gauges As Per S Le(M) –760 To O Mm Hg , 1.1002 Pressure Gauges - Renewal Of Fallowing Pressure Gauges As Per S Le(N) – 1 To 1 Kgf/Cm2 , 1.1002 Temperature Gauges - Renew Of Fallowing Temparature Gauges As Per S Le(P) 0 To 1200 C , 1.1002 Temperature Gauges -Temperature Gauges - Renew Of Fallowing Temparature Gauges As Per S Le (Q) 0 To 6000 C , 1.1002 Rpm Indicator Serviceability Checks, Renew Rpm Indicator (R) Rpm Indicator Range 0 – 4000) , 1.1003Pressure Gauge Cock(A) Pressure Gauge Cocks Hard To Operate To Be Overhauled . , 1.1003 Pressure Gauge Cock(B) Pressure Gauge Cocks Handle Broken To Be Renewed. , 1.1003 Pressure Gauge Cock(C) Pressure Gauge Cocks Hard To Operate To Be Renewed. , 1.1004 Fuel Oil Separator, (Model: Mab – 103, Capacity: 0.5 M3/ Hr ), Oem: Alfa Laval (India) Ltd , 1.1004 Fuel Oil Separator,(A) Inlet And Outlet: Clean And Inspect Threads Of Inlet Pipes & Connecting Housing , 1.1004 Fuel Oil Separator,(B) Separator Bowl: Clean & Check Lock Ring, Bowl Hood, Top Disc, Gravity Disc, Bowl Discs, Distributor, Bowl Body, Corrosion, Erosion, Cracks And Disc Stack Pressure , 1.1004 Fuel Oil Separator,(C) Separator Bowl: Renew O-Rings And Sealings. , 1.1004 Fuel Oil Separator,(D) Gear Housing: Check Worm Wheel & Worm, Radial Wobble Of Worm Wheel Shaft, Axial Play Of Coupling Disc. , 1.1004 Fuel Oil Separator,(E) Gear Housing: Renew Worm Wheel & Worm, Radial Wobble Of Worm Wheel Shaft, Axial Play Of Coupling Disc If Defective. , 1.1004 Fuel Oil Separator,(F) Gear Housing: Renew Oil In Gear Housing (Castrol- Alpha Zn 220 / Alpha Sp 220 / Alphasyn Ep 220, Qty – 0.8 Litres). , 1.1004 Fuel Oil Separator, (G) Vertical Driving Device: Clean And Check Bowl Spindle, Wear Of Driver And Groove In Worm, Buffers, Ball Bearing Housing Indentations, Radial Wobble Of Bowl Spindle. , 1.1004 Fuel Oil Separator,(H) Vertical Driving Device: Renew Ball Bearings And Top Bearing Springs. , 1.1004 Fuel Oil Separator,(J) Brake: Clean And Check Spring And Brake Shoe , 1.1004 Fuel Oil Separator,(K) Brake: Renew Brake Plug. , 1.1004 Fuel Oil Separator,(L) Pump: Clean & Check Bushings, Wearing Seals, Shear Pin Coupling And Impeller Shaft. , 1.1004 Fuel Oil Separator,(M) Pump: Renew Lip Seal Ring. , 1.1004 Fuel Oil Separator,(N) Friction Pad: Clean And Check Friction Coupling. , 1.1004 Fuel Oil Separator,(P) Friction Pad: Renew Friction Pads. , 1.1004 Fuel Oil Separator,(Q) Mounts: Renew Rubber Mounts. , 1.1004 Fuel Oil Separator,(R) Electrical Motor: Clean And Check Position Of Coupling Disc. , 1.1005 Da Kirloskar (Kirloskar Oil Engine Ltd.) Ca1 (7.5 Kva, 1500 Rpm, Volts-415, S-10.4)1000 Hourly Routine To Be Undertaken, The Engine To Be Overhauled, Spare List Placed At The Appendix , 1.1005 Da Kirloskar (Kirloskar Oil Engine Ltd.) Ca1 (A) Overhauling Of The Alternator , 1.1005 Da Kirloskar (Kirloskar Oil Engine Ltd.) Ca1 (B) Renewal Of Alternator Bushes , 1.1006 Anchor Windlass/ Capstan Completely Strip & Overhaul Anchor Windlass (Including Lub Oil Renewals), Renew Brake Linings, Refit And Prove For Satisfactory Operation.Note :- Overhaul Involves Removal Of Drum, Gearbox, Brake Lining, Motor And Ovrhaul Of All These Items And Refitment. Oil-Sys-46/Hp80make:Geeta Engineering Worksanchor Hauling:2.5 Ton Pull At Speed 10 Mtr/Minwarping Head:2.5 Ton Pull At Speed 9 Mtr/Min(All Spares Not Covered In Mandatory List To Be Included In Boq For Material.)Firm To Quote Overhauling Of One Set Each Windlass/Capstan And Prove System For Satisfactory Operation. , 1.1007 Gs Pump/ Bilge Pump (Electric Driven, Horizontal)(A) Overhauling Of Pump (Cost Of Spares Included In Routine Mentioned) Details: Centrifugal Pump, Model : Ma 1024Kk-4 Capacity : 40 Tph @ 6.5 Baroem: B.E Pumps Pvt. Ltd , 1.1007 Gs Pump/ Bilge Pump (Electric Driven, Horizontal)(B) Overhauling Of Pressure Relief Valve Of Gs Pump (Sat. Pressure At 6 Kg/Cm2) , 1.1007 Fresh Water Pumpoverhauling Of Electric Driven, Horizontal. (Cost Of Spares Included In Routine Mentioned)Details: Centrifugal Pump, Capacity: 02 Tons/ Hour @ 2.5 Baroem: B.E Pumps Pvt. Ltd , 1.1007 Water Polishing Pumpoverhauling Of Electric Driven, Self-Priming, Horizontal, Centrifugal Pump. (Cost Of Spares Included In Routine Mentioned)Details: Capacity: 04 Tons/ Hour. Oem: B.E Pumps Pvt. Ltd , 1.1007 Sewage Discharge Pumpoverhauling Of Electric Driven, Self-Priming, Horizontal.Details: Cenrifugal Pump, Capacity: 03 Tons/ Hour @ 1.5 Bar. Cost Of Spares Included.Oem: Johnson Pump India Ltd , 1.1007 Waste Water Transferring Pumpoverhauling Of Electric Driven, Self-Priming, Horizontal,Details: Centrifugal Pump, Capacity : 40 Tons/ Hour. @ 2.9 Bar. Cost Of Spares Included In Routine Mentioned. Oem: B.E Pumps Pvt. Ltd. , 1.1007 Semi Rotary Hand Pump (Capacity : 1 Ton/ Hour)Overhauling Of Semi Rotary Hand Fuel Pump. (Cost Of Spares Included In Routine Mentioned)Oem: Bhargarb Engineering Works , 1.1007 Submersible Pump - (A) Carry Out Overhauling Model : P - 3/7.5 Hp, Electric Diven, Self Priming, Submersible Pump, Capacity : 35 Tons/ Hour @ 2 Baroem: Seemsan Pumps & Equipment Pvt Ltd , 1.1007 Submersible Pump(B) Change Sealing Chamber Oil. (Oil – Castrol /Sae 250 / Servo 250, Qty – 250 Cc ). , 1.1007 Submersible Pump(C) Change Motor Oil. (Oil – Transformer Oil Gr Bss148-1950 Or Poweroil Manufactured By Special Oil Refineries To Is: 335, Qty:4 To 5 Liters). , 1.1008 Split Air Conditioner(A) Overhauling, Repairs And Gas Filling Of Following Split Acs To Be Undertaken And Made Operational (Quote Inclusive Of Necessary Spares And Materail) .Make- Godrej, Capacity -1.5 Ton, Nos- 03 Make- Voltas, Capcity- 02 Tons Nos- 3 , 1.1008Split Air Conditioner(B) Renew For Following Split Acs As The Condition Detoriorated .Make- Carrier, Capacity- 02 Tons , 1.1008 Air Compressormodel: Air Compressor, Ts03120h( 02 Cylindrical, Reciprocating, Air Cooled, Splash Lubricated, Working Pressure – 12 Kgf/Cm2) Firms To Quote Including Spares , 1.1008 Air Compressor(A) 1000 Hourly / 02 Yearly Maintenance , 1.1008 Air Compressor(B) Air System - Change Inlet Air Filter Element , 1.1008 Air Compressor(C) Receiver - Clean And Test Air Receiver , 1.1008 Air Compressor(D) Fasteners - Check Fasteners For Tightness , 1.1008 Air Compressor(E) Oil - Drain & Change Oil ( Servo Press, 01 Liter) , 1.1008 Air Compressor(F) Compressor Motor - Overhaul Of Compressor Motor , 1.1008 Air Compressor(G) Relays - Calibration Of Cut In/ Cut Out Relays , 1.1009 Routines On Hp Air Cylinders. (A) Carry Out Chemical Claining Pressure Testing Capacity 220 Ltrs, Working Pr 12 Kg/Sq Cm , Test Pr 19.8 Kg/ Sq Cm , 1.1010 Fuel Ready Use Tank.Drain The Tank And Carry Out Hand Cleaning To Clear Sediments. Sight Glass Clogged To Be Cleaned. Requirement Of Cleaning. Qty: 01, Mat : Ss , 1.1011 Fresh Water Expansion Tank(A) Drain The Tank And Carry Out Hand Cleaning To Clear Sediments. , 1.1011 Fresh Water Expansion Tank(B) Renewal Of Valve Qty: 01. Mat : Ss , Type Of Outlet Valve 20Mm Domestic Tap , 1.1012 Renew Syntex Tanks (A) Renew Syntex Tanks(1000 Ltrs) , 1.1012Renew Syntex Tanks(B) S/W And F/W Overhead Syntex Tank Durite Hose Perisheddia.- 25Mm- 05, Length- 2 Meters40mm- 01,Length- 2 Meters , 1.1013 Purge Type Level Monitoring Systemoem:- Pune Instrumentation Pvt Ltd , 1.1013 Purge Type Level Monitoring System(A) Pressure Test Of The System And Check For Leakages. 2 Kg/Sq. Cm , 1.1013 Purge Type Level Monitoring System(B) Calibration Of Entire System. Working Pressure – 1Kg/Cm2 , 1.1014 Dg Fuel System(A) Overhauling Of System Valve: Nb 65Mm , 1.1014 Dg Fuel System(B) Cleaning Of Pipeline: 65Mm Dia , 1.1014 Dg Fuel System(C) Pressure Testing Of The System (Press- 2 Kg/Cm2) , 1.1015 Dg Sea Water System(A) Overhauling System Valves(Sdnr Valve Nb 50 Mm, Right Angle Valve, Nb 50 Mm) , 1.1015Dg Sea Water System(B) Chemical Cleaning Of Pipelines: 50 Mm , 1.1015Dg Sea Water System(C) Pressure Testing Of The System ( Press- 2 Kg/Cm2) , 1.1016 Fire Main And Bilge System(A) Carry Out Survey Of System Pipe Lines For Corrosion & Repair/Renewal As Per Requirement (Dia- 80Mm) , 1.1016 Fire Main And Bilge System(B) Chemical Cleaning Of Pipelines: 80 Mm , 1.1016 Fire Main And Bilge System(C) Eductor Cleaning / Maintenance And Change Of Ventury Element If Required. , 1.1016 Fire Main And Bilge System(D) Carry Out Renewal Of Defective System Pipe Lines As Necessary , 1.1016 Fire Main And Bilge System(E) Overhauling Of Folllowing System Valves: (I) Gate Valve / Butterfly Valve, Nb 200 Mm (Including 02 In No. Sea Chest Valve) – 04(Ii) Sdnr Valve, Nb 80 Mm - 6.(Iii) Sdnr Valve, Nb 100 Mm - 2(Iv) Sdnr Valve, Nb 65 Mm - 2(V) Sdsl Valve, Nb 80 Mm - 3.(Vi) Sdsl Valve, Nb 50 Mm - 2 (Vii) Sdnr Valve (Right Angle),Nb 80 Mm - 1(Viii) 3 Way Cock Valve, Nb 80 Mm - 1(Ix) Flat Nr Valve, Nb 65 Mm - 2 (X) Foot Valve Cum Strainer,Nb 65 Mm - 2(Xi) Fire Hydrant Valve, Nb 65 Mm - 5Details:- Sdnr Vvs--Gun Metalsdsl Vvs --Gun Metalpipelines -- Seamless Copperworking Pr 3 Kg/ Sq Cm , 1.1017 Fire Main And Bilge System(F) Pressure Testing Of The System ( Press- 3Kg/Cm2) , 1.1017 Domestic F/W System(A) Overhauling Of System Valves(Sdsl Valve, Nb 50 Mm – 04Sdnr Valve, Nb 25 Mm – 02Float Valve, Nb 25 Mm With Cut-Off Switch - 01)Details: - Sdsl Vvs -Cipipelines -- Seamless Copperworking Pr 3 Kg/ Sq Cm , 1.1017 Domestic F/W System (B) Chemical Cleaning Of Pipelines: 50 Mm , 1.1017 Domestic F/W System (C) Pressure Testing Of The System ( Press- 3 Kg/Cm2) , 1.1018 Low Pressure Air Systempressure Test The System (Max Upto 12 Kg /Cm2 ). , 1.1019 Liquid Waste Water System(A) Carry Out The Pressure Test Of The System (Upto 04.5 Kg/Cm2 , 1.1019 Liquid Waste Water System(B) Cleaning Of Ss Tanks (Capacity 12,000 Ltr Each Tank). Carry Out Cleaning Of Ss Tanks By Flushing Through With Soap Water For 03 Cycles Followed By Fresh Water As Required By Ship Staff , 1.1019Liquid Waste Water System(C) Dpt Of Steel Tanks , 1.1019 Liquid Waste Water System(D) Overhauling Of System Valves(I) Ordinary Valve, Nb 65Mm – 9.(Ii) Non Return Valve(Ss), Nb 65 Mm - 2(Iii) Sdsl Valve, Nb 65 Mm – 02(Iv) Nr Valve, Nb 50 Mm – 10.(V) Nr Valve, Nb 65 Mm – 05(Vi) Ordinary 3-Way Valve, Nb 65 Mm – 01(Vii) Electro Magnetically Remote & Manual Operated Valve, Nb 65 Mm – 02.(Viii) Electro Magnetically Remote & Manual Operated Nr Valve, Nb 65 Mm – 04.Note: Firms To Consider For Ss Material For Valves And Pipes While Quotepipe Lines --Material Ss 321 , 1.1020 Foundations Of Pumps And Motorsdamaged Foundations Of Pumps And Motors To Be Repaired 10 No , 1.1021 Waste Storage Tanks(A) Pneumatic Pressure Testing Of All Tanks For 0.3 Kg/Sq.Cm. Safe Pressure 0.5Kg/Sq.Cm , 1.1021 Waste Storage Tanks(B) Carryout Ndt (Die Penetrant Test) For All Tanks In The Welding Seam , 1.1022 Steering Gear Systemcalibrate Pressure Relief Valve. Pressure 46.6 Kg/Cm2 , Description - Electricalnote: Projected Scope Work Including Spares And Material Firms Requested To Quote Considering The Same. Non Quoting Of The Material / Spares Column Will Be Considered As Lump Sum Quote And No Growth Of Work Will Be Admitted. , 1.2001 Nav Lights(A) Masthead, Port And Stbd Lights, Stern Light To Be Renewed Along With The Wirings (Supply 230V Ac & 24V Dc) , 1.2001 Nav Lights(B) Rubber Sealing Of All Nav Lights To Be Renewed. , 1.2001 Nav Lights(C) Shades To Be Renewed With Fittings For All Nav Lights , 1.2001 Mast Lighting Cable(D) Mast Lighting Cable Perrished. To Renewed With Weather Proof Two Core Cable. 1.5 Sq Mm , 1.2002 Mimic Panel(A) Blow Through The Panels With Dry Compressed Air At 2Kg/ Cm2. , 1.2002 Mimic Panel(B) Circuit Checks To Be Carried Out. Repairs To Be Carried Out As Required. System To Be Proved (24V-08, 220V-06) , 1.2002 Mimic Panel(C) Check To Ensure That All Service Tallies And Cable Tallies Are In Place. , 1.2002 Mimic Panel(D) Indication L S And Defective Cabling To Be Renewed. , 1.2003 Purge Type Level Monitoring System(A) Calibration Of Sensors, Circuit Checks And Repair To Be Carried Out Type Of Sensors Ptlm 0.5, Input Power 24V Dc. System To Be Proved. , 1.2003 Purge Type Level Monitoring System(B) Renew Following Sensors / Items If Defective: -(I) Rotameter , 1.2003 Purge Type Level Monitoring System(B) Renew Following Sesors / Items If Defective: (Ii) Level Indicator , 1.2003 Purge Type Level Monitoring System(B) Renew Following Sesors / Items If Defective: (Iii) Pressure Transmeter. , 1.2003 Purge Type Level Monitoring System(B) Renew Following Sesors / Items If Defective: (Iv) Pressure Regulator (Analog Pr Gauge). , 1.2004 Emergency Lighting(A) Circuit Checks To Be Carried Out. Repairs To Be Carried Out As Required. System To Be Proved , 1.2004 Emergency Lighting(B) Batteries To Be Renewed ( 24V Dc Lead Acid Battery 200 Ah) , 1.2005 Electromagnetic Valve Of Lead Shielded Tanksremote Operation Of Electromagnetic Valve And Their Indication On Mimic Panel To Be Proven.Quote Including Repair/ Remnewal Of Valves, If Defective.Details: (14 Core Shielded Cable)Em Valves Solenoid Supply 24 Volts Dc 07 No , 1.2006 Sewage Tank Indicationlower Level And Upper Level Sensordetails :Ultrasonic Level Sensor Bk533,15Ks. To Be Replaced/ Rectified And Calibrated. , 1.2007 Overhead Fresh Water Tank Level Indicationlower And Upper Level Sensor: Float Sensor Water Switch Details: Ws952(1/2) 250 Ac (Ip67 T60). To Be Replaced/Rectified And Calibrated , 1.2008 Alternator(A) Overhauling Of Alternator Set And Checking Of Control Circuit /Protections As Per Chapter 4 Of Oem Manuel. Capacity 100Kva , 1.2008 Alternator(B) Check The Operation Of Cut Outs And Protections. , 1.2008 Alternator Controls(C) Carry Out Calibration Of System , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(I) Kg1000w Alternator Mcb , Moulded Case Circuit Breaker , 32 S 24 V Dc Operation. , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(Ii) Over Speed Relay, 1550 Rpm , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(Iii) Low Oil Pressure, 2.5 Kgf/Cm , 1.2008 Alternator Controls(C) Carry Out Calibration Of System. (Iv) High Engine Oil Temp., 85 C , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(V) Charge Fail Alarm All Timer And Delay, 24 V Dc , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(Vi) Engine Stop Relays, 24 V Dc , 1.2008 Alternator Controls(C) Carry Out Calibration Of System(Vii) All Indications, 24 V Dc , 1.2009 Main Switch Board(A) Blow Through The Panels With Dry Compressed Air At 2 Kgf/ Cm2 , 1.2009 Main Switch Board(B) Check The Status Of Foundation Bolts And Shock Mountings. Replace Defective , 1.2009 Main Switch Board(C) Check All Contacts And Replace If Necessarydetails: Mcb Merlin Gerin Ns160n 750V ,8Kv,125A Qty 01, Mcb Merlin Gerin Ns250n,750,8Kv 100-250A, Qty 01 , 1.2009 Main Switch Board(D) Renew Locking Arrangement Of Msb. , 1.2010 Light Fittings Check All The Lighting Tubes And Connections From 220V Ac. Replace Bulbs/Tubes With Led Fittings As Necessarydetails : Tl20001 8W ,220-240V 50 Hz Qty 15 Nos,L7434977, 18W/54 Qty 25, 11W/Su-865 Qty 10 Nos , 1.2011 Vhf Rt 5022 (Sailors Set)Serviceability Checks Of Vhf Set. Renewal/ Repair Of Entire Set And Associated Fittings. , 1.2012 Spt(A) Serviceability Checks Of Spt. Details: Zenitel Marine Vingtor Vsp Battery Less Telephone System , 1.2012 Spt(B) Renewal Of Receiver Cord , 1.2013 Electric Motor Driven Windlass (Single Speed)(A) Carry Out Serviceability Checks And Operation Trials Of Electromagnetic Brake , 1.2013 Electric Motor Driven Windlass (Single Speed)(B) Overhauling Of Motor. Check The Condition Of Bearing And Lubrication. Carry Out Inspection Of Impeller. Overhaul/Renew As Required( Power Ratting : 7.5 Kw Input Supply = 415 V 3 Phase 50 Hz) , 1.2014 Exhaust Fan Motor(A) Overhauling Of Motor ( Power Ratting: 0.55 Kw & 0.37 Kw, Input Supply = 415 V, 3 Phase 50 Hz) , 1.2014 Exhaust Fan Motor(B) Check The Condition Of Bearing And Lubrication. , 1.2014 Exhaust Fan Motor(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 2015 Gs Pump Motor (Bilge Pump Motor)(A) Overhauling Of Motor (Power Ratting :18.5 Kw Input Supply = 415 Volt 3 Phase 50 Hertz) , 1.2015 Gs Pump Motor (Bilge Pump Motor)(B) Check The Condition Of Bearing And Lubrication , 1.2015 Gs Pump Motor (Bilge Pump Motor)(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2016 Fresh Water Pump Motor(A) Overhauling Of Motor (Power Ratting : 0.75 Kw, Input Supply = 415 V 3 Phase 50 Hz) , 1.2016 Fresh Water Pump Motor(B) Check The Condition Bearing And Lubrication , 1.2016 Fresh Water Pump Motor(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2017 Sewage Discharge Pump Motor(A) Overhauling Of Motor (Power Ratting : 3.75 Kw, Input Supply : 415 V 3 Phase 50 Hz) , 1.2017 Sewage Discharge Pump Motor(B) Check The Condition Of Bearing And Lubrication , 1.2017 Sewage Discharge Pump Motor(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2018 Liquid Waste Transfer Pump(A) Overhauling Of Motor (Power Ratting :18.5 Kw, Input Supply = 415 V 3 Phase 50 Hz) , 1.2018 Liquid Waste Transfer Pump(B) Check The Condition Of Bearing And Lubrication , 1.2018 Liquid Waste Transfer Pump(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2019 Water Polish Pump Motor(A) Overhauling Of Motor (Power Ratting :15.0 Kw, Input Supply = 415 V 3 Phase 50 Hz) , 1.2019 Water Polish Pump Motor(B) Check The Condition Of Bearing And Lubrication , 1.2019 Water Polish Pump Motor(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2020 Battery Charging Distribution Box(A) Blow Through The Panels With Dry Compressed Air At 2 Kgf/ Square Cm , 1.2020 Battery Charging Distribution Box(B) Inspect All Contacts Renew If Required (Ratting 25 S) , 1.2021 Submersible Pump Motor(A) Overhauling Of Motor ( Power Ratting:15.0 Kw) , 1.2021 Submersible Pump Motorcheck The Condition Of Bearing And Lubrication , 1.2021 Submersible Pump Motor(C) Carry Out Inspection Of Impeller. Overhaul/Renew As Required , 1.2022 Ship Sirenships Siren Non-Operational. To Be Replaced. , 1.2023 Bunk Lighting 10 In No Bunk Lights Not Operational. Specification L : 220 V, 50 Hz , To Be Replaced With Led Light Fitting Of 10Watt , 1.2024 Carry Out Overhauling Of Following Electrical Starters Panels/ Control Panels(A) 0-5Kw Capacity--02 Nos , 1.2024 Carry Out Oh Of Following Electrical Starters Panels/ Control Panels(B) 5.5-Kw Capacity--01 Nos , 1.2024 Carry Out Oh Of Following Electrical Starters Panels/ Control Panels(C) 7.5 -10 Kw Capacity--03 Nos , 1.2024 Carry Out Oh Of Soft Starters (Frequency Controlled) (D) 18.5 Kw Capacity , 1.2025 Ceiling Speakerrenew The Ceiling Speaker Along With Wiring , 1.2026 Alarm Bell(A) Chrome Plating Of Alarm Bell , 1.2026 Alarm Bell(B) Overhauling Of The Alarm System Including Push Button , 1.2026 Water Purifier(C) Water Purifier Not Fuctining Properly. To Be Renewed. One One Set Of Purifier Repair Kit To Provisioned. Make : Aqua Guard -12 Ltrs, Ro, Uv & Uf , 1.2027 Intercom Telephoneserviceability Checks Of The Intercom Telephone , 1.2028 Transformer. (A) Overhauling Of Lighting Transformer. , 1.2028 Transformer. (B) Load Re-Distribution For Split Ac In 06 Men Cabin. (Load To Be Shifted From Lighting Transformer To Ac Transformer) , 1.2028 Transformer. (C) Re-Winding Of Transformer And Prove For Satisfactory Performance , 1.2029 Deck Lighting (A) Deck Lights Not Operational. , 1.2029 Deck Lighting (B) Glass Cover Broken, To Be Renewed. , 1.2030 Electric Fan To Be Renewed Mounted With Bunks. , 1.2031 Main Broadcast System (A) Voice Maximum Volume And Clarity To Be Enhanced. Modify If Required. , Dd & Allied Services(A) Docking And Undocking Charges (Both Versions) - , (B) Dock Blocks Preparation & Laying Out As Per Docking Plan , Dock Hire Charges For An Estimated Duration Of 60 Days As Per Ocr
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 25 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender