Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Tug Balram; Service Provider - U/W Hull & Boot Top Area, Appendages To Be Cleaned
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Tug Balram; Service Provider - U/W Hull & Boot Top Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Material Cost , Ultrasonic Gauging Readings At Under Water, Above Water And Deck Area To Be Carried Out. Report For The Same To Be Provided. Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Interguard 269: Dft 50 Micron, 2 Fc Intershield 300: Dft 2*150 Micron, 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Interguard 269; Dft 1*50 M, 2 Fc Intershield 300; Dft 2*150 M, 1 Fc Interguard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Interguard 269: Dft 50 Micron, 2 Fc Intershield 300: Dft 2*150 Micron, 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Interguard 269; Dft 1*50 M, 2 Fc Intershield 300; Dft 2*150 M, 1 Fc Interguard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Material Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Material Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Service Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Material Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Material Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Service Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Material Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Service Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Material Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Service Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Material Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538:Dft 1*80 M, 2 Fc Interlac 665: Dft 2*40 M. Service Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538:Dft 1*80 M, 2 Fc Interlac 665: Dft 2*40 M. Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Material Cost , F/W Tanks And Overhead Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Service Cost , F/W Tanks And Overhead Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Material Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Service Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Material Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Material Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Service Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Material Cost , Steel Renewal- Steel Plate Is 2062 Grade B Thickness Ranging 4Mm To 12 Mm Including Bulwark. Service Cost , Steel Renewal- Steel Plate Is 2062 Grade B Thickness Ranging 4Mm To 12 Mm Including Bulwark. Material Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat- Is 2062 Grade A. Service Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat- Is 2062 Grade A. Material Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm- Mat - Is 2062 Grade A. Service Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm- Mat - Is 2062 Grade A. Material Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is 2062 Grade A. Service Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is 2062 Grade A. Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Material Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Service Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Material Cost , Tug Name Board On Either Side Of Port Stbd Catwalk To Be Repaired As Per Existing Arrangement. Service Cost , Tug Name Board On Either Side Of Port Stbd Catwalk To Be Repaired As Per Existing Arrangement. Material Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Service Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Material Cost , Port Hole Rubber Beading To Be Renewed. Hose Leak Test To Be Carried Out And Proved Ss Butterfly Nuts Of All Port Holes To Be Renewed (Qty-40) . Service Cost , Port Hole Rubber Beading To Be Renewed. Hose Leak Test To Be Carried Out And Proved Ss Butterfly Nuts Of All Port Holes To Be Renewed (Qty-40) . Material Cost , Weather Tight Main Doors Rubber Coaming To Be Renewed And Proved. Chalk Test To Be Carried Out. Service Cost , Weather Tight Main Doors Rubber Coaming To Be Renewed And Proved. Chalk Test To Be Carried Out. Material Cost , Aft Capstan With Motor To Be Overhauled Lub Oil To Be Renewed (Qty -70 Ltrs) Load Test To Be Carried Out And Certificate To Be Provided. Service Cost , Aft Capstan With Motor To Be Overhauled Lub Oil To Be Renewed (Qty -70 Ltrs) Load Test To Be Carried Out And Certificate To Be Provided. Material Cost , Forward Windlass Along With Motors To Be Overhauled Magnatic Brake ,Lub Oil And Brake Lining (Qty-02) To Be Rewed. Load Test To Be Carried Out Post Overhauling And Load Test Certificate To Be Provided Service Cost , Forward Windlass Along With Motors To Be Overhauled Magnatic Brake ,Lub Oil And Brake Lining (Qty-02) To Be Rewed. Load Test To Be Carried Out Post Overhauling And Load Test Certificate To Be Provided Material Cost , Damaged Breather Pipes Along With Wire Mesh On Weather Deck To Be Renewed As Per Existing Arrangement. Service Cost , Damaged Breather Pipes Along With Wire Mesh On Weather Deck To Be Renewed As Per Existing Arrangement. Material Cost , Damaged Guard Rails Including Stanchions/Guard Rail Door Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Service Cost , Damaged Guard Rails Including Stanchions/Guard Rail Door Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Material Cost , Dismentle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Of Washrooms ,Galley And Pantry. Eliminate Leakages, Repair Defective Pipes And Paint As Per Existing Colour Coding. Service Cost , Dismentle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Of Washrooms ,Galley And Pantry. Eliminate Leakages, Repair Defective Pipes And Paint As Per Existing Colour Coding. Material Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles. Clean, Grease All Joining Shackles. Change Cable Ends & Re-Mark Cable Lengths. Lubricate Anchor Flukes & Survey Of Cable Clench To Be Carried Out. Service Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles. Clean, Grease All Joining Shackles. Change Cable Ends & Re-Mark Cable Lengths. Lubricate Anchor Flukes & Survey Of Cable Clench To Be Carried Out. Material Cost , Anchor And Chain Cable, To Be Surveyed By Class Surveyor. Defective Cable Lenghts (If Dia Of Any Links Is Less Than 10% Of Original Dia, Dia- 20.5 Mm) To Be Renewed. On Completion Painting To Be Done. Paint Scheme: 3 Coats Of Bituminous Solution. Each Coat 30 Microns Each Survey Report Of Each Links To Be Forwarded. (Cable Link Dia- 20.5Mm)Service Cost , Anchor And Chain Cable, To Be Surveyed By Class Surveyor. Defective Cable Lenghts (If Dia Of Any Links Is Less Than 10% Of Original Dia, Dia- 20.5 Mm) To Be Renewed. On Completion Painting To Be Done. Paint Scheme: 3 Coats Of Bituminous Solution. Each Coat 30 Microns Each Survey Report Of Each Links To Be Forwarded. (Cable Link Dia- 20.5Mm) Material Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Service Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Material Cost , Ms Vent Flaps To Be Repaired. Service Cost , Ms Vent Flaps To Be Repaired. Material Cost , Single Bollard Staghorn Type Deformed To Be Repaired. Mat Ms. Pipe Of Length - 1300 Mm,Dia - 290 Mm,Thickness - 10 Mm Service Cost , Single Bollard Staghorn Type Deformed To Be Repaired. Mat Ms. Pipe Of Length - 1300 Mm,Dia - 290 Mm,Thickness - 10 Mm Material Cost , Survey Of Staghorn And Twin Bollard Along With Base Plate Foundation In Fore And Aft To Be Carried Out Post Surface Preperation And Paint To Be Reapplied Post Completion Survey Report To Be Provided Service Cost , Survey Of Staghorn And Twin Bollard Along With Base Plate Foundation In Fore And Aft To Be Carried Out Post Surface Preperation And Paint To Be Reapplied Post Completion Survey Report To Be Provided Material Cost , Ms Cleats Onboard To Be Renewed By By New Cleats Casting Conforming To Is 5220 Stds. Service Cost , Ms Cleats Onboard To Be Renewed By By New Cleats Casting Conforming To Is 5220 Stds. Material Cost , Twin Bollards On Foxle And Quater Deck To Be Surveyed By Surveyer And Survey Report To Be Forwarded. Repair/Build Up To Be Carried Out Post Survey If Any Thickness - 10 Mm Mat Ms Service Cost , Twin Bollards On Foxle And Quater Deck To Be Surveyed By Surveyer And Survey Report To Be Forwarded. Repair/Build Up To Be Carried Out Post Survey If Any Thickness - 10 Mm Mat Ms Material Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired. Spindle To Be Renewed. Service Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired. Spindle To Be Renewed. Material Cost , Renew All Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Service Cost , Renew All Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Material Cost , Rubber D-Fenders Type To Be Renewed As Per Classification Society Regulation And To Be Secured With Ms Coaming Of Thickness 10 Mm And Size 4 Inches. Service Cost , Rubber D-Fenders Type To Be Renewed As Per Classification Society Regulation And To Be Secured With Ms Coaming Of Thickness 10 Mm And Size 4 Inches. Material Cost , Rubber Fenders To Be Secured Using Ms High Tension Rods And Bolts. Service Cost , Rubber Fenders To Be Secured Using Ms High Tension Rods And Bolts. Material Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia:44.5 Inch Thickness -Width 16.5Inch. Service Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia:44.5 Inch Thickness -Width 16.5Inch.. Material Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. All Chain To Be Secured With Eyes. Eyes To Be Manufactured And Welded On Bulwark Plate On Port And Stbd Side Service Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. All Chain To Be Secured With Eyes. Eyes To Be Manufactured And Welded On Bulwark Plate On Port And Stbd Side Material Cost , Half Pipe Fender Of Dia 06 Inch To Be Renewed Around Ship Side. Matl: Ms. Service Cost , Half Pipe Fender Of Dia 06 Inch To Be Renewed Around Ship Side. Matl: Ms. Material Cost , Key Hole Fenders On Foxle And Aft To Be Renewed As Per Existing Arrangement. Fender Size: 250X250 Mm Key Hole Fenders With Length Between 500 Mm To 1150 Mm. Rubber Fenders To Conform To Is 14238 And Is 13848. Service Cost , Key Hole Fenders On Foxle And Aft To Be Renewed As Per Existing Arrangement. Fender Size: 250X250 Mm Key Hole Fenders With Length Between 500 Mm To 1150 Mm. Rubber Fenders To Conform To Is 14238 And Is 13848. Material Cost , Gi Sheet On Foxle And Quater Deck To Be Renewed With Corrugated Pvc And Secured With J-Boltsand Pipes Shed Area Approx 25Sqmtr Each.. Service Cost , Gi Sheet On Foxle And Quater Deck To Be Renewed With Corrugated Pvc And Secured With J-Bolts And Pipes Shed Area Approx 25Sqmtr Each. Material Cost , Securing Pipes Of The Pvc Sheet On Foxle And Quarter Deck To Be Renewed. Size 32Nb Dia .Service Cost , Securing Pipes Of The Pvc Sheet On Foxle And Quarter Deck To Be Renewed. Size 32Nb Dia .Material Cost , Crew Toilet Fresh Water Line Of Wc To Be Renewed. Mat: Gi. Service Cost , Crew Toilet Fresh Water Line Of Wc To Be Renewed. Mat: Gi. Material Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Service Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Material Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Service Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Material Cost , Renewal Of Ss Gents Urinal Pan With Porcelin Urinal Pan. Make: Isi Standard Make. Service Cost , Renewal Of Ss Gents Urinal Pan With Porcelin Urinal Pan. Make: Isi Standard Make. Material Cost , Renew Western Commode Indian Styl Commode With Jet Wash Assembly Flush Tank Orientation Of Both Commodes Seats To Be Placed With Sufficient Place. Make: Isi Standard Make. Service Cost , Renew Western Commode Indian Styl Commode With Jet Wash Assembly Flush Tank Orientation Of Both Commodes Seats To Be Placed With Sufficient Place. Make: Isi Standard Make. Material Cost , Replace Cabin Chairs Of Crew Cabin, Master And Chief Engg With Isi Standard Executive Chairs. Service Cost , Replace Cabin Chairs Of Crew Cabin, Master And Chief Engg With Isi Standard Executive Chairs. Material Cost , Replace Chairs Of Dining Hall With Isi Standard Easy Arm Chairs Matt - Service Cost , Replace Chairs Of Dining Hall With Isi Standard Easy Arm Chairs Matt - Material Cost , Bib Cocks / Shower Mixture / Water Tap In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Make Jaquar Service Cost , Bib Cocks / Shower Mixture / Water Tap In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Make Jaquar Material Cost , Repair Of Isolating Valves In , Master Cabin Toilet And Urinal Of Common Crew Bathroom Service Cost , Repair Of Isolating Valves In , Master Cabin Toilet And Urinal Of Common Crew Bathroom Material Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Renewal Of Fat/ Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Service Cost , Renewal Of Fat/Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Material Cost , Macrotek Deck Covering Of Wet Compartments And Passage Way To Be Renewed Service Cost , Macrotek Deck Covering Of Wet Compartments And Passage Way To Be Renewed Material Cost , Overhauling Of Seawage Treatment Plant (Stp) Motors, Pumps, Obd Valves And Control Panel To Be Carried Out . Cleaning And Painting Of Tank To Be Undertaken System To Provided Onboard Tug Post Fitment And Effluent Test Of Sewage Tank To Carried Out And Effluent Test Certificate To Be Provided Service Cost , Overhauling Of Seawage Treatment Plant (Stp) Motors, Pumps, Obd Valves And Control Panel To Be Carried Out . Cleaning And Painting Of Tank To Be Undertaken System To Provided Onboard Tug Post Fitment And Effluent Test Of Sewage Tank To Carried Out And Effluent Test Certificate To Be Provided Material Cost , Wet Basin / Wharfage Facility And Docking In Ver- I & Ii For 180 Days As Per Docking Plan. Joint Insp With Paint Oem/ Ss & Insp Agency. To And From Towing From Nd (Mbi) To Shipyard & Back. Service Cost , Voyage Insurance Of The Vessel Considering Cost Of Vessel As Rs 16.50 Cr Service Cost , Fitment Of Rain Protector Plates Above All Wt Doors On Weather Deck Mat-Ms Plate Of 36 Inch X 06 Inch Service Cost , Fitment Of Rain Protector Plates Above All Wt Doors On Weather Deck Mat-Ms Plate Of 36 Inch X 06 Inch Material Cost , Ss Wash Basin Along With Drain Line In Qurter And Crew Washroom, Master And Chief Cabin Washroom Wash Basin To Be Securing With Brackets Service Cost , Ss Wash Basin Along With Drain Line In Qurter And Crew Washroom, Master And Chief Cabin Washroom Wash Basin To Be Securing With Brackets Material Cost , Repair Of Fluid Transfer Pipeline Of Overtank On Bridge Top View Broken. Length Of Gi Pipe - 02 Mtrs Dia - 04 Inch Service Cost , Repair Of Fluid Transfer Pipeline Of Overtank On Bridge Top View Broken. Length Of Gi Pipe - 02 Mtrs Dia - 04 Inch Material Cost , Repair Of Door Frames Of Crew Washroom Cooroded And Broken Mat - Ms Service Cost , Repair Of Door Frames Of Crew Washroom Cooroded And Broken Mat - Ms Material Cost , Non Water Doors Of Crew Mess And Wash Room Misaligned And Not Closing Properly Defect To Be Rectified Including Locking Mechanism Service Cost , Non Water Doors Of Crew Mess And Wash Room Misaligned And Not Closing Properly Defect To Be Rectified Including Locking Mechanism Material Cost , Repair Of Gysers Of Master And Chief Washroom View Non-Ops Trials To Be Taken Post Fitment Service Cost , Repair Of Gysers Of Master And Chief Washroom View Non-Ops Trials To Be Taken Post Fitment Material Cost , Renewal Of Fire Fighting Extinguisher Securing Stand / Brackets View Damaged Service Cost , Renewal Of Fire Fighting Extinguisher Securing Stand / Brackets View Damaged Material Cost , Chemical Cleaning Of Drain Line Of All Wash Rooms , Stp, Messes, Galley And Pantry To Be Carried Out By Removal Of Pipelines. Post Chemical Cleaning Of Pipes , All Pipelines To Be Galvanised And Painted And Fitted Back On Original Postion . All Gaskets Of Flanges And Nuts And Bolts To Be Renewed Dia-25 Mm,50 Mm And 100 Mm. Service Cost , Chemical Cleaning Of Drain Line Of All Wash Rooms ,Stp,Messes, Galley And Pantry To Be Carried Out By Removal Of Pipelines. Post Chemical Cleaning Of Pipes , All Pipelines To Be Galvanised And Painted And Fitted Back On Original Postion . All Gaskets Of Flanges And Nuts And Bolts To Be Renewed Dia-25 Mm,50 Mm And 100 Mm. Material Cost , Renewal Of Dadoe Area Plate At Various Locations Found Corroded And Thinned Mat-Ms Plat Service Cost , Renewal Of Dadoe Area Plate At Various Locations Found Corroded And Thinned Mat-Ms Plat Material Cost , Overhauling Of Boat Davit Gear Box Along With Motors. Steel Wire Rope And Lub Oil And Gear Box Oil To Be Rewed As Per Existing. Destruction Test Of New Steel Wire Rope To Be Carried Out Prior Fitment And Certificate To Be Provided. Load Test To Be Carried Out Post Overhauling And Load Test Certificate To Be Provided Swl-M1.2 Tons As Per Built Specifications Service Cost , Overhauling Of Boat Davit Gear Box Along With Motors. Steel Wire Rope And Lub Oil And Gear Box Oil To Be Rewed As Per Existi. Destruction Test Of New Steel Wire Rope 6Mm To Be Carried Out Prior Fitment And Certificate To Be Provided. Load Test To Be Carried Out Post Overhauling And Load Test Certificate To Be Provided Swl-M1.2 Tons As Per Built Specifications Material Cost , Renewal And Fitment Of Boat Davit Lifting Hook Prior Load Test Of Boat Davit. Calibration Of Limit Switch For Steel Wire Winch And Load Test Of Boat Davit To Be Carried Out. New Auto Release Hook(Arh) To Be Placed And Certificate For Same To Be Provided .Service Cost , Renewal And Fitment Of Boat Davit Lifting Hook Prior Load Test Of Boat Davit. Calibration Of Limit Switch For Steel Wire Winch And Load Test Of Boat Davit To Be Carried Out. New Auto Release Hook(Arh) To Be Placed And Certificate For Same To Be Provided . Material Cost , Renewal Of Chequred Plates Of Machineries Compartment Thinned And Broken As Per Existing Dimension. Area 30 Sqmtr. Service Cost , Renewal Of Chequred Plates Of Machineries Compartment Thinned And Broken As Per Existing Dimension. Area 30 Sqmtr. Material Cost , Overhauling And Pressure Testing Of Obd Of Stp And Drain Lines Valves All Valves To Be Opened Overhauled And Pressure Tested. Post Testing All Vales To Be Fitted At Original Position All Gasket And Nut Bolts To Be Renewed Leak Test Trials To Be Provided On Complettion Of Valve Fitment Service Cost , Overhauling And Pressure Testing Of Obd Of Stp And Drain Lines Valves All Valves To Be Opened Overhauled And Pressure Tested. Post Testing All Vales To Be Fitted At Original Position All Gasket And Nut Bolts To Be Renewed Leak Test Trials To Be Provided On Complettion Of Valve Fitment Material Cost , Overhauling Of Towing Hook To Be Carried Out Post Overhauling Load Test To Be Undertaken And Certificate To Be Provided Proof Load-50 Tons Service Cost , Overhauling Of Towing Hook To Be Carried Out Post Overhauling Load Test To Be Undertaken And Certificate To Be Provided Proof Load-50 Tons Material Cost , Robotic Cleaning Og Ventilation Trunking Of All Messes/Cabin, Galley And Pantry To Be Carried Out Service Cost , Robotic Cleaning Og Ventilation Trunking Of All Messes/Cabin, Galley And Pantry To Be Carried Out Material Cost , Repair Of Rope Reel Bracket On Quarter Deck Broken From Base Foundation Service Cost , Repair Of Rope Reel Bracket On Quarter Deck Broken From Base Foundation Material Cost , Overhauling Of Rope Reel To Be Carried Out View Found Jammed Service Cost , Overhauling Of Rope Reel To Be Carried Out View Found Jammed Material Cost , Overhauling Of Rope Roller On Foxle To Be Carried Out View Found Jammed Service Cost , Overhauling Of Rope Roller On Foxle To Be Carried Out View Found Jammed Material Cost , Renewal Of Ss Wire Mesh Of Vetilation Trunking In Bridge View Corroded Service Cost , Renewal Of Ss Wire Mesh Of Vetilation Trunking In Bridge View Corroded Material Cost , Renewal Of Filters Of Water Purifier Of Water Coller Service Cost , Renewal Of Filters Of Water Purifier Of Water Coller Material Cost , Renewal Of Commode Seat Covers In Crew Bathroom Service Cost , Renewal Of Commode Seat Covers In Crew Bathroom Material Cost , Renewal Of Flush Tanks With Connecting Flexible Pipes Of Crew Washroom Service Cost , Renewal Of Flush Tanks With Connecting Flexible Pipes Of Crew Washroom Material Cost , Repair Of Galley Boiler View Not Working Service Cost , Repair Of Galley Boiler View Not Working Material Cost , Chemical Cleaning Of Greese Filter Of Hot Plate Of Galley. Service Cost , Chemical Cleaning Of Greese Filter Of Hot Plate Of Galley. Material Cost , Renewal Of Fire Fighting Extinguisher Securing Stand/ Brackets View Damaged Service Cost , Renewal Of Fire Fighting Extinguisher Securing Stand/ Brackets View Damaged Material Cost , Provisioning Of Portble Multigas Detector Sensors. Updated Calibration Certificate To Be Provided Service Cost , Provisioning Of Portble Multigas Detector Sensors. Updated Calibration Certificate To Be Provided Material Cost , Renewal Of Damaged Bulwark Plate With Both Side Enterance Doors Mat-Ms Plate. Service Cost , Renewal Of Damaged Bulwark Plate With Both Side Enterance Doors Mat-Ms Plate. Material Cost , Renewal Of Mattress Of Crew Mess Bunks As Per Existing Size Service Cost , Renewal Of Mattress Of Crew Mess Bunks As Per Existing Size Material Cost , Renewal Of Bedsheets Of Crew Mess Bunks. Service Cost , Renewal Of Bedsheets Of Crew Mess Bunks. Material Cost , Renewal Of Pillow Along With Cover Of Crew Mess Bunks Make Kurl-On Service Cost , Renewal Of Pillow Along With Cover Of Crew Mess Bunks Make Kurl-On Material Cost , Provisioning And Fitment Of New Water Cooler Alonwith Connecton Pipes And Drain Pipes. Trials To Be Taken Post Fitment Make - Blue Star , Capacity-80 Ltrs Service Cost , Provisioning And Fitment Of New Water Cooler Alonwith Connecton Pipes And Drain Pipes. Trials To Be Taken Post Fitment Make - Blue Star , Capacity-80 Ltrs Material Cost , Provisioning And Fitment Of New Kent Water Purifier (Ro+Uv+Uf+Tds Control) Alongwith Connection Pipes And Drain Pipes Trials To Be Take Post Fitment Capacity -10 Ltrs Service Cost , Provisioning And Fitment Of New Kent Water Purifier (Ro+Uv+Uf+Tds Control) Alongwith Connection Pipes And Drain Pipes Trials To Be Take Post Fitment Capacity -10 Ltrs Material Cost , Renewal And Provisioning Of Domestic Microwave Oven. Make - Samsung , Capacity-28 Ltrs Service Cost , Renewal And Provisioning Of Domestic Microwave Oven. Make - Samsung , Capacity-28 Ltrs Material Cost , Renewal And Provisioning Of Tea Cup For Drew Galley Mat - Ss Service Cost , Renewal And Provisioning Of Tea Cup For Drew Galley Mat - Ss Material Cost , Provisioning Of New Electric Induction For Crew Galley Make Filips 2100W Service Cost , Provisioning Of New Electric Induction For Crew Galley Make Filips 2100W Material Cost , Fire Hose Box To Be Renewed Matl Frp Service Cost , Fire Hose Box To Be Renewed Matl Frp Material Cost , Embarkation Light Stand To Be Repaired Service Cost , Embarkation Light Stand To Be Repaired Material Cost , Renew Single Steel Pipe Bollard Along With Base Plate Foundation In Fore And Aft As Per Is 5740/5625. Od Of Pipe: 18 Cms. Height: 150 Cms. Horn Extension From Bollard On One Side: 15 Cms, Dia: 8 Cms Solid Bar. Service Cost , Renew Single Steel Pipe Bollard Along With Base Plate Foundation In Fore And Aft As Per Is 5740/5625. Od Of Pipe: 18 Cms. Height: 150 Cms. Horn Extension From Bollard On One Side: 15 Cms, Dia: 8 Cms Solid Bar. Material Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall Service Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall Material Cost , Marine Plywoods Under Bunks Of Crew Mess Masters Cabin And Engineer Cabin To Be Renewed Service Cost , Marine Plywoods Under Bunks Of Crew Mess Masters Cabin And Engineer Cabin To Be Renewed Material Cost , Macrotek Deck Covering Of Bridge All Wcs Engineers And Master Cabin , Cabin Lobby, Mess/Rec Room Pantry To Be Renewed Service Cost , Macrotek Deck Covering Of Bridge All Wcs Engineers And Master Cabin , Cabin Lobby, Mess/Rec Room Pantry To Be Renewed Material Cost , Carry Out Overhauling Of Complete Switch Board Including Main Breakers (250 S) Qty 2 Bus Coupler (100 S) Qty 1 Renewal Of All Indiction And Control Wiring Replacement Of Apprx 10 Mcbs(60 S) Service Cost , Carry Out Overhauling Of Complete Switch Board Including Main Breakers (250 S) Qty 2 Bus Coupler (100 S) Qty 1 Renewal Of All Indiction And Control Wiring Replacement Of Apprx 10 Mcbs(60 S) Material Cost , The Wiring From Main Switch Board To Transformer To Dbs To Light Fitting In All The Compartmants Be Checked And Defective Wiring To Be Renewed (02 Core 230 V 50 Hz 1 Ph) Service Cost , The Wiring From Main Switch Board To Transformer To Dbs To Light Fitting In All The Compartmants Be Checked And Defective Wiring To Be Renewed (02 Core 230 V 50 Hz 1 Ph) Material Cost , Shore Supply Connection Box To Be Overhauled Service Cost , Shore Supply Connection Box To Be Overhauled Material Cost , Electrical Db For Ac Circuit To Be Overhauled Service Cost , Electrical Db For Ac Circuit To Be Overhauled Material Cost , Electrical Db For Dc Circuit To Be Overhauled Service Cost , Electrical Db For Dc Circuit To Be Overhauled Material Cost , 12V, 180/200 Ah Lead Acid Batteries To Be Renewed Service Cost , 12V, 180/200 Ah Lead Acid Batteries To Be Renewed Material Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Service Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Material Cost , Undertake Functional Checks Of 24 V Dc 230V Ac Navigational Light Control Panel Onboard Tug And Replace Rectify Defective Instrumentation, Wiring, Indications Switches Alarms Etc Service Cost , Undertake Functional Checks Of 24 V Dc 230V Ac Navigational Light Control Panel Onboard Tug And Replace Rectify Defective Instrumentation, Wiring, Indications Switches Alarms Etc Material Cost , 250 Watt Loud Hailer Lifier Including 05 In No Speakers To Be Renewed Service Cost , 250 Watt Loud Hailer Lifier Including 05 In No Speakers To Be Renewed Material Cost , Renew & Test Sound Powered Telephone Unit To Junction At 06 Locations Service Cost , Renew & Test Sound Powered Telephone Unit To Junction At 06 Locations Material Cost , Galley Hot Plate Not Working To Be Repaired And Tested Onboard Service Cost , Galley Hot Plate Not Working To Be Repaired And Tested Onboard Material Cost , All Light Fittings To Be Renewed With New Led Lights Service Cost , All 220 V Light Fittings To Be Renewed With New Led Lights Material Cost , All Navigational Light Fittings To Be Renewed Service Cost , All Navigational Light Fittings To Be Renewed Material Cost , Ael Fittings To Be Renewed Service Cost , Ael Fittings To Be Renewed Material Cost , All Weather Deck Light Fittings With L S To Be Cleaned And Overhauled Service Cost , All Weather Deck Light Fittings With L S To Be Cleaned And Overhauled Material Cost , Lighting Transformer (415V To 230 V) To Be Overhauled,Varnished,Insulation To Be Improved Service Cost , Lighting Transformer (415V To 230 V) To Be Overhauled,Varnished,Insulation To Be Improved Material Cost , Carry Out Overhauling Of Magnetic Compass And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Service Cost , Carry Out Overhauling Of Magnetic Compass And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Material Cost , All Voltmeter,Ammeter,Kw Meter ,Hz Meter To Be Renewed Onboard Service Cost , All Voltmeter,Ammeter,Kw Meter ,Hz Meter To Be Renewed Onboard Material Cost , Battery Bank Room (Trv Room Also) Door Not Open Properly Service Cost , Battery Bank Room (Trv Room Also) Door Not Open Properly Material Cost , All Earth Point To Be Check (Electrical Motor ) Service Cost , All Earth Point To Be Check (Electrical Motor ) Material Cost , W/H Side Light And Deck Side Light (Port & Stbd) All Change & Check Light Guard Is Broken Service Cost , W/H Side Light And Deck Side Light (Port & Stbd) All Change & Check Light Guard Is Broken Material Cost , Search Light And P&S Light Not In Place Service Cost , Search Light And P&S Light Not In Place Material Cost , Flood Light Port Side Aft Deck Is Broken To Be Change Service Cost , Flood Light Port Side Aft Deck Is Broken To Be Change Material Cost , Anchor Winch Motor Operation Rod Missing & Earthing Bolt Is Broken Service Cost , Anchor Winch Motor Operation Rod Missing & Earthing Bolt Is Broken Material Cost , Shore Supply Braker Overhauling In Swbd-1 Service Cost , Shore Supply Braker Overhauling In Swbd-1 Material Cost , Pa System At Various Places Including Main Controller Not Working In W/H Service Cost , Pa System At Various Places Including Main Controller Not Working In W/H Material Cost , Inmarsat Display Unit And Printer Not Working In W/H Service Cost , Inmarsat Display Unit And Printer Not Working In W/H Material Cost , Navtax Receiver Display And Printer Not Working In W/H Service Cost , Navtax Receiver Display And Printer Not Working In W/H Material Cost , Tank Gauge Non Showing Reading Properly Service Cost , Tank Gauge Non Showing Reading Properly Material Cost , Port Da Not Getting Start To Be Checked And Found Plc Problem Service Cost , Port Da Not Getting Start To Be Checked And Found Plc Problem Material Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water ,After Air, Lub Oil Coolers Service Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water, After Air, Lub Oil Coolers Service Cost , Undertake Removal Repair & Fitment Of Pipes From Exhuast Manifold Onwards Of Bme Exhaust Trunking Dia-Main Engine 300 Mm (Nb Post Chemical Cleaning And Pressure Testing (2.5 Kg/Cm2) Service Cost , Undertake Removal Repair & Fitment Of Pipes From Exhuast Manifold Onwards Of Bme Exhaust Trunking Dia-Main Engine 300 Mm (Nb Post Chemical Cleaning And Pressure Testing (2.5 Kg/Cm2) Material Cost , Undertake Renewal Of Exhuast Compensator Of Both Main Engines Mat Ss Dia 300Mm Service Cost , Undertake Renewal Of Exhuast Compensator Of Both Main Engines Mat Ss Dia 300Mm Material Cost , Renewal Of Muffler Of Both Main Engine Exhaust System As Per S Le ( Press Test At 5 Kg/Cm2) Service Cost , Renewal Of Muffler Of Both Main Engine Exhaust System As Per S Le ( Press Test At 5 Kg/Cm2) Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectify Defective Instrumentation Wiring Indications Switches Alarms Etc Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectifiy Defective Instrumentation Wiring Indications Switches Alarms Etc Material Cost , Painting & Re-Lagging Of Exhaust System Of Both Mes To Be Undertaken ( Paint H.R Aluminium Paint, Lagging Service Cost , Painting & Re-Lagging Of Exhaust System Of Both Mes To Be Undertaken ( Paint H.R Aluminium Paint, Lagging Material Cost , Undertake Complete Rewinding Of Stator And Rotoe Winding Renewal Of Bearings Renewal Of Avr Replacement Of Rotating Rectifier Assembly Renwal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V,3 Ph, 50 Hz Al Ternator (Make -Kirloskar) Service Cost , Undertake Complete Rewinding Of Stator And Rotoe Winding Renewal Of Bearings Renewal Of Avr Replacement Of Rotating Rectifier Assembly Renwal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V,3 Ph, 50 Hz Al Ternator (Make -Kirloskar) Material Cost , Undertake Functional Checks Of Da Local Control Panel Onboard Tug And Replace/ Rectify Defective Instrumentation , Wiring , Indications, Swithces, Alarms Etc Service Cost , Undertake Functional Checks Of Da Local Control Panel Onboard Tug And Replace/ Rectify Defective Instrumentation , Wiring , Indications, Swithces, Alarms Etc Material Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhuast Manifold Of Both Dg Exhaust Trunking Dia - 100 Mm (Nb) Chemical Cleaning And Pressure Testing (2.5 Kg/Cm2) Service Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhuast Manifold Of Both Dg Exhaust Trunking Dia - 100 Mm (Nb) Chemical Cleaning And Pressure Testing (2.5 Kg/Cm2) Material Cost , Renewal Of Exhuast Compensator Of Both Dgs Mat : Ss Dia 100Mm Service Cost , Renewal Of Exhuast Compensator Of Both Dgs Mat : Ss Dia 100Mm Material Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs ( Paint H.R Aluminium Paint, Lagging Material Cerwool Blanket And Fiberglass Cloth Service Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs ( Paint H.R Aluminium Paint, Lagging Material Cerwool Blanket And Fiberglass Cloth Material Cost , Renewal Of Muffler Of Both Dgs Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Service Cost , Renewal Of Muffler Of Both Dgs Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Material Cost , Drain And Flush Thruster Rudder Blades For Oil And Fill With Fresh Oil (Oil Type -Sp150, Qty-1600 Ltr). Service Cost , Drain And Flush Thruster Rudder Blades For Oil And Fill With Fresh Oil (Oil Type -Sp150, Qty-1600 Ltr). Material Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type -Ep140,Qty-40 Ltr/Gear Box) Service Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type -Ep140,Qty-40 Ltr/Gear Box) Material Cost , Carry Out 5000 Hourly Routines For Srp (Voith) System Including Motor And Prove For Optimum Performance. Make - Be, Model - A-40. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Service Cost , Carry Out 5000 Hourly Routines For Srp (Voith) System Including Motor And Prove For Optimum Performance. Make - Be, Model - A-40. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Material Cost , Undertake Cleaning And Pressure Testing Of Srp/Gear Box Lub Oil Coolers Service Cost , Undertake Cleaning And Pressure Testing Of Srp/Gear Box Lub Oil Coolers Material Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timer Motor And Relays Through Oem Authorised Reps. Service Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timer Motor And Relays Through Oem Authorised Reps. Material Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Service Cost. , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Material Cost. , Major Overhaul Of Lub Oil, Fuel Oil Centrifuge, Stripping Pump Along With Motor And Assiociated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Service Cost , Major Overhaul Of Lub Oil, Fuel Oil Centrifuge, Stripping Pump Along With Motor And Assiociated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Material Cost , Seawage Treatment Plant (Stp) Non Operational Overhauling Of Plant And Control Panel To Be Carried Out And System To Proved Onboard Tug Post Fitment Service Cost , Seawage Treatment Plant (Stp) Non Operational Overhauling Of Plant And Control Panel To Be Carried Out And System To Proved Onboard Tug Post Fitment Material Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi Type Thpc 300) Along With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Service Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi Type Thpc 300) Along With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Material Cost , Carry Out Major Overhauling Of Ac Plant Routines To Be Carried Out. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Service Cost , Carry Out Major Overhauling Of Ac Plant Routines To Be Carried Out. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Material Cost , Nr Routine Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers. Renew Bearing If Required. C Clean Internal Surface And Trunking, Grease Filters, Ball Valve Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line (D) Renew Air Filters / Pads. Service Cost , Nr Routine Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers. Renew Bearing If Required. C Clean Internal Surface And Trunking, Grease Filters, Ball Valve Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line (D) Renew Air Filters / Pads. Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Material Cost , Carry Out 4000 Hourly Routine Of Both M/E Through Authorised Oem. Make - Captipiller Model C280. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Service Cost , Carry Out 4000 Hourly Routine Of Both M/E Through Authorised Oem. Make - Captipiller Model C280. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Material Cost , Carry Out Both Dg 5000 Hrly Routine Oem Koel Green Through Authorised Oem/Vendor. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Service Cost , Carry Out Both Dg 5000 Hrly Routine Oem Koel Green Through Authorised Oem/Vendor. All Defective Components / Spares In Auxillaries Associated To Engine To Be Renew / Repaired As Necessary. Test And Trials To Be Undertaken And Proved Material Cost , Overhauling Of Gs Pump/ Fire Pump Along With Motor And Starter (Make Roysons Engineering , Model Rgp 1, Capacity 1 M3/Hr) Pump To Be Proved Onboard For Rated Output Post Fitment Service Cost , Overhauling Of Gs Pump/ Fire Pump Along With Motor And Starter (Make Roysons Engineering , Model Rgp 1, Capacity 1 M3/Hr) Pump To Be Proved Onboard For Rated Output Post Fitment Material Cost , Overhauling Of Fuel Oil, Lub Oil, Dirty Oil Transfer Pump, Main Engine Sea Water,Dot, Sea Water Pump Of Ac And Dg Along With Motor And Starter, Qyt 13 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fuel Oil, Lub Oil, Dirty Oil Transfer Pump, Main Engine Sea Water,Dot, Sea Water Pump Of Ac And Dg Along With Motor And Starter, Qyt 13 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter,(Make Be , Type :Ao3110, Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter,(Make Be , Type :Ao3110, Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type -Ch/Chr/Cv Cp-30 Tph). Service Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type -Ch/Chr/Cv Cp-30 Tph). Material Cost , Sv Mounts Of Air Compressors, Fo Centrifuge, Stp , Me Driven Fire Pump , Srp Cooling Pump, Dot Pump ,Bilge Pump, Gs Pump, Fot Pump Service Cost , Sv Mounts Of Air Compressors, Fo Centrifuge, Stp , Me Driven Fire Pump , Srp Cooling Pump, Dot Pump ,Bilge Pump, Gs Pump, Fot Pump Material Cost , Undertake Removal, Overhauling , Pressure Testing And Refitment Of Air Bottles ( Test Pressure 600 Psi) Pressure Test Certificates Tobe Provided Service Cost , Undertake Removal, Overhauling , Pressure Testing And Refitment Of Air Bottles ( Test Pressure 600 Psi) Pressure Test Certificates Tobe Provided Material Cost , Undertake Overhauling Of Air Bottle Safety Valves (Set Pressure - 32 Kgf/Cm2). Service Cost , Undertake Overhauling Of Air Bottle Safety Valves (Set Pressure - 32 Kgf/Cm2). Material Cost , Undertake Overhauling Of Air Reducing Valve (30 / 12 Kgf/Cm2). Service Cost , Undertake Overhauling Of Air Reducing Valve (30 / 12 Kgf/Cm2). Material Cost , Undertake Overhauling Of Relief Valve On Air Charging Line (Set Limit- 32 Kg/Cm2). Service Cost , Undertake Overhauling Of Relief Valve On Air Charging Line (Set Limit- 32 Kg/Cm2). Material Cost , Undertake Overhauling Of Relief Valve On Air Starting Line Of Me (Set Limit - 15 Kgf/Cm2). Service Cost , Undertake Overhauling Of Relief Valve On Air Starting Line Of Me (Set Limit - 15 Kgf/Cm2). Material Cost , Undertake Overhauling Of Air Stop Valve/ Air System Valve (Mat-Gm), Dia -1.5 Inch). Service Cost , Undertake Overhauling Of Air Stop Valve/ Air System Valve (Mat-Gm), Dia -1.5 Inch). Material Cost , Undertake Overhauling Of Air Bottle Drain Cock (Mat - Gm), Dia - 1.25 Inch). Service Cost , Undertake Overhauling Of Air Bottle Drain Cock (Mat - Gm), Dia - 1.25 Inch). Material Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Service Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Material Cost , Renewal Of All Guage Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Service Cost , Renewal Of All Guage Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Material Cost , Repairs Of All The Base Plate Mounts For Supporting Pressure Gauges And Proper Securing Of Gauges With Screws At Prominent Locations Near The Equipment. Mat -Ms Service Cost , Repairs Of All The Base Plate Mounts For Supporting Pressure Gauges And Proper Securing Of Gauges With Screws At Prominent Locations Near The Equipment. Mat -Ms Material Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment (List Attached At Annnexure 1). Service Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment (List Attached At Annnexure 1). Material Cost , All Temperature Gauges/Cutouts (0-100 C) - 10 Nos (0-200)- 14 Nos Along With Capillarie, End Fittings And Cock To Be Renewed Service Cost , All Temperature Gauges/Cutouts (0-100 C) - 10 Nos (0-200)- 14 Nos Along With Capillarie, End Fittings And Cock To Be Renewed Material Cost , All Sea Water System Pipes (Cu Ni 70/30) Of The Craft Machineries To Be Renwed Along With New Fasteners (Mat For Fasteners Brass) And Rubber Joints. Service Cost , All Sea Water System Pipes (Cu Ni 70/30) Of The Craft Machineries To Be Renwed Along With New Fasteners (Mat For Fasteners Brass) And Rubber Joints. Material Cost , All Lub Oil And Fuel System Pipes (Mat Ms) Of The Tug Machineries To Be Cleaned And Pressure Tested And Fitted Back With New Fasteners (Mat For Fasteners Ss) And Rubber Joints. Service Cost , All Lub Oil And Fuel System Pipes (Mat Ms) Of The Tug Machineries To Be Cleaned And Pressure Tested And Fitted Back With New Fasteners (Mat For Fasteners Ss) And Rubber Joints. Material Cost , Undertake Major Refit Routines (Including Weighing,Calibration,Certification) On Co2 Drenching System As Per Oem Recommended Manual System To Be Proved For Satisfactory Operation Onboard Post Fitment Service Cost , Undertake Major Refit Routines (Including Weighing,Calibration,Certification) On Co2 Drenching System As Per Oem Recommended Manual System To Be Proved For Satisfactory Operation Onboard Post Fitment Service Cost , Undertake Testing And Proving Of Fire Monitor System Onboard Tug,Prove Its Manual And Remote Operations Alongwith Fireman And Foam System Service Cost , Undertake Testing And Proving Of Fire Monitor System Onboard Tug,Prove Its Manual And Remote Operations Alongwith Fireman And Foam System Material Cost , Provide Afff Foam For The Fire Monitor System In The Given Tanks Service Cost , Provide Afff Foam For The Fire Monitor System In The Given Tanks Material Cost , Foam Chemical Tank (Capacity-10000 Ltrs,Size-2.7Mx2.0Mx2.0M) Corroded And Leaking From Various Places, To Be Cleaned. Repaired And Pressure Tested(Pr 1.5 Kg/Cm2) . Service Cost , Foam Chemical Tank (Capacity-10000 Ltrs,Size-2.7Mx2.0Mx2.0M) Corroded And Leaking From Various Places, To Be Cleaned. Repaired And Pressure Tested(Pr 1.5 Kg/Cm2) . Material Cost , Deck Flanges Of Complete Fire Main System Are To Be Renewed Service Cost , Deck Flanges Of Complete Fire Main System Are To Be Renewed Material Cost , Undertake Overhauling Of Fire Main Chest Valves Dia 100Mm Service Cost , Undertake Overhauling Of Fire Main Chest Valves Dia 100Mm Material Cost , Window Wiper System Non Operational Complete System Overhauling To Be Undertaken Service Cost , Window Wiper System Non Operational Complete System Overhauling To Be Undertaken Material Cost , Port & Stbd Supply Blower Trunking To Be Removed Cleaned And Refitted Service Cost , Port & Stbd Supply Blower Trunking To Be Removed Cleaned And Refitted Material Cost , Engine Room Ventilation Trunking To Be Renewed Matl Ms Service Cost , Engine Room Ventilation Trunking To Be Renewed Matl Ms Material Cost , Undertake Checks Of Electrical Siren And Prove Its Operation Service Cost , Undertake Checks Of Electrical Siren And Prove Its Operation Material Cost , Air Operated Siren Not Working Complete System To Be Overhauled And Siren Operation To Be Proved Service Cost , Air Operated Siren Not Working Complete System To Be Overhauled And Siren Operation To Be Proved Material Cost , Ballast Tank And Dirty Oil Hand Pumps To Be Overhauled All Worn Out Parts To Be Renewed And Offer Trials Post Fitment Service Cost , Ballast Tank And Dirty Oil Hand Pumps To Be Overhauled All Worn Out Parts To Be Renewed And Offer Trials Post Fitment Material Cost , Safety Guard For M/E (Both) Starter Manufacturing & Fitment Service Cost , Safety Guard For M/E (Both) Starter Manufacturing & Fitment Material Cost , Engine Foam Emergency Door Not Closing Properly Service Cost , Engine Foam Emergency Door Not Closing Properly Material Cost , Doors Located Near Funnel Leaked Not Closing Properly Service Cost , Doors Located Near Funnel Leaked Not Closing Properly Material Cost , Accomodation & Wheel Have Ac Plant Not Working Service Cost , Accomodation & Wheel Have Ac Plant Not Working Material Cost , Both Voith Propeler System Gauge Not Working Properly And Oil Leaking Service Cost , Both Voith Propeler System Gauge Not Working Properly And Oil Leaking Material Cost , Engine Room Main Door Is Not Open And Close Properly Service Cost , Engine Room Main Door Is Not Open And Close Properly Material Cost , Engine Room All Sensor System Not Working Properly Also Fresh Water, Fuel And Oil Service Cost , Engine Room All Sensor System Not Working Properly Also Fresh Water, Fuel And Oil Material Cost , Bilges P/P Line Chokup Removal Cleaning & Fitment Service Cost , Bilges P/P Line Chokup Removal Cleaning & Fitment Material Cost , Both Engine & Dg Sea Cheast Pipe Line Cleaning Service Cost , Both Engine & Dg Sea Cheast Pipe Line Cleaning Material Cost , Both Main Engine Seawater Discharge Line Leakage So It Should Be Change Service Cost , Both Main Engine Seawater Discharge Line Leakage So It Should Be Change Material Cost , Special Survey With Anyone Of The Indian Navy Approved Classification Society To Be Undertaken W.R.T No 07/25. All Observation/Remark Brought Ot By Classification Society To Be Liqudated And Classification Certificate To Be Issued/ Renewed Service Cost , Special Survey With Anyone Of The Indian Navy Approved Classification Society To Be Undertaken W.R.T No 07/25. All Observation/Remark Brought Ot By Classification Society To Be Liqudated And Classification Certificate To Be Issued/ Renewed Material Cost , Water Tight Hatches Including Emergency Scape Hatch Sillicon Rubber Beading And Tensionised Springs To Be Renewed And Ultrasonic Leak Detector (Uld) Test To Be Proved Renewal Overhauling And Greasing Of Locking Clips To Be Carried Out Service Cost , Water Tight Hatches Including Emergency Scape Hatch Sillicon Rubber Beading And Tensionised Springs To Be Renewed And Ultrasonic Leak Detector (Uld) Test To Be Proved Renewal Overhauling And Greasing Of Locking Clips To Be Carried Out Material Cost , Fresh Water Level Indicator Display Non-Ops Repair/Renewal To Be Carried Out. Service Cost , Fresh Water Level Indicator Display Non-Ops Repair/Renewal To Be Carried Out. Material Cost , Fuel Tank Level Indicator Non-Ops Repair/ Renewal To Be Carried Out Service Cost , Fuel Tank Level Indicator Non-Ops Repair/ Renewal To Be Carried Out Material Cost , Port & Stbd Engine Display Monitor(Ams Display At Ecr & Ups) Non -Operational Repair/Renewal To Be Carried Out .Service Cost , Port & Stbd Engine Display Monitor(Ams Display At Ecr & Ups) Non -Operational Repair/Renewal To Be Carried Out .Material Cost , Galley Supply Fan & Exhaust Blower Not Working Effectively/Air Flow Reduced. Repair/Renewal To Be Carried Out. Service Cost , Galley Supply Fan & Exhaust Blower Not Working Effectively/Air Flow Reduced. Repair/Renewal To Be Carried Out. Material Cost , Mast-2 Lighting (24V & 230V) Repair/ Renewal To Be Carried Out. Service Cost , Mast-2 Lighting (24V & 230V) Repair/ Renewal To Be Carried Out. Material Cost , Toilet Exhaust Blower Non -Operational. Repair/Renewal To Be Carried Out. Service Cost , Toilet Exhaust Blower Non -Operational. Repair/Renewal To Be Carried Out. Material Cost , Tindel Room Accommodation Bed Switch,Socket(Light Assembly Required).Non -Ops Repair/Renewal To Be Carried Out .Service Cost , Tindel Room Accommodation Bed Switch,Socket(Light Assembly Required).Non -Ops Repair/Renewal To Be Carried Out .Material Cost , Sufficient Illumination/100W Led Required In Engine Room .Service Cost , Sufficient Illumination /100W Required In Engine Room .Material Cost , Securing Arrangement To Secure Emergency Light In Passage Area Service Cost , Anchor Windglass Break Not Holding,Suspect Alignment Issues. Repair/Renewal To Be Carried Out. Service Cost , Anchor Windglass Break Not Holding,Suspect Alignment Issues. Repair/Renewal To Be Carried Out. Material Cost , Swictch Socked Found Defective To Be Replaced. Service Cost , Swictch Socked Found Defective To Be Replaced. Material Cost , Repair And Replaced Defective Items,Sensor,Wiring,Alarm,Control Panel,Manual Call Points In Afds System. Post Repairs / Renewal System To Be Proved Service Cost , Repair And Replaced Defective Items,Sensor,Wiring,Alarm,Control Panel,Manual Call Points In Afds System. Post Repairs / Renewal System To Be Proved Material Cost , Fifi System Non Operational Repair/Renewal Of Defected Components To Be Carried Out. Service Cost , Fifi System Non Operational Repair/Renewal Of Defected Components To Be Carried Out. Material Cost , Mccb At Shore Supply Box Not Operational Repair/Renewal To Be Carried Out. Service Cost. , Mccb At Shore Supply Box Not Operational Repair/Renewal To Be Carried Out. Material Cost. , Ams Display Including Ups At Wheel House Defective/Non-Functioning Repair/Renewal To Be Carried Out .Service Cost , Ams Display Including Ups At Wheel House Defective/Non-Functioning Repair/Renewal To Be Carried Out .Material Cost , Shore Supply Breaker At Msb Panel Operating Knob Defective To Be Repaired/Renewed Service Cost , Shore Supply Breaker At Msb Panel Operating Knob Defective To Be Repaired/Renewed Material Cost , Ac Plant In Wheel House Not Working To Be Repaired. Service Cost , Ac Plant In Wheel House Not Working To Be Repaired. Material Cost , Overhauling And Testing/Trials Of Dd Pump To Be Carried Out Service Cost , Overhauling And Testing/Trials Of Dd Pump To Be Carried Out Material Cost , Qc Coverage By Irs. Service Cost
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender