Tender For For Survey, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of New 11/0.4 Kv Sub Station (25/63/100 Kva) Ed Udh Ur Under Ut Capex On Turnkey Basis.(Pddss2526100796)
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Sep 2026
10 days left
EMD
2.63 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Udhampur → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for For Survey, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of New 11/0.4 Kv Sub Station (25/63/100 Kva) Ed Udh Ur Under Ut Capex On Turnkey Basis.(Pddss2526100796)
BOQ
| Sl. No. | Item Description |
| 1 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of 11 KV line for creation of new sub station under the Jurisdiction of Sub Division-I JPDCL Udhampur. |
| 2 | 9 mtr. Long ST Pole (ST-410 SP-33) |
| 3 | GI V Cross -arm with top Bracket including clamps |
| 4 | GI Channel X-arm including clamps and Angle for braces |
| 5 | 30 mm sq. ACSR Weasel conductor |
| 6 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting |
| 7 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 8 | Galvanized Nuts and Bolts |
| 9 | Danger Plates with clamps |
| 10 | Anti Climbing device with clamps |
| 11 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm for LT |
| 12 | Painting on 9 mtr long ST poles with two coat of Aluminium Paint. |
| 13 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 14 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of New Sub Stations under the Jurisdiction of Electric Sub Division-I JPDCL udhampur. |
| 15 | 11/0.433kV, 3-phase 25 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 16 | 11/0.433kV, 3-phase 63 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 17 | 11/0.433kV, 3-phase 100 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 18 | Gapless surge arrestor 9KV, 10KA, LA with polymer housing station type |
| 19 | 11 KV GO, AB Switch 3-phase, 3-pole, 200 Amp. Vertical |
| 20 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 21 | 70 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 22 | 120 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 23 | 9 mtr. Long ST Pole (ST 410 SP-33) |
| 24 | 11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with tension fitting |
| 25 | GI Channel/Angle/Flat of sizes including clamps |
| 26 | Galvanized Nuts and Bolts. |
| 27 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover. |
| 28 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 29 | LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch |
| 30 | LT Distribution Box for 63 KVA with MCCB for incomer and SUF for outgoing circuit |
| 31 | LT Distribution Box for 100 KVA with MCCB for incomer and SUF for outgoing circuit |
| 32 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 33 | PG Clamps |
| 34 | Danger Plates with clamps |
| 35 | GI Barbed Wire for Anti Climbing |
| 36 | Painting of substation ST poles/cross arm/clamps with one coat of Red oxide and two coats of aluminium paint |
| 37 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5 cum per pole |
| 38 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of LT line for creation of new sub stationunder the Jurisdiction of Sub Division-I JPDCL Udhampur. |
| 39 | 8 mtr. Long ST Pole (ST-410 SP-15) |
| 40 | 30 mm sq. ACSR Weasel Conductor |
| 41 | GI M clamps for Shackle Insulator |
| 42 | Shackle Insulator |
| 43 | Galvanized Nuts and Bolts |
| 44 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm |
| 45 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of 11 KV line for creation of new sub station under the Jurisdiction of Sub Division-II JPDCL Udhampur. |
| 46 | 9 mtr. Long ST Pole (ST-410 SP-33) |
| 47 | GI V Cross -arm with top Bracket including clamps |
| 48 | GI Channel X-arm including clamps and Angle for braces |
| 49 | 30 mm sq. ACSR Weasel conductor |
| 50 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 51 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting |
| 52 | Galvanized Nuts and Bolts |
| 53 | Danger Plates with clamps |
| 54 | Anti Climbing device with clamps |
| 55 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm for LT |
| 56 | Painting on 9 mtr long ST poles with two coat of Aluminium Paint. |
| 57 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 58 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of New Sub Stations under the Jurisdiction of Electric Sub Division-II JPDCL udhampur. |
| 59 | 11/0.433kV, 3-phase 25 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 60 | 11/0.433kV, 3-phase 63 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 61 | Gapless surge arrestor 9KV, 10KA, LA with polymer housing station type |
| 62 | 11 KV GO, AB Switch 3-phase, 3-pole, 200 Amp. Vertical |
| 63 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 64 | 70 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 65 | 120 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 66 | 9 mtr. Long ST poles (ST 410 SP-33) |
| 67 | 11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with tension fitting |
| 68 | GI Channel/Angle/Flat of sizes including clamps |
| 69 | Galvanized Nuts and Bolts. |
| 70 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover. |
| 71 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 72 | LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch |
| 73 | LT Distribution Box for 63 KVA with MCCB for incomer and SUF for outgoing circuit |
| 74 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 75 | PG clamps |
| 76 | Danger Plates with clamps |
| 77 | GI Barbed Wire for Anti Climbing |
| 78 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5 cum per pole |
| 79 | Painting of substation ST poles/cross arm/clamps with one coat of Red oxide and two coats of aluminium paint |
| 80 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of LT line for creation of new sub station under the Jurisdiction of Sub Division-II JPDCL Udhampur. |
| 81 | 8 mtr. Long ST Pole (ST-410 SP-15) |
| 82 | GI M clamps for Shackle Insulator |
| 83 | 30 mm sq. ACSR Weasel conductor |
| 84 | Shackle Insulator |
| 85 | Galvanized Nuts and Bolts |
| 86 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm |
| 87 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of 11 KV line for creation of new sub station under the Jurisdiction of Sub Division-Chenani JPDCL Udhampur. |
| 88 | 9 mtr. Long ST Pole (ST-410 SP-33) |
| 89 | GI V Cross -arm with top Bracket including clamps |
| 90 | GI Channel X-arm including clamps and Angle for braces |
| 91 | 30 mm sq. ACSR Weasel conductor |
| 92 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 93 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting |
| 94 | Galvanized Nuts and Bolts |
| 95 | Danger Plates with clamps |
| 96 | Anti Climbing device with clamps |
| 97 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm for LT |
| 98 | Painting on 9 mtr long ST poles with two coat of Aluminium Paint. |
| 99 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 100 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of New Sub Stations under the Jurisdiction of Electric Sub Division JPDCL Chenani |
| 101 | 11/0.433kV, 3-phase 25 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 102 | 11/0.433kV, 3-phase 63 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 103 | Gapless surge arrestor 9KV, 10KA, LA with polymer housing station type |
| 104 | 11 KV GO, AB Switch 3-phase, 3-pole, 200 Amp. Vertical |
| 105 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 106 | 70 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 107 | 120 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 108 | 9 mtr. Long ST Pole (ST 420 SP-33) |
| 109 | 11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with tension fitting |
| 110 | GI Channel/Angle/Flat of sizes including clamps |
| 111 | Galvinized Nuts and Bolts. |
| 112 | PG Clamps |
| 113 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover. |
| 114 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 115 | LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch |
| 116 | LT Distribution Box for 63 KVA with MCCB for incomer and SUF for outgoing circuit |
| 117 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 118 | Danger Plates with clamps |
| 119 | GI Barbed Wire for Anti Climbing |
| 120 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5 cum per pole |
| 121 | Painting of substation ST poles/cross arm/clamps with one coat of Red oxide and two coats of aluminium paint |
| 122 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of LT line for creation of new sub station under the Jurisdiction of Sub Division-Chenani JPDCL Udhampur. |
| 123 | 8 mtr. Long ST Pole (ST-410 SP-15) |
| 124 | GI M clamps for Shackle Insulator |
| 125 | 30 mm sq. ACSR Weasel conductor |
| 126 | Shackle Insulator |
| 127 | Galvanized Nuts and Bolts |
| 128 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm |
| 129 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 130 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of 11 KV line for creation of new sub station under the Jurisdiction of Sub Division JPDCL Ramnagar |
| 131 | 9 mtr. Long ST Pole (ST-410 SP-33) |
| 132 | GI V Cross -arm with top Bracket including clamps |
| 133 | GI Channel X-arm including clamps and Angle for braces |
| 134 | 30 mm sq. ACSR Weasel conductor |
| 135 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 136 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting |
| 137 | Galvanized Nuts and Bolts |
| 138 | Danger Plates with clamps |
| 139 | Anti Climbing device with clamps |
| 140 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm for LT |
| 141 | Painting on 9 mtr long ST poles with two coat of Aluminium Paint. |
| 142 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 143 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of New Sub Stations under the Jurisdiction of Electric Sub Division JPDCL Ramnagar. |
| 144 | 11/0.433kV, 3-phase 25 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 145 | 11/0.433kV, 3-phase 63 KVA Distribution Transformer (To be issued by Department at Divisional Store of ED Udhampur) |
| 146 | Gapless surge arrestor 9KV, 10KA, LA with polymer housing station type |
| 147 | 11 KV GO, AB Switch 3-phase, 3-pole, 200 Amp. Vertical |
| 148 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 149 | 70 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 150 | 120 mm² Single Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type |
| 151 | 9 mtr. Long ST Pole (ST 420 SP-33) |
| 152 | 11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with tension fitting |
| 153 | GI Channel/Angle/Flat of sizes including clamps |
| 154 | Galvinized Nuts and Bolts. |
| 155 | PG Clamps |
| 156 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover. |
| 157 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 158 | LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch |
| 159 | LT Distribution Box for 63 KVA with MCCB for incomer and SUF for outgoing circuit |
| 160 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 161 | Danger Plates with clamps |
| 162 | GI Barbed Wire for Anti Climbing |
| 163 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5 cum per pole |
| 164 | Painting of substation ST poles/cross arm/clamps with one coat of Red oxide and two coats of aluminium paint |
| 165 | Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for erection of LT line for creation of new sub station under the Jurisdiction of Sub Division JPDCL Ramnagar. |
| 166 | 8 mtr. Long ST Pole (ST-410 SP-15) |
| 167 | GI M clamps for Shackle Insulator |
| 168 | 30 mm sq. ACSR Weasel Conductor |
| 169 | Shackle Insulator |
| 170 | Galvanized Nuts and Bolts |
| 171 | Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm for LT |
| 172 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 173 | Supply of 2 ton Chain Block to Divisional Store Udhampur |
| 174 | Supply of Telescopic Ladder 15 ft to Divisional Store Udhampur |
| 175 | Supply of Guy wire (7/14)SWG to Divisional Store Udhampur |
| 176 | Supply of Earthing Spikes 10ft having 20mm holes for fixing nuts and bolts for earthing strips to Divisional Store Udhampur Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysSep 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender