Tender For Subcontracting Of Growth Of Work & Re - Work For Asw Swc Ship Yd 3030
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Sep 2026
1 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Subcontracting Of Growth Of Work & Re - Work For Asw Swc Ship Yd 3030
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: MR. Ashim Kumar Dey, Senior Manager (Contract), GRSE Ltd. Name of Work: SUBCONTRACTING OF GROWTH OF WORK & RE - WORK FOR ASW SWC SHIP YD 3030 E-Tender No.: SCC/AKD/ST/GOW/ REWORK/130/ET- 3519 Dated: 10/09/2026 Name of the Bidder/ Bidding Firm / Company : PRICE BID : ANNEXURE C(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.)NB: (i) AU = Activity Unit, (ii) MND = Man-days. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Job Description Item No. Quantity UOM Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE (PER UNIT) (INR) WITHOUT GST GST PERCENTAGE(%) GST Amount in INR Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies HSN / SAC Code * Name of Supply State / UT DRGS NO. Name of Supply State / UT Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category HSN/ SAC CODE Name of Supply State / UT TOTAL/ SUB-TOTAL Without Tax TOTAL/ SUB-TOTALWith Tax TOTAL AMOUNT without Tax TOTAL AMOUNT With Tax TOTAL AMOUNT In Words |
| 2 | GROWTH OF WORK |
| 3 | Re-alignment of ME w/o breaking TBB choc |
| 4 | Collaring work |
| 5 | Renewal of mechanical seals-FW Pump |
| 6 | Inst. buterfly nuts & purging cocks-ME, DG |
| 7 | Shifting of 3T Davit |
| 8 | Bulwark Modification (MoD) |
| 9 | Re validation of Life Raft |
| 10 | Fab. & Instt. Of Bollard (MoD) |
| 11 | Installation of Cleats & Deck Eyes (MoD) |
| 12 | Paints |
| 13 | Modification of SW line |
| 14 | Modification of Bulkhead bearing |
| 15 | EES and vertical ladders (MoD) |
| 16 | Hiring of 100 KW DG |
| 17 | Hiring of 80 T chiller unit |
| 18 | Replacement of Bullring |
| 19 | Modification of Brows |
| 20 | Fitment of additional lights |
| 21 | Additional transport (1No. car & 2 Nos. b |
| 22 | Drone arrangement for CST visuals |
| 23 | Modification in Fixed Fin |
| 24 | Rigging Warrant items |
| 25 | Docking & undocking charges for hydrofoi |
| 26 | Bus & Car for Ships crew |
| 27 | Cleaning of ASW 2 |
| 28 | Docking & undocking of Solid Ballast |
| 29 | SS observation of ASW |
| 30 | Renewal of Eye Plates |
| 31 | SUB TOTAL |
| 32 | REWORK |
| 33 | Fitting of Triple Roller fairlead |
| 34 | Ship in route in NOVEC Room |
| 35 | Mod. of FWD gangway opening position DK1 |
| 36 | Mod. of Mast fog light foundation in DK1 |
| 37 | Laddering & Railing of Varuna in DK. 03 |
| 38 | Fab. & Erect. of EOD foundation in DK. 03 |
| 39 | H/W drilling & fitting AI soft patch |
| 40 | Trunk Removal in IRL exhaust |
| 41 | Insulation removed-H/W in JS dining hall |
| 42 | 3 Steps aliminium ladder for 3T davit |
| 43 | Bulkwork mod. - Gangway opening FLY 6 |
| 44 | Mod. of LMG & MMG gun |
| 45 | TBR Ramp securing arrangement |
| 46 | Fab. & Erection of MOSUM post - 2 Nos. |
| 47 | Fitment of TTL Plate stanchions pipe |
| 48 | Relocation of RU locker small arm post |
| 49 | Latch arrangement provided for lockers |
| 50 | Cutting & welding of stanchions new & old |
| 51 | Addl. rack batten locking in Paint store |
| 52 | Fab. & Installation - Fisher Plate |
| 53 | Fab. & Inst. Of Ironing table, Elect. switch |
| 54 | Platform fab & instt. Fuse loading operatn |
| 55 | Fitup & Welding of U Ring, U Hook |
| 56 | Scallops inbrd & outbrd Engine griders |
| 57 | Welding & Painting of addl. Eye plates |
| 58 | Removal and reinstallation of AEL |
| 59 | Foundation modification of IPMS Printer |
| 60 | Removal and reinstallation of LIU (2 NOS) |
| 61 | Mod. of ADP Equipment foundation |
| 62 | Mod. of Fixed camera foundation |
| 63 | SPS control Box and Junction box |
| 64 | IAC Mod Box Stbd side Fuse test panel |
| 65 | ME L 40 Primimg Pump control 2 Nos |
| 66 | Mod. of Degaussing cable Tray |
| 67 | P02 -L08, IPMS L 27, IPMS L28, LTL42 |
| 68 | Transformer 30kva for communication |
| 69 | Removal&Re - instt. of panel |
| 70 | EDG exhaust silencer leak |
| 71 | ME IRSS alignment |
| 72 | R/R duplex straier FWD ER SB side |
| 73 | R/R duplex straier FWD ER SB side |
| 74 | R/R duplex straier FWD ER SB side |
| 75 | I/R of Temporary valves in AER, FER, PR |
| 76 | Renewal & balnking argmt. of Shaft Sleeve |
| 77 | Spools mod. of Air vent system |
| 78 | MFF System end connection |
| 79 | Spool mod. of Vacuum System |
| 80 | Modification of Drain line in HE |
| 81 | Modification of Salvage Pipe |
| 82 | Mod. of Air vent pipe in AFT ME RU tank |
| 83 | Pipe Modification of AFT ME SWC |
| 84 | FWD Engine STBD Side ME SW old pipe |
| 85 | FWD Engine PS Side ME SW old pipe |
| 86 | Modification of Salvage Pipe |
| 87 | Alternator Enclosure |
| 88 | Modification of Air escape Pipe |
| 89 | Provision of drainage |
| 90 | Fire hydrant modification in Stbd side |
| 91 | Mod. of Fire main hydraunt fitted EDG |
| 92 | Mod of Waterjet compt. Bilge Educator |
| 93 | Operating handle, Fire main sys cock valv |
| 94 | HVAC duct fouling with pre wetting |
| 95 | Pre wetting spools with HVAC modification |
| 96 | HVAC duct fouling with pre wetting |
| 97 | HVAC duct fouling with pre wetting |
| 98 | Mod. of all the 6 pressure reducing valv |
| 99 | Emrgncy Fire pump exhaust sys drain line |
| 100 | Modification of Prewetting line |
| 101 | Spool Modification in ECTHCA Equipment |
| 102 | 125 NB SDNR vlv removed, changed 150 NB |
| 103 | Spool Modification in FW system |
| 104 | Spool Modification in FW system |
| 105 | Additional elbow to be provided |
| 106 | Fire main spool modification |
| 107 | PI, OBPT&II - Prewetting sys Sprinkler mod |
| 108 | Manifold spool for the drain line |
| 109 | New LP Air from JS dining Hall to Store |
| 110 | Fire line spool modification |
| 111 | Fire line spool modification |
| 112 | Pressure Trnsmtr introduced in 200 Bar |
| 113 | FW shore connection penetration |
| 114 | Prewetting System Nozzle length reduced |
| 115 | Modification of ME SW cooling system |
| 116 | ME SWC butterfly valve spindle extended |
| 117 | ATU drain modification - ATU 4 |
| 118 | ATU drain modification - HE 11 |
| 119 | ATU drain modification- ShipWright WS |
| 120 | ATU drain modification - VICTUALLING |
| 121 | Prewetting Sys Sprinkler location modifi |
| 122 | Prewetting Sys Sprinkler modified-AFT ex |
| 123 | Mod. Of Paint Store prewetting system |
| 124 | GUN Magazine ATU Drain Line |
| 125 | AER LO purifier line |
| 126 | Hydrophore compartment Relief line |
| 127 | Funnel - ME exhaust silencer drain line |
| 128 | Salvage system SDNR valve repair |
| 129 | IRL Trunk doubler plate |
| 130 | Bulkhead bearing housing remov - sensor |
| 131 | FW pump mount renewal |
| 132 | Rack with 4 steps in Degaussing comprtmt |
| 133 | Fabrication & installation of SSD Locker |
| 134 | Fabrication & installation Boat Locker |
| 135 | Fab. & Installation in OBM Tank for RIB |
| 136 | Fabrication & Erection AWD/LRDA Pole |
| 137 | Fire Main spool modification |
| 138 | AER RU tank Airt Vent spool penetration |
| 139 | SUB TOTAL Total in Figures 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 daySep 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender