Tender For Supply, Installation, Testing & Commissioning Of 150 Mt Multi Commodity Cold Storage
Tender Overview
Project Description
Tender for Supply, Installation, Testing & Commissioning Of 150 Mt Multi Commodity Cold Storage , Supply, Installation, Testing & Commissioning Of 150 Mt Multi Commodity Cold Storage Minimum Technical Specification Mentioned In The Bid Document. , Design, Supply, Installation, Testing & Commissioning Of 150 Mt Multi Commodity Cold Storage: General Specifications: General Specifications: • Type: Multi Commodity Cold Storage • Total Capacity: 150 Mt • Number Of Chambers: 1 Nos. • Temperature Range: 0°C To +15°C • Relative Humidity: 85-95% • Refrigerant: R404a / R407c • Power Supply: 380V To 415V, 3 Phase, 50 Hz Puf Insulated Structure: • Wall Panels: Minimum 80 Mm Puf Panels • Ceiling Panels: Minimum 80 Mm Puf Panels • Density: Minimum 40 ± 2 Kg/M³ • Ppgi Sheet Thickness: Minimum 0.5 Mm Both Sides • Floor Insulation: Minimum 80 Mm Xps With Vapor Barrier Chamber Dimensions: • Approx. 10.8 M X 9 M X 6 M • Net Storage Capacity: 150 Mt , Supply Of Installation Accessories For Puf Panels- • All The Required Accessories For Installation Of Puf Panels , Installation Of Puf Panels- • Installation Of Puf Panels Shall Be In The Scope Of Supply. , Refrigeration Compressors: • Type: Supply Hermetic Scroll (Emerson) Compressor Air Cooled Condensing Unit. • Make: Emerson / Tecumesh / Daikin / Blue Cold Or Equivalent • Minimum 2 Working. • Evaporation Temp. -5 Deg. C • Ambient Temp. 43 Deg. C • Cooling Capacity: 16 Kw Each (Suitable For Above Mentioned Cdu) • With Flow Controls: Solenoid Valve, Drier Filter, Sight Gass, Expansion Valve , Air Cooled Condensing Units: • Type: Air Cooled Type • Copper Tube Aluminium Fin Coils , Unit Coolers- • Quantity: 2 Nos. • Capacity: 16 Kw Each • Cooling Capacity: 16 Kw (Suitable For Above Mentioned Cdu) • Make: Blue Cold/Star Cooler/Alfa Luve Or Equivalent • Copper Coil Construction • Electric Defrost Arrangement , Insulated Door: • Supply And Installation Puf Manual Swing Door • Clear Opening: Minimum 1980 X 900 • Door Thickness - Minimum 80 Mm • Make: Metaflex/Gandhi Or Any Equivalent , Plc Based Control Panel: General Specifications: • Plc Based Control Panel • Temperature Monitoring And Logging • Mccb, Mcb, Overload And Phase Protection • Auto Compressor Sequencing • Make: Subzero Or Any Equivalent Safety Features: • Hp/Lp Cut-Outs • Oil Safety Switch • Emergency Stop • Alarm System • Proper Earthing System , Copper Refrigerant Piping With Insulation:- • Copper Refrigerant Piping With Insulation - 19 Mm Thick • Make: Mandev / Maxflow / Hari Om/ Armafles/K Flex Or Any Equivalent , Drainage & Defrost System: • Condensate Water Drain Piping - Pvc Piping , Electrical Wiring & Cabling:- • Electrical Wiring & Cabling - Polycab Or Any Equivalent , Refrigeration System Installation And Commissioning With First Top Up Of Refrigerant- • Refrigeration System Installation And Commissioning With First Top Up Of Refrigerant - Stallion/Honeywell Or Equivalent Make , Voltage Stabilizers For Condensing Units And Unit Coolers- • Suitable Voltage Stabilizers For Condensing Units And Unit Coolers With All Safety Features • Make: Servo Or Any Equivalent , Supply, Installation, Testing & Commissioning: • All The Supply, Loading & Unloading, Erection (If Any), Installation, Testing & Commissioning Of The Machinery Equipment Should Be Included.
BOQ
| Sl. No. | Item Description |
| 1 | Supply, Installation, Testing & Commissioning Of 150 MT Multi Commodity Cold Storage Minimum Technical Specification Mentioned In The Bid Document. |
| 2 | Design, Supply, Installation, Testing & Commissioning of 150 MT Multi Commodity Cold Storage:General Specifications:General Specifications:• Type: Multi Commodity Cold Storage• Total Capacity: 150 MT• Number of Chambers: 1 Nos.• Temperature Range: 0°C to +15°C• Relative Humidity: 85–95%• Refrigerant: R404A / R407C• Power Supply: 380V to 415V, 3 Phase, 50 HzPUF Insulated Structure:• Wall Panels: Minimum 80 mm PUF panels• Ceiling Panels: Minimum 80 mm PUF panels• Density: Minimum 40 ± 2 kg/m³• PPGI Sheet Thickness: Minimum 0.5 mm both sides• Floor Insulation: Minimum 80 mm XPS with vapor barrierChamber Dimensions:• Approx. 10.8 m x 9 m x 6 m • Net storage capacity: 150 MT |
| 3 | Supply of Installation Accessories for PUF Panels-• All the required accessories for installation of PUF Panels |
| 4 | Installation of PUF Panels-• Installation of PUF panels shall be in the scope of supply. |
| 5 | Refrigeration Compressors:• Type: Supply Hermetic Scroll (Emerson) Compressor Air Cooled Condensing Unit.• Make: Emerson / Tecumesh / Daikin / Blue Cold or Equivalent • Minimum 2 Working.• Evaporation Temp. -5 Deg. C• Ambient Temp. 43 Deg. C• Cooling Capacity: 16 KW each (Suitable for above mentioned CDU)• With Flow Controls: Solenoid Valve, Drier Filter, Sight Gass, Expansion Valve |
| 6 | Air Cooled Condensing Units:• Type: Air cooled type• Copper tube Aluminium fin coils |
| 7 | Unit Coolers-• Quantity: 2 Nos.• Capacity: 16 KW each• Cooling Capacity: 16 KW (Suitable for above mentioned CDU)• Make: Blue Cold/Star Cooler/Alfa Luve or Equivalent• Copper coil construction• Electric defrost arrangement |
| 8 | Insulated Door:• Supply and Installation PUF Manual Swing Door• Clear Opening: Minimum 1980 x 900• Door Thickness – Minimum 80 mm• Make: Metaflex/Gandhi or any equivalent |
| 9 | PLC Based Control Panel:General Specifications:• PLC based control panel• Temperature monitoring and logging• MCCB, MCB, overload and phase protection• Auto compressor sequencing• Make: Subzero or any EquivalentSafety Features:• HP/LP cut-outs• Oil safety switch• Emergency stop• Alarm system• Proper earthing system |
| 10 | Copper Refrigerant Piping with Insulation:-• Copper Refrigerant Piping with Insulation - 19 mm thick• Make: Mandev / Maxflow / Hari Om/ Armafles/K Flex or any Equivalent |
| 11 | Drainage & Defrost System:• Condensate Water Drain Piping - PVC Piping |
| 12 | Electrical Wiring & Cabling:-• Electrical Wiring & Cabling – Polycab or any equivalent |
| 13 | Refrigeration System Installation and Commissioning with First Top Up of Refrigerant-• Refrigeration System Installation and Commissioning with First Top Up of Refrigerant - Stallion/Honeywell or Equivalent make |
| 14 | Voltage Stabilizers for Condensing Units and Unit Coolers-• Suitable Voltage Stabilizers for Condensing Units and Unit Coolers with all safety features• Make: Servo or any Equivalent |
| 15 | Supply, Installation, Testing & Commissioning:• All the Supply, Loading & Unloading, Erection (if any), Installation, Testing & Commissioning of the machinery equipment should be included. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender