Tender For Supply Of Men And Machinary Under Flood Mitigation Flash Floods If Any/ For The Year 2026-27 Including Encroachment Drive If Any Carried Out Under The Jurisdiction Of Sub Division Mirbazar (Stage 2Nd) Amount = Rs: 1.50 Lacs
Tender Overview
Project Description
Tender for Supply Of Men And Machinary Under Flood Mitigation Flash Floods If Any/ For The Year 2026-27 Including Encroachment Drive If Any Carried Out Under The Jurisdiction Of Sub Division Mirbazar (Stage 2Nd) Amount = Rs: 1.50 Lacs
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Wet |
| 4 | Slip Clearance |
| 5 | In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 6 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 9 | Hand packing stones in wire crates excluding cost of stones & crates. |
| 10 | Dumping stone excluding cost of stones. in Horizontal on level |
| 11 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 13 | Supply of 4 mm Diameter G.I Wire Woven Crates 4''x4\\" mesh as per ISI Specifications. |
| 14 | Supply of Nallah Stones |
| 15 | Collection of Stones from Different pockets of Nallah upto 500 Mtrs. H.L |
| 16 | Supply of EC bags. |
| 17 | Supply of Polythene |
| 18 | Supplying and stacking at siteGood Earth |
| 19 | Opening out old wire crates those and re-binding after filling. |
| 20 | Hire Charges of Motor for Dewatering including cost of Fuel and All Carriages Complete. |
| 21 | Carriage of stones by an average lead of 08 kms by MT & average lead of 250 mtrs by head load |
| 22 | Carriage of sand by an average lead of 15 kms by MT & average lead of 250 mtrs by head load |
| 23 | Carriage of Aggregates (40 mm) by an average lead of 15 kms by MT & average lead of 250 mtrs by head load |
| 24 | Carriage of Aggregates (20 mm) by an average lead of 15 kms by MT & average lead of 250 mtrs by head load |
| 25 | Carriage of Cement by an average lead of 05 kms by MT & average lead of 250 mtrs by head load |
| 26 | Provision for Supply of Cutters for removal of encroachments including cost of services of operating staff, supply of diesel, lubricating oil and other maintenance charges etc (complete job). |
| 27 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering , lead upto 50 mtrs & lift upto 1.5 mtrs. |
| 28 | Supply of Mechanical Excavator for different spots during flash floods (if any of 2025-26 ) including cost of services of operating staff, including GST, supply of diesel, lubricating oil and other maintenance charges complete job |
| 29 | Poklain |
| 30 | Supply of Labours (Skilled) |
| 31 | Supply of Labours (Un-Skilled) |
| 32 | Supply of Tractors for complete day including cost of services of operating staff, supply of diesel, lubricating oil and other maintenance charges etc (complete job). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender