Power Boards / Undertakings / PSU Closing in 16 days TDR #57443704

Tender For Construction Of Foundation For 33Kv Anei Bay And Related miscellaneous Civil Works At 132Kv S/S Kursato., Varanasi

Issued by Boards / Undertakings / PSU · Prayagraj, Uttar Pradesh
Tender Value
10.95 Lakhs
Estimated cost
Bid Submission
28 Sep 2026
16 days left
EMD
26000
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Foundation For 33Kv Anei Bay And Related miscellaneous Civil Works At 132Kv S/S Kursato., Varanasi

BOQ

Name of Work:- Construction of foundation for 33kv ANEI BAY AND RELATED MISC. CIVIL WORKS at 132kv S/s Kursato., Varanasi
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. (DSR 2.6.1)
2Excavating, supplying, stacking and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.(DSR- 2.25(a))
3Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(DSR- 2.31)
4Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(DSR 2.27)
51:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) :(DSR 4.1.10))
61:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 5.1.2)
7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (DSR 5.22.6)
8Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand). (DSR 6.1.1)
91:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 4.1.2)
10Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (DSR 5.9.1)
11Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DSR 5.9.2)
12Supply and fixing of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (NSI NO. 9.14+9.15)
13Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (NSI NO. 9.15)
14Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (NSI No. 9.30)
15Fixing of Template for auxiliary structure. (NSI NO. 9.32)
16Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only).(NSI No. 9.33)
17Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.. (DSR- 10.2)
18Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (NSI No.11.18)
192.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC. (NSI No. 12.26)
2012 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) (DSR - 13.4.1)
216 mm cement plaster of mix :1:3 (1 cement : 3 fine sand) (DSR-13.16.1)
22Neat cement punning. ROUGH CAST PLASTER (DSR- 13.18)
23Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (NSI No. 13.28)
24Painting two or more coat on iron new work over an under coat sutable shade (DSR- 13.62.1) Please Enable Macros to View BoQ information Special Condition :-
25Tenderers are required to quote their offer as “above / at par / below” in the estimated cost.
26The rates are to be filled up in figures and words both.
27Departmental rates are exclusive of GST.GST will be borne by department as per applicable rules. Labour Cess, Royalty and all other Taxes are liable to be paid by Firm/Contractor.
28In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail.
29Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender.
30Quantities are approximate and may vary up to any extent on either side as per requirement of the site conditions in the direction of Engineer-In-charge or may not be executed at all for which no extra claim shall be entertained.
31All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge.
32The work may be carried in energized s/s area having high voltage installation contractor must employee trained supervisor & labour to work in such electrical/ hazardous area. All risk to men & materials shall be contractor's resposibilitiy
33All risk to men, labour & materials shall be contractor’s responsibility.
34All materials shall be arranged by the contractor’s at his own cost.
35No handling charges of T&P and labour will be paid for extended period of contract, if any.
36Rates quoted by Tenderer will remain firm till completion of scope of work of contract.
37Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ v/khfu;e 1996.
38Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department.
39Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab.
40The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc.
41Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it.
42As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates.
43As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section”
44Security of work will be released after six month from the date of completion of the work if no defect has been found after six month.
45All the civil work carried out in potable water on contractor own cost. No Payment will made by department. However in case of departmental water supply 1.5% deduction will be made from contractor’s bill for water charges for the item which involve water consumption.
46The bill Processing / Payment will be done according to existing UPPTCL Rule of ERP Portal.
47If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm.
48The 60% amount of brick available from dismantaling shall be recovered @ Rs. 3744.00/thousand + GST to Firm/Contractor.
49The 30% amount of brick available from dismantaling shall be recovered as brick bats @ Rs. 1680.00/Cum + GST to Firm/Contractor.
50The amount of Steel available from dismantaling will be recovered @ Rs. 20.00/KG + GST to Firm/Contractor.
51Replaced CP Bib cock/piller cock/brass bib cock shall be recovered @ Rs. 25.00/each + GST to Firm/Contractor.
52Old door and windows, shutter with chaukhat shall be recovered @ Rs. 70.00/Sqm. + GST to Firm/Contractor. SIGNATURE OF TENDERER / AUTHORISED PERSON ALONGWITH SEAL OF THE FIRM Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No…………

AI Tender Summary

OUR REF NO 57443704
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 10.95 Lakhs
LAST DATE 28-09-2026
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender for Construction Of Foundation For 33Kv Anei Bay And Related miscellaneous Civil Works At 132Kv S/S Kursato., Varanasi
Basic Detail
Tender No 37/ECTC,PRG/2026-27
Bidding Type Tender
Location
City Prayagraj
State Uttar Pradesh
Key Dates
Publish Date 10 Sep 2026
Submission Date 28 Sep 2026
Open Date 29 Sep 2026
Finance
Tender Value 10.95 Lakhs
Tender Fee 2360
EMD 26000
Exemption Not Available
Document List
37BOQforAneiBayAt132KurshantoVNS.pdf
63e16b4a-bed1-46e0-8766-d3af699af8e7.html
BOQ_2227886.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Sep 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
pdf

37BOQforAneiBayAt132KurshantoVNS.pdf

html

63e16b4a-bed1-46e0-8766-d3af699af8e7.html

xls

BOQ_2227886.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders