Tender For Construction Of Harriya Semra Pradhanmantri Road To Lohrauli Road
Tender Value
1.50 Crore
Estimated cost
Bid Submission
16 Sep 2026
3 days left
EMD
9.50 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Basti → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Harriya Semra Pradhanmantri Road To Lohrauli Road
BOQ
| Sl. No. | Item Description |
| 1 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 2 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift up to 1.50 m and lead up to 50 m as per Technical Specification clause 302.3.as per Technical specification complete in all aspects or as per direction of E/I . in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 3 | Providing and Laying 12.50/11.00 cm compacted thickness granular sub-base (G.S.B. grade-1) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Speicification Clause 401 including cost of material , roller, cartage ,loading, unloading ,labour and all taxes complete or as per Technial Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 4 | CEMENT TREATED SUBBASE Providing, laying and spreading, Material on a prepared sub grade (GSB) adding cement @ 2% by weight to tbe spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. including cost of material , roller, cartage ,loading, unloading ,labour and all taxes complete or as per Technial Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 5 | CEMENT TREATED BASE WBM Grade-III Providing, laying and spreading Material on a prepared sub base, adding cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the Road roller at OMC to achieve the desired unconifined compressive strength and to form a layer of base. as per Technial Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 6 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 3.00 kg./10 sqm. on the prepared bituminous surface Cleaned with Hydraulic broom as per Technical Specification Clause 503. as per Technical Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 7 | Providing, laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm (Crushed stone chiping 13.2 mm @0.18 cum./10 sqm. & crushed stone chiping 11.2 mm @ 0.09 cum./10 sqm.) aggregates either using penetration grade bitumen or emulsion to required line,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat either Type-C as per technical specification clause 508. By manual means (1) Bitumen(VG-10) @ 14.60 kg. per 10 sqm. as per Technical Specification Complete in all respects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C with 6.7 mm crushed stone chiping @ 0.09 cum/10 sqm as per Technical Specification Clause 510. Bitumen(VG-10) @ 6.5 kg. per 10 sqm. as per Technical specification complete in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 9 | Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 10 | NP3 Hume Pipe Culvert 600 mm Dia- 3 No. Excavation in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. as per Technical Specification Clause 302(II) in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 11 | Cement Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per S.I. NO. 280 with curing in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 12 | First class brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials , labour and T&P etc. required for proper completion of the work .SI No-305 . with curing in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 13 | Struck pointing with cement mortar consisiting of 1 part cement and 2 part fine sand of F.M 1.25 including supply of all materials labour and T&P etc required for proper completion of the work SI No-574 with curing in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 14 | Supply of NP-3 Hume Pipes in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 15 | Laying of NP-3 Hume Pipes in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 16 | Excavation of foundation in ordinary soil (Loam, Clay, or Sand) including 1.5 m lift and lead upto 30 m and including filling watering and ramming of excavated earth as per S.I. No. 251.in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 17 | Cement Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. as per S.I. No. 280 with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 18 | Class 150 A Bricks in 1:4 Cement & coarse sand of 1.25 FM Mortar in F&P I/C all materials labour T&P etc. complete as per required for proper completion of the work as per S.I. No. 305 with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 19 | Same as item No.3 above but in 1:3 cement & C/sand mortar in super structure. As per S.I. No.307 with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 20 | R.C.C. M-20 (1:11/2:3) in slab with Cement, C/sand & 20 mm grit fom approved quarry I/C cost of all materials labour T&P etc complete as required for proper completion of work. As per S.I. No.(284A) with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 21 | R.C.C. work on 1:2:4 with cement , C/sand & 20 mm grit in bed block As per S.I. No.(284 ) with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 22 | C.C. 1:2:4 Wearing coat on slab S.I. No. 279A with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 23 | Placing reinforcement steel bars I/C cost of steel, cutting bending & T&P for proper completion of the work as per S.I. No. 504 in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 24 | Cost of Ist Year Maintenaince @0.00% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 25 | Cost of IInd Year Maintenaince @0.75% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 26 | Cost of IIIrd Year Maintenaince @1.50% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 27 | Cost of IVth Year Maintenaince @2.25% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 28 | Cost of Vth Year Maintenaince @3.00% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysSep 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.