Tender For Construction Of Tiutha Pitch To Kudwa Road
Tender Value
1.18 Crore
Estimated cost
Bid Submission
16 Sep 2026
3 days left
EMD
7.93 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Basti → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Tiutha Pitch To Kudwa Road
BOQ
| Sl. No. | Item Description |
| 1 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 in all aspects or as per direction of E/I in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 2 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift up to 1.50 m and lead up to 50 m as per Technical Specification clause 302.3.as per Technical specification complete in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 3 | Providing and Laying 12.50/11.00 cm compacted thickness granular sub-base (G.S.B. Grade-1) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Speicification Clause 401 including cost of material , roller, cartage ,loading, unloading ,labour and all taxes complete or as per Technial Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 4 | Providing, Laying, spreading and compacting stone aggregates of 53-22.4 mm size material to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone screening grit to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. as per Technial Specification Complete in all aspects or as per direction of E/I. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 5 | Construction of un-reinforced, plain cement concrete pavement with M30 grade concrete, thickness as per design, over a prepared sub base with 43 grade cement as per Clause 1501.2.2, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side framework(steel channel, laying and fixing of 125 micron thick polythene film including levelling the framework as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in a continuous operation including provision of contraction joints, applying curing of concrete slabs for 14-days and water finished to lines and grades as per drawing and MORD specification Clause 1501. in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 6 | Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 7 | NP3 Hume Pipe Culvert 600 mm Dia- 2 No. Excavation in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. as per Technical Specification Clause 302(II) in all aspects or as per direction of E/I . in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 8 | Cement Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per S.I. NO. 280 with curing in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 9 | First class brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials , labour and T&P etc. required for proper completion of the work .SI No-305 .with curing in all aspects or as per direction of E/I (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 10 | Struck pointing with cement mortar consisiting of 1 part cement and 2 part fine sand of F.M 1.25 including supply of all materials labour and T&P etc required for proper completion of the work SI No-574 with curing in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 11 | Supply of NP-3 Hume Pipes in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 12 | Laying of NP-3 Hume Pipes in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 13 | RCC \\"U\\" TYPE DRAIN Earth work in Excavation in trenches for foundation in ordinary soil ramming of bottom and disposal of surplus excavated as per P.W.D. Specification. SOR S.I. No. 251 in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 14 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. SOR S.I. No. 280. in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 15 | Reinforcement Cement Concrete Approved coarse sand and 20mm garuge approved stone grit in the proportion of 1:1.5:3 in R.C.C. Raft foundation and footing with 4 cm gauge approved stone ballast excluding supply of reinforcement and etc. binding but including its fixing and binding the same with 24 B.W.G.I. binding wire and icludingi necessary centering and shuttering etc. and also including supply of all materials , PPC Grade M20 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc required for proper completion of the work Binding wire cost being including in the them. S.I. No. 284 A. with curing in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 16 | Mild steel or Iron work such as reinforced concrete of reinforced brick work (when not included in an over all rates) wrought to wrought to required shape as necessary including bending for proper comletion of hw work and including supply of steel wastage and over lapping & hooks. As Per S.I. No. 504. in all aspects or as per direction of E/I .(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) |
| 17 | Cost of Ist Year Maintenaince @0.00% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 18 | Cost of IInd Year Maintenaince @0.25% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 19 | Cost of IIIrd Year Maintenaince @0.50% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 20 | Cost of IVth Year Maintenaince @0.75% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects |
| 21 | Cost of Vth Year Maintenaince @1.00% as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) with all aspects Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysSep 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.