Tender For Construction And Protection Work Of Chakmirdaho Connectivity Road. Km-1, 2(100) (As Per Mouth)
Tender Value
59.98 Lakhs
Estimated cost
Bid Submission
23 Sep 2026
7 days left
EMD
5 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jaunpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction And Protection Work Of Chakmirdaho Connectivity Road. Km-1, 2(100) (As Per Mouth)
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Embankment with Material Obtained from Right of way:- Construction of embankment with approved material obtained from Right of way with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5I (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 2 | Providing & Laying of compacted thickness of Granular Sub Base( GSB) Grading-I Stone ballast of approved quarry by providing well graded material , specification in uniform layer with motor grader on prepared surface , mixed by mix in place method rotavator at OMC, and compacting with smooth wheel roller to achieve the desireed density , complete as per technical specification Clause 401as per direction of E/l (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 3 | Providing laying spreading and compacting (22.4-53mm) stone aggregate of specific sizes to Water bound Mcadam specification including spreading in uniform thichness hand packing, rolling with 3-wheel 80-100 kN static roller in stages to proper grade and camber to 7.50 cm compacted thickness applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical Specification. Clause 405. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 4 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from Right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1..(Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 6 | PART AMaintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 |
| 7 | 1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 8 | 2nd year- maintainance cost 0.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 9 | 3rd year- maintainance cost 0.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 10 | 4th year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 11 | 5th year- maintainance cost 1.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 23, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysSep 23, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender