Tender For Construction Of Bnk Road Baraipurwa To Sirsiya Chaube Link Road
Tender Value
1.72 Crore
Estimated cost
Bid Submission
16 Sep 2026
0 days left
EMD
10.61 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Basti → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Bnk Road Baraipurwa To Sirsiya Chaube Link Road
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not not exceding 0.50 mt. in depth and work in embankmet to be n 20 cm. layers includding ramming and dressing the surface to required level and slope and also including 1.5 mt. lift and 30 mt. lead as per SL. No.253 detailed specification & direction of E/I. for Embankment work. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects |
| 2 | Construction of granular sub-base by providing Shankargarh material, spreading in uniform layers with motor grader on prepared surface and compacting in two layers at OMC with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects |
| 3 | Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type - B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects |
| 5 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not not exceding 0.50 mt. in depth and work in embankmet to be n 20 cm. layers includding ramming and dressing the surface to required level and slope and also including 1.5 mt. lift and 30 mt. lead as per SL. No.253 detailed specification & direction of E/I. for Making Shoulders. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects |
| 6 | Excavation of Foundation in ordinary soil including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the plinthincluding supply of all labour, T&P etc required for proper completion of work as per Sl No. 251 (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) |
| 7 | Concrete with 4 cm gauge brick ballast, fine sand of 1.25 fineness modulus and cement in the proportion 8:4:1 in foundations and under floors including supply of all materials labour and tools and plants etc required for the proper completion of work with proper curing as per Sl. No. 275. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) |
| 8 | Class 150 brick work in 1:6 cement and fine sand of 1.25 finencess modulous mortar in foundation and plinth. Including supply of all materials labour and T&P etc. required for proper completion of work with proper curing As per Sl. No. 303 (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) |
| 9 | Class 150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth. Including supply of all materials labour and T&P etc. required for proper completion of work with proper curing As per Sl. No. 305(a+b) (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) |
| 10 | Supply of NP - 3 Class 900 mm Dia RCC Hume pipe as per direction of Engineer in Charge. complete in all respects (Rate are Excluding G.S.T but Including All Taxes, ,Labour Cass, Royality, Labour, Material & T&P.) |
| 11 | Laying and jointing with Cement morter 1:2 R.C.C hume pipe dia 900mm ang giving proper slope & alignment as required for proper completion of work. complete in all respects (Rate are Excluding G.S.T but Including All Taxes, Labour Cass, Royality, Labour, Material & T&P.) |
| 12 | Struck pointing with 1:2 cement and fine sand with proper curing As per SI. NO. 574 (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) |
| 13 | Five Year maintenance of road (undulation, pot holes/ patch repair)including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert and all road shinage etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date. including cost of material T&P labour cess, etc. Ist Year @ 0%, 2nd Year @ 0.25% |
| 14 | 3rd Year @ 0.50% |
| 15 | 4th Year @ 0.75% |
| 16 | 5th Year @ 1.00% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodaySep 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender