Tender For New Construction Of Vikash Khand Ghughuli In R Ur Baldiha To Bishunpur Gabadua Partawal Puraina Mukya Link Road Under Cmgsy Yojana, Year 2026-27 In District Mahrajganj, (With 5 Year Maintenance) Lot No 11/15
Tender Value
2.48 Crore
Estimated cost
Bid Submission
15 Sep 2026
2 days left
EMD
14.44 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Maharajganj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Of Vikash Khand Ghughuli In R Ur Baldiha To Bishunpur Gabadua Partawal Puraina Mukya Link Road Under Cmgsy Yojana, Year 2026-27 In District Mahrajganj, (With 5 Year Maintenance) Lot No 11/15
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5, MORD Sr. No. 3.4 (Including labour cess but GST will be paid extra as applicable) |
| 2 | Cement Treated Sub base / Providing, laying and spreading Material on a prepared sub grade, adding OPC Cement @ 2% by weight to the spread material, maunually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base / Quantity of cement as 2 percent of quantity by weight for subbase. As per MORD Sr. No. 4B.1 (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 3 | Cement Treated Base / Providing, laying, spreading on a prepared sub base, OPC Cement @ 4% by weight to the spread material, maunually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base / Quantity of cement as 4 percent of quantity by weight for base course. As per MORD Sr. No. 4B.2 (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 4 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom, as per MORD Sr. No. 5.2 and Technical Specification Clause 503(ii) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 5 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates ( two third 13.2 mm and one third 11.2mm grit) either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C. As per MORD Sr.No. 5.9 and Technical Specification 508. Case - I By Manual Means (I) Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 6 | Seal Coat - Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C. As per MORD Sr.No. 5.12 By Manual Case-III-Type c(I) and Technical Specification & Sr. 510 A Case (iii). By Manual Means Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) |
| 7 | Construction of Subgrade and Earthen Shoulders/Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1(B), MORD Sr. No. 3.14. (Including labour cess but GST will be paid extra as applicable) |
| 8 | Excavation for StructuresEarthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per directed by the engineer-in-charge, As per SOR Sr. No. 251 (Including labour cess but GST will be paid extra as applicable) |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202, 1203, 800 & 1200(I)(i) / I. P.C.C grade M 10 / (i) Nominal mix 1:3:6, MORD Sr. No. 11.4. ( Mechanical mix) (Including labour cess but GST will be paid extra as applicable) |
| 10 | Bedding for Pipe / (ii) Type B (First Class) Bedding / Laying (First Class) bedding on well compacted GSB or approved granular material as per Clause 1105 (ii) / Rate as per Item No.11.2 of Chapter 11. As per MORD Sr. No. 9.2(ii) (Including Labour Cess & Roylty but GST will be paid extra as applicable) |
| 11 | Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109, 1100 & 600(A) / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11, MORD Sr. No. 9.10 (Including labour cess but GST will be paid extra as applicable) |
| 12 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar/spigot & Socketed type joint, confirming to BIS specification as per IS 458:2003 with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. As per directed by the engineer-in-charge. As per SOR Sr. No. 9.3, 1100 D, 900 mm dia (NP-3) (Including labour cess but GST will be paid extra as applicable) |
| 13 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3, 600 / Rate as per item No.12.2 of Chapter 12, MORD Sub analsis Cement mortar 1:3 (1 cement : 3 sand) 11.5 (i)600 & 1200 (Including labour cess but GST will be paid extra as applicable) |
| 14 | For Road Work- Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 7 Rs. 22033347.00 @ Zero percent & for 2nd year @ 0.75% |
| 15 | 3rd Year cost of @ 1.50 % Item No. (1 to 7) |
| 16 | 4rth Year cost of @ 2.25% Item No. (1 to 7) |
| 17 | 5th Year cost of @ 3.00 % Item No. (1 to 7) |
| 18 | For HP Culvert- Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 8 to 8.05 Rs. 291803.98 1st year Maintenance cost @ Zero percent & for 2nd year @ 0.25% |
| 19 | 3 rd Year cost of @ 0.50 % Item No. (8 to 8.05) |
| 20 | 4 rd Year cost of @ 0.75 % Item No. (8 to 8.05) |
| 21 | 5 rd Year cost of @ 1.00 % Item No. (8 to 8.05) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysSep 15, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender