Power Government Departments Closing in 5 days TDR #57431743

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing And Maintenance Of Damage Line/Pole Works Under Edd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 8.5 Mtrs. Long Pcc Pol

Issued by Government Departments · Etawah, Uttar Pradesh
Tender Value
20.58 Lakhs
Estimated cost
Bid Submission
24 Sep 2026
5 days left
EMD
20580
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Etawah → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing And Maintenance Of Damage Line/Pole Works Under Edd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 8.5 Mtrs. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of 11 Mtrs. Long St Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 11 Kv X-Arms, G.I Wire,Disc Insulators, Pin Insulators, Cl S And Other Required For Lt/11Kv Line, If Any Form Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Acsr Weasel Conductor From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Weasel Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Galvanised Including The Work Of Nozzling Etc. As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Guarding Of Ht/Lt 11 Kv Line With Gi Wire As Per Respo Norms. Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Sagging, Stringing/Binding And Jumpering Of Old Line As Per Direction Of Executive Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Nuzzling Of Old Stay Set By Opening Old Binding For Better Straightening Of Pole And Re-Sag The Existing Conductor Of H.T/L.T Line Properly As Per Direction Of Executive Engineer. , Straightening Of Pcc/St Pole Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour,T&P Charges Required For Proper Completion Of Work. , Chopping Of Tree Branches To Clear The Line Route To Give Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. , Replacement & Re-Installation & Fixing Of Following Damaged Accessories. Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Lt Shackle Insulator , Top Channel , 11 Kv Polymer Disc Insulator (T&C) 45 Kn , 11 Kv Pin Insulator With Pin , 11 Kv Steel Cross Arm V-Type , Lt Pin Cl For 8.5 Mtr Long Pcc Pole , 11 Kv F Cl For 8.5 Mtr Long Pcc Pole , 11 Kv Cross Arm Cl For 8.5 Mtr Long Pcc Pole , Disc Fitting (B&S) 70 Kn , 11 Kv Dp Cl , Received Back Of Old Scrap Pole/Material/Cable From Pit Site To Je Store/Store Center Etawah Including Loading & Unloading And Proper Stacking.

BOQ

Sl. No. Item TitleItem Description
1Carriage of 8.5 Mtrs. long PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of 8.5 Mtrs. long PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
2Carriage of 11 Mtrs. long ST pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of 11 Mtrs. long ST pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
3Carriage of Line Materials i.e. 11 KV X-Arms, G.I wire,Disc Insulators, Pin insulators, clamps and other required for LT/11KV line, if any form Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of Line Materials i.e. 11 KV X-Arms, G.I wire,Disc Insulators, Pin insulators, clamps and other required for LT/11KV line, if any form Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
4Carriage of ACSR Weasel Conductor from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of ACSR Weasel Conductor from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
5Erection and grouting of Single support by PCC/ST Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO norms. The support shall be grouted in cement, sand and brick ballast in ratio 1:4:8 . It including the cost of all labour, T&P etc. required for proper completion of work.Erection and grouting of Single support by PCC/ST Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO norms. The support shall be grouted in cement, sand and brick ballast in ratio 1:4:8 . It including the cost of all labour, T&P etc. required for proper completion of work.
6Erection and grouting of Double support by PCC/ST Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO norms. The support shall be grouted in cement, sand and brick ballast in ratio 1:4:8 . It including the cost of all labour, T&P etc. required for proper completion of work.Erection and grouting of Double support by PCC/ST Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO norms. The support shall be grouted in cement, sand and brick ballast in ratio 1:4:8 . It including the cost of all labour, T&P etc. required for proper completion of work.
7Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
8Erection and grouting of stay set galvanised including the work of nozzling etc. as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.Erection and grouting of stay set galvanised including the work of nozzling etc. as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
9Guarding of HT/LT 11 Kv Line with GI wire as per RESPO Norms. including the cost of arrangement of labour, T&P etc required for proper completion of work.Guarding of HT/LT 11 Kv Line with GI wire as per RESPO Norms. including the cost of arrangement of labour, T&P etc required for proper completion of work.
10Re-sagging, stringing/Binding and Jumpering of Old Line as per direction of Executive engineer. It includes the cost of labour, T&P etc required for proper completion of work.Re-sagging, stringing/Binding and Jumpering of Old Line as per direction of Executive engineer. It includes the cost of labour, T&P etc required for proper completion of work.
11Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of Executive engineer.Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of Executive engineer.
12Straightening of PCC/ST Pole tilted pole at various places by straightening of pole including the cost of labour,T&P charges required for proper completion of work.Straightening of PCC/ST Pole tilted pole at various places by straightening of pole including the cost of labour,T&P charges required for proper completion of work.
13Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.
14Replacement & Re-Installation & Fixing of following damaged accessories. including the cost of labour, T&P and carrier etc. required for proper completion of work.Replacement & Re-Installation & Fixing of following damaged accessories. including the cost of labour, T&P and carrier etc. required for proper completion of work.
15LT Shackle InsulatorLT Shackle Insulator
16Top ChannelTop Channel
1711 Kv Polymer Disc Insulator (T&C) 45 KN11 Kv Polymer Disc Insulator (T&C) 45 KN
1811 Kv Pin Insulator with Pin11 Kv Pin Insulator with Pin
1911 Kv Steel Cross Arm V-Type11 Kv Steel Cross Arm V-Type
20LT Pin Clamp for 8.5 Mtr Long Pcc PoleLT Pin Clamp for 8.5 Mtr Long Pcc Pole
2111 Kv F Clamp for 8.5 Mtr Long Pcc Pole11 Kv F Clamp for 8.5 Mtr Long Pcc Pole
2211 Kv Cross Arm Clamp for 8.5 Mtr Long Pcc Pole11 Kv Cross Arm Clamp for 8.5 Mtr Long Pcc Pole
23Disc Fitting (B&S) 70 KNDisc Fitting (B&S) 70 KN
2411 Kv DP Clamp11 Kv DP Clamp
25Received Back of old scrap Pole/material/Cable from pit site to JE store/store center Etawah including loading & unloading and proper stacking.Received Back of old scrap Pole/material/Cable from pit site to JE store/store center Etawah including loading & unloading and proper stacking.

AI Tender Summary

OUR REF NO 57431743
AUTHORITY Government Departments
TENDER VALUE 20.58 Lakhs
LAST DATE 24-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing And Maintenance Of Damage Line/Pole Works Under Edd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 8.5 Mtrs. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of 11 Mtrs. Long St Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 11 Kv X-Arms, G.I Wire,Disc Insulators, Pin Insulators, Cl S And Other Required For Lt/11Kv Line, If Any Form Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Acsr Weasel Conductor From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends By Using Manual Labour Or Tractor/Hydra As Per Site Requirment Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Support By Pcc/St Pole Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Norms. The Support Shall Be Grouted In Cement, Sand And Brick Ballast In Ratio 1:4:8 . It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Weasel Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Galvanised Including The Work Of Nozzling Etc. As Per Resspo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Guarding Of Ht/Lt 11 Kv Line With Gi Wire As Per Respo Norms. Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Sagging, Stringing/Binding And Jumpering Of Old Line As Per Direction Of Executive Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Nuzzling Of Old Stay Set By Opening Old Binding For Better Straightening Of Pole And Re-Sag The Existing Conductor Of H.T/L.T Line Properly As Per Direction Of Executive Engineer. , Straightening Of Pcc/St Pole Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour,T&P Charges Required For Proper Completion Of Work. , Chopping Of Tree Branches To Clear The Line Route To Give Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. , Replacement & Re-Installation & Fixing Of Following Damaged Accessories. Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Lt Shackle Insulator , Top Channel , 11 Kv Polymer Disc Insulator (T&C) 45 Kn , 11 Kv Pin Insulator With Pin , 11 Kv Steel Cross Arm V-Type , Lt Pin Cl For 8.5 Mtr Long Pcc Pole , 11 Kv F Cl For 8.5 Mtr Long Pcc Pole , 11 Kv Cross Arm Cl For 8.5 Mtr Long Pcc Pole , Disc Fitting (B&S) 70 Kn , 11 Kv Dp Cl , Received Back Of Old Scrap Pole/Material/Cable From Pit Site To Je Store/Store Center Etawah Including Loading & Unloading And Proper Stacking.
Basic Detail
Tender No GEM/2026/B/8018100
Bidding Type Tender
Location
City Etawah
State Uttar Pradesh
Key Dates
Publish Date 09 Sep 2026
Submission Date 24 Sep 2026
Open Date 25 Sep 2026
Finance
Tender Value 20.58 Lakhs
Tender Fee Ref. Documents
EMD 20580
Exemption Not Available
Document List
a6af198d-7aef-4e07-a454-45bb9d7a425e.pdf
1788954889.xlsx
1788954918.pdf
1788954925.pdf
1788954929.pdf
1788954932.pdf
ATC_5681830b-3511-4799-865d1788955030868_EDCETAWAHSE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Sep 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

a6af198d-7aef-4e07-a454-45bb9d7a425e.pdf

xlsx

1788954889.xlsx

pdf

1788954918.pdf

pdf

1788954925.pdf

pdf

1788954929.pdf

pdf

1788954932.pdf

pdf

ATC_5681830b-3511-4799-865d1788955030868_EDCETAWAHSE.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders