Power Government Departments Closing in 5 days TDR #57431742

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Edd, Saifai; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of

Issued by Government Departments · Etawah, Uttar Pradesh
Tender Value
29.05 Lakhs
Estimated cost
Bid Submission
24 Sep 2026
5 days left
EMD
29050
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Etawah → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Edd, Saifai; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Dog Conductor , Acsr Weasel Conductor , Arial Bunched Conductor Sutaible Size , Digging, Laying And Back Filling Of 11 Kv Xlpe Sutaible Size Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Cl S As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , Filling Of 11 Kv Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type For Sutaible Size For Compeletion Of Work. Including Cable Hoisting Jumfering Work Etc. , Carriage From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Etawah And Mounting Of Following Capacity Transformer On The Single Pole/Double Pole/Plinth Structures With Connections Thereof. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 16 Kva Single/Three Phase Transformer , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , Safe Carriage Of 11 Kv Ct/Pt Pole Unit And Its Proper Installation On Double Pole After Fixing Of Channel With M.S. Cl S And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Sutaible Size Finally Connected To Earthing Rod. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo/Ae(M). , Safe Carriage Of 11 Kv Ct/Pt Cubicle Meter From Store Center Kunera Etawah To Site Of Work And Its Proper Installation At Pit Side As Per Norms. , Neutral & Body Earthing Of Distribution Transformer As Per Norms. , Fixing Of Following Materials/Accesoories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , Top Channel , T-Off Channel , Nut & Bolt , Dropper Channel , Ms T/F Base Angle , 11 Kv Cross Arm V Type/Holding Cl , 11 Kv Fuse Set , Suspension Cl , Distribution Box Single/Three Phase , Distribution Box Cl Single/Three Phase , Dp Cl , Dead End Cl , Eye-Hook , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. It Includes The Cost O F Labour T&P Carriage Etc Required For Proper Completion.

BOQ

Sl. No. Item TitleItem Description
1Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
211 Mtr. Long STP-55 Pole11 Mtr. Long STP-55 Pole
38.5 Mtr. Long PCC Pole8.5 Mtr. Long PCC Pole
4Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
5Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.
6Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.
7Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost).Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost).
8Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.
9Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
10Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
11ACSR Dog ConductorACSR Dog Conductor
12ACSR Weasel ConductorACSR Weasel Conductor
13Arial Bunched Conductor sutaible sizeArial Bunched Conductor sutaible size
14Digging, laying and back filling of 11 KV XLPE sutaible size including the cost of cable hoisting and making loops/HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.Digging, laying and back filling of 11 KV XLPE sutaible size including the cost of cable hoisting and making loops/HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
15Filling of 11 KV Heat Shrinkable Jointing Kit (Indoor/ outdoor) type for sutaible size for compeletion of work. Including cable hoisting jumfering work etc.Filling of 11 KV Heat Shrinkable Jointing Kit (Indoor/ outdoor) type for sutaible size for compeletion of work. Including cable hoisting jumfering work etc.
16Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
1716 KVA Single/Three Phase Transformer16 KVA Single/Three Phase Transformer
1825 KVA Transformer25 KVA Transformer
1963 KVA Transformer63 KVA Transformer
20100 KVA Transformer100 KVA Transformer
21Safe carriage of 11 KV CT/PT Pole Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M).Safe carriage of 11 KV CT/PT Pole Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M).
22Safe carriage of 11 KV CT/PT Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms.Safe carriage of 11 KV CT/PT Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms.
23Neutral & body Earthing Of Distribution Transformer as per Norms.Neutral & body Earthing Of Distribution Transformer as per Norms.
24Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.
2511 KV Pin insulator with pin11 KV Pin insulator with pin
2611 KV Disc Insulator with fitting11 KV Disc Insulator with fitting
27Top ChannelTop Channel
28T-Off ChannelT-Off Channel
29Nut & BoltNut & Bolt
30Dropper ChannelDropper Channel
31MS T/F Base AngleMS T/F Base Angle
3211 KV Cross Arm V type/Holding Clamp11 KV Cross Arm V type/Holding Clamp
3311 KV Fuse set11 KV Fuse set
34Suspension ClampSuspension Clamp
35Distribution Box Single/Three PhaseDistribution Box Single/Three Phase
36Distribution Box Clamp Single/Three PhaseDistribution Box Clamp Single/Three Phase
37DP ClampDP Clamp
38Dead End ClampDead End Clamp
39Eye-HookEye-Hook
40Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.

AI Tender Summary

OUR REF NO 57431742
AUTHORITY Government Departments
TENDER VALUE 29.05 Lakhs
LAST DATE 24-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Edd, Saifai; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Dog Conductor , Acsr Weasel Conductor , Arial Bunched Conductor Sutaible Size , Digging, Laying And Back Filling Of 11 Kv Xlpe Sutaible Size Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Cl S As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , Filling Of 11 Kv Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type For Sutaible Size For Compeletion Of Work. Including Cable Hoisting Jumfering Work Etc. , Carriage From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Etawah And Mounting Of Following Capacity Transformer On The Single Pole/Double Pole/Plinth Structures With Connections Thereof. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 16 Kva Single/Three Phase Transformer , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , Safe Carriage Of 11 Kv Ct/Pt Pole Unit And Its Proper Installation On Double Pole After Fixing Of Channel With M.S. Cl S And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Sutaible Size Finally Connected To Earthing Rod. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo/Ae(M). , Safe Carriage Of 11 Kv Ct/Pt Cubicle Meter From Store Center Kunera Etawah To Site Of Work And Its Proper Installation At Pit Side As Per Norms. , Neutral & Body Earthing Of Distribution Transformer As Per Norms. , Fixing Of Following Materials/Accesoories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , Top Channel , T-Off Channel , Nut & Bolt , Dropper Channel , Ms T/F Base Angle , 11 Kv Cross Arm V Type/Holding Cl , 11 Kv Fuse Set , Suspension Cl , Distribution Box Single/Three Phase , Distribution Box Cl Single/Three Phase , Dp Cl , Dead End Cl , Eye-Hook , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. It Includes The Cost O F Labour T&P Carriage Etc Required For Proper Completion.
Basic Detail
Tender No GEM/2026/B/8018019
Bidding Type Tender
Location
City Etawah
State Uttar Pradesh
Key Dates
Publish Date 09 Sep 2026
Submission Date 24 Sep 2026
Open Date 25 Sep 2026
Finance
Tender Value 29.05 Lakhs
Tender Fee Ref. Documents
EMD 29050
Exemption Not Available
Document List
f2bbe871-59ac-4541-9122-0e68fc89ff80.pdf
1788954317.xlsx
1788954336.pdf
1788954339.pdf
1788954343.pdf
1788954347.pdf
ATC_bdc093e3-6cea-457a-96f01788954433855_EDCETAWAHSE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Sep 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

f2bbe871-59ac-4541-9122-0e68fc89ff80.pdf

xlsx

1788954317.xlsx

pdf

1788954336.pdf

pdf

1788954339.pdf

pdf

1788954343.pdf

pdf

1788954347.pdf

pdf

ATC_bdc093e3-6cea-457a-96f01788954433855_EDCETAWAHSE.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders