Power Government Departments Closing in 5 days TDR #57431730

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of

Issued by Government Departments · Etawah, Uttar Pradesh
Tender Value
15 Lakhs
Estimated cost
Bid Submission
24 Sep 2026
5 days left
EMD
15000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Etawah → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor , Lt Abc (1X25+1X16) Sqmm , Lt Abc (3X50+1X35+1X16) Sqmm , Digging, Laying And Back Filling Of 11 Kv Xlpe Cable 3X70 Sqmm Including The Cost Of Cable Hoisting And Making Loops/ Hdpe Pipe/Cl S As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , Filling Of 11 Kv 3X70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type Including Cable Hoisting Jumfering Work Etc. , Carriage From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah And Mounting Of Following Capacity Transformer On The Single Pole/Double Pole/Plinth Structures With Connections Thereof. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , Safe Carriage Of 11 Kv Ct/Pt Pole Mounted Unit And Its Proper Installation On Double Pole After Fixing Of Channel With M.S. Cl S And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Sutaible Size Finally Connected To Earthing Rod. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo/Ae(M). , Safe Carriage Of 11 Kv Ct/Pt Pilfer Proof Cubicle Meter From Store Center Kunera Etawah To Site Of Work And Its Proper Installation At Pit Side As Per Norms. , Chemical Pipe Earthing Of Distribution Transformer As Per Norms. , Fixing Of Following Materials/Accesoories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator Fitting With Pin , 11 Kv Disc Insulator With Fitting , F-Braket , Top Channel , Nut & Bolt , Dropper Channel , Cl S With Nut & Bolt , Ms T/F Base Angle , T-Off Channel , 11 Kv X Arm V Type , 11 Kv Fuse Set , Suspension Cl , Single Phase Distribution Box , Single Phase Distribution Box Cl (Ls) , Three Phase Distribution Box , Three Phase Distribution Box Cl , Pg Cl , Dead End Cl , Eye-Hook , J-Hook , Neutral Cum Earth Wire , Extra For Stay At Angle Location , Guarding Angle , Gi Wire 8 & 10 Swg. , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. It Includes The Cost O F Labour T&P Carriage Etc Required For Proper Completion.

BOQ

Sl. No. Item TitleItem Description
1Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
211 Mtr. Long STP-55 Pole11 Mtr. Long STP-55 Pole
38.5 Mtr. Long PCC Pole8.5 Mtr. Long PCC Pole
4Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
5Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.
6Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work.
7Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost).Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost).
8Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.
9Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
10Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
11ACSR Weasel ConductorACSR Weasel Conductor
12LT ABC (1x25+1x16) SqmmLT ABC (1x25+1x16) Sqmm
13LT ABC (3x50+1x35+1x16) SqmmLT ABC (3x50+1x35+1x16) Sqmm
14Digging, laying and back filling of 11 Kv XLPE Cable 3x70 Sqmm including the cost of cable hoisting and making loops/ HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.Digging, laying and back filling of 11 Kv XLPE Cable 3x70 Sqmm including the cost of cable hoisting and making loops/ HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
15Filling of 11 KV 3x70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ outdoor) type including cable hoisting jumfering work etc.Filling of 11 KV 3x70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ outdoor) type including cable hoisting jumfering work etc.
16Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
1725 KVA Transformer25 KVA Transformer
1863 KVA Transformer63 KVA Transformer
19100 KVA Transformer100 KVA Transformer
20Safe carriage of 11 KV CT/PT Pole Mounted Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M).Safe carriage of 11 KV CT/PT Pole Mounted Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M).
21Safe carriage of 11 KV CT/PT Pilfer Proof Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms.Safe carriage of 11 KV CT/PT Pilfer Proof Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms.
22Chemical Pipe Earthing Of Distribution Transformer as per Norms.Chemical Pipe Earthing Of Distribution Transformer as per Norms.
23Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.
2411 KV Pin insulator fitting with pin11 KV Pin insulator fitting with pin
2511 KV Disc Insulator with fitting11 KV Disc Insulator with fitting
26F-BraketF-Braket
27Top ChannelTop Channel
28Nut & BoltNut & Bolt
29Dropper ChannelDropper Channel
30Clamps with Nut & BoltClamps with Nut & Bolt
31MS T/F Base AngleMS T/F Base Angle
32T-Off ChannelT-Off Channel
3311 KV X Arm V type11 KV X Arm V type
3411 KV Fuse set11 KV Fuse set
35Suspension ClampSuspension Clamp
36Single Phase Distribution BoxSingle Phase Distribution Box
37Single Phase Distribution Box Clamp (LS)Single Phase Distribution Box Clamp (LS)
38Three Phase Distribution BoxThree Phase Distribution Box
39Three Phase Distribution Box ClampThree Phase Distribution Box Clamp
40PG ClampPG Clamp
41Dead End ClampDead End Clamp
42Eye-HookEye-Hook
43J-HookJ-Hook
44Neutral cum earth wireNeutral cum earth wire
45Extra for stay at angle locationExtra for stay at angle location
46Guarding AngleGuarding Angle
47GI Wire 8 & 10 Swg.GI Wire 8 & 10 Swg.
48Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.

AI Tender Summary

OUR REF NO 57431730
AUTHORITY Government Departments
TENDER VALUE 15 Lakhs
LAST DATE 24-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor , Lt Abc (1X25+1X16) Sqmm , Lt Abc (3X50+1X35+1X16) Sqmm , Digging, Laying And Back Filling Of 11 Kv Xlpe Cable 3X70 Sqmm Including The Cost Of Cable Hoisting And Making Loops/ Hdpe Pipe/Cl S As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , Filling Of 11 Kv 3X70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type Including Cable Hoisting Jumfering Work Etc. , Carriage From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah And Mounting Of Following Capacity Transformer On The Single Pole/Double Pole/Plinth Structures With Connections Thereof. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , Safe Carriage Of 11 Kv Ct/Pt Pole Mounted Unit And Its Proper Installation On Double Pole After Fixing Of Channel With M.S. Cl S And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Sutaible Size Finally Connected To Earthing Rod. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo/Ae(M). , Safe Carriage Of 11 Kv Ct/Pt Pilfer Proof Cubicle Meter From Store Center Kunera Etawah To Site Of Work And Its Proper Installation At Pit Side As Per Norms. , Chemical Pipe Earthing Of Distribution Transformer As Per Norms. , Fixing Of Following Materials/Accesoories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator Fitting With Pin , 11 Kv Disc Insulator With Fitting , F-Braket , Top Channel , Nut & Bolt , Dropper Channel , Cl S With Nut & Bolt , Ms T/F Base Angle , T-Off Channel , 11 Kv X Arm V Type , 11 Kv Fuse Set , Suspension Cl , Single Phase Distribution Box , Single Phase Distribution Box Cl (Ls) , Three Phase Distribution Box , Three Phase Distribution Box Cl , Pg Cl , Dead End Cl , Eye-Hook , J-Hook , Neutral Cum Earth Wire , Extra For Stay At Angle Location , Guarding Angle , Gi Wire 8 & 10 Swg. , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. It Includes The Cost O F Labour T&P Carriage Etc Required For Proper Completion.
Basic Detail
Tender No GEM/2026/B/8017795
Bidding Type Tender
Location
City Etawah
State Uttar Pradesh
Key Dates
Publish Date 09 Sep 2026
Submission Date 24 Sep 2026
Open Date 25 Sep 2026
Finance
Tender Value 15 Lakhs
Tender Fee Ref. Documents
EMD 15000
Exemption Not Available
Document List
65b63a35-dadf-4564-96ce-1c3a0ce69f3b.pdf
1788953031.xlsx
1788953040.pdf
1788953044.pdf
1788953048.pdf
1788953052.pdf
ATC_919f49fb-49ad-46d8-980b1788953229964_EDCETAWAHSE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Sep 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

65b63a35-dadf-4564-96ce-1c3a0ce69f3b.pdf

xlsx

1788953031.xlsx

pdf

1788953040.pdf

pdf

1788953044.pdf

pdf

1788953048.pdf

pdf

1788953052.pdf