Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Cl S, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor , Lt Abc (1X25+1X16) Sqmm , Lt Abc (3X50+1X35+1X16) Sqmm , Digging, Laying And Back Filling Of 11 Kv Xlpe Cable 3X70 Sqmm Including The Cost Of Cable Hoisting And Making Loops/ Hdpe Pipe/Cl S As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. Required For Proper Completion Of The Work. , Filling Of 11 Kv 3X70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type Including Cable Hoisting Jumfering Work Etc. , Carriage From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah And Mounting Of Following Capacity Transformer On The Single Pole/Double Pole/Plinth Structures With Connections Thereof. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 25 Kva Transformer , 63 Kva Transformer , 100 Kva Transformer , Safe Carriage Of 11 Kv Ct/Pt Pole Mounted Unit And Its Proper Installation On Double Pole After Fixing Of Channel With M.S. Cl S And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Sutaible Size Finally Connected To Earthing Rod. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo/Ae(M). , Safe Carriage Of 11 Kv Ct/Pt Pilfer Proof Cubicle Meter From Store Center Kunera Etawah To Site Of Work And Its Proper Installation At Pit Side As Per Norms. , Chemical Pipe Earthing Of Distribution Transformer As Per Norms. , Fixing Of Following Materials/Accesoories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator Fitting With Pin , 11 Kv Disc Insulator With Fitting , F-Braket , Top Channel , Nut & Bolt , Dropper Channel , Cl S With Nut & Bolt , Ms T/F Base Angle , T-Off Channel , 11 Kv X Arm V Type , 11 Kv Fuse Set , Suspension Cl , Single Phase Distribution Box , Single Phase Distribution Box Cl (Ls) , Three Phase Distribution Box , Three Phase Distribution Box Cl , Pg Cl , Dead End Cl , Eye-Hook , J-Hook , Neutral Cum Earth Wire , Extra For Stay At Angle Location , Guarding Angle , Gi Wire 8 & 10 Swg. , Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. It Includes The Cost O F Labour T&P Carriage Etc Required For Proper Completion.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Carriage of following Poles from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 2 | 11 Mtr. Long STP-55 Pole | 11 Mtr. Long STP-55 Pole |
| 3 | 8.5 Mtr. Long PCC Pole | 8.5 Mtr. Long PCC Pole |
| 4 | Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Carriage of line materials i.e. Cable, G.I. wire,TPMO, stay rod, pin/disc insulator, 11 kv cross arm, fuse set, Angle, channel earth wire, distribution box's, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any. Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 5 | Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work. | Erection of Single Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work. |
| 6 | Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work. | Erection of Double Pole Structure by 8.5/11 Mtr. long PCC/ST poles, including fixing complete HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. It including the cost of all labour, T&P etc. required for proper completion of work. |
| 7 | Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost). | Grouting of 8.5/11 Mtr. long PCC/ST poles, duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. (all labour, T&P, grouting material etc arrenged by Contractor on his own cost). |
| 8 | Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works. | Installation of stay set with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works. |
| 9 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 10 | Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Carriage and Laying, sagging stringing and binding of following Conductor on the erected PCC/ST Poles including jumpering of 11 KV/HT/LT lines as per RESSPO manual and as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 11 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 12 | LT ABC (1x25+1x16) Sqmm | LT ABC (1x25+1x16) Sqmm |
| 13 | LT ABC (3x50+1x35+1x16) Sqmm | LT ABC (3x50+1x35+1x16) Sqmm |
| 14 | Digging, laying and back filling of 11 Kv XLPE Cable 3x70 Sqmm including the cost of cable hoisting and making loops/ HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work. | Digging, laying and back filling of 11 Kv XLPE Cable 3x70 Sqmm including the cost of cable hoisting and making loops/ HDPE pipe/clamps as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work. |
| 15 | Filling of 11 KV 3x70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ outdoor) type including cable hoisting jumfering work etc. | Filling of 11 KV 3x70 Sqmm Heat Shrinkable Jointing Kit (Indoor/ outdoor) type including cable hoisting jumfering work etc. |
| 16 | Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Carriage from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah and Mounting of following capacity transformer on the Single Pole/Double pole/Plinth structures with connections thereof. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 17 | 25 KVA Transformer | 25 KVA Transformer |
| 18 | 63 KVA Transformer | 63 KVA Transformer |
| 19 | 100 KVA Transformer | 100 KVA Transformer |
| 20 | Safe carriage of 11 KV CT/PT Pole Mounted Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). | Safe carriage of 11 KV CT/PT Pole Mounted Unit and its proper Installation on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). |
| 21 | Safe carriage of 11 KV CT/PT Pilfer Proof Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms. | Safe carriage of 11 KV CT/PT Pilfer Proof Cubicle Meter from Store Center Kunera Etawah to site of work and its proper Installation at pit side as per Norms. |
| 22 | Chemical Pipe Earthing Of Distribution Transformer as per Norms. | Chemical Pipe Earthing Of Distribution Transformer as per Norms. |
| 23 | Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work. | Fixing of following materials/accesoories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work. |
| 24 | 11 KV Pin insulator fitting with pin | 11 KV Pin insulator fitting with pin |
| 25 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 26 | F-Braket | F-Braket |
| 27 | Top Channel | Top Channel |
| 28 | Nut & Bolt | Nut & Bolt |
| 29 | Dropper Channel | Dropper Channel |
| 30 | Clamps with Nut & Bolt | Clamps with Nut & Bolt |
| 31 | MS T/F Base Angle | MS T/F Base Angle |
| 32 | T-Off Channel | T-Off Channel |
| 33 | 11 KV X Arm V type | 11 KV X Arm V type |
| 34 | 11 KV Fuse set | 11 KV Fuse set |
| 35 | Suspension Clamp | Suspension Clamp |
| 36 | Single Phase Distribution Box | Single Phase Distribution Box |
| 37 | Single Phase Distribution Box Clamp (LS) | Single Phase Distribution Box Clamp (LS) |
| 38 | Three Phase Distribution Box | Three Phase Distribution Box |
| 39 | Three Phase Distribution Box Clamp | Three Phase Distribution Box Clamp |
| 40 | PG Clamp | PG Clamp |
| 41 | Dead End Clamp | Dead End Clamp |
| 42 | Eye-Hook | Eye-Hook |
| 43 | J-Hook | J-Hook |
| 44 | Neutral cum earth wire | Neutral cum earth wire |
| 45 | Extra for stay at angle location | Extra for stay at angle location |
| 46 | Guarding Angle | Guarding Angle |
| 47 | GI Wire 8 & 10 Swg. | GI Wire 8 & 10 Swg. |
| 48 | Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion. | Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender