Bids Are invited for Custom Bid For Services - ---- - Supply Of Following Matarial As Per Relevent Iss , Stone Pad , Holding Cl , T Off Channel , Red Oxide Paint , Aluminium Paint , M/S Nut & Bolt , Suspension Cl , Dead End Cl , I Hook , Pearcing Con
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Supply Of Following Matarial As Per Relevent Iss , Stone Pad , Holding Cl , T Off Channel , Red Oxide Paint , Aluminium Paint , M/S Nut & Bolt , Suspension Cl , Dead End Cl , I Hook , Pearcing Connector , Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , Pcc Pole 8.5 Mtr. Long , Stp Pole 9/11 Mtr. Long , M.S Top Channel 125X65x2240 Mm , Ms Dropper Channel 100X50x2028 Mm , Ms Angle T/F Base With Cl And Nut,Bolt , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , Fuse Set , Earthing Complete , Stay Set Complete , 25 Kva 11/0.4 Kv T/F , 63/100 Kva 11/0.4 Kv T/F , Acsr Weasel Conductor , 11 Kv Cross Arm , Lt Xlpe/Pvc Cable 3.5X70 Sqmm 4X25 Sqmm , Lt Abc Cable 3X50/95/120+1X95+1X16 Sqmm , 11 Kv Tpmo With Polymer Insualator , Lt Fuse Set Protection Unit For 25 Kva Dt With Smc Box , Distribution Box 1/3 Phase , Errection Of Following Poles With Grouting Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Double Pole Complete Fitting Of Pcc Pole , Pcc Pole 8.5 Mtr. Long , Stp Pole 9/11 Mtr. Long , Fixing/ Errection Of Following Item, Cost Of Labor, Material And T&P Which Required For Completion Of Work , Stone Pad , Holding Cl , T Off Channel , Distribution Box 1/3 Phase , Pearcing Connector , Red Oxide Paint , Aluminium Paint , Barbed Wire , Danger Board , Lt Fuse Set Protection Unit For 25 Kva Dt With Smc Box , M/S Nut & Bolt , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , Fuse Set , 11 Kv Tpmo With Polymer Insualator , Suspension Cl , Dead End Cl , I Hook , Number Plate , 11 Kv Cross Arm , Installation Of 10/16/25 Kva 11/0.4/.25 Kv T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making Ht/Lt Connection. , Installation Of 63/100 Kva 11/0.4 Kv T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making Ht/Lt Connection. , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor/Gi In 11 Kv/Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasel Conductor , Lt Xlpe/Pvc Cable 3.5X70 Sqmm 4X25 Sqmm , Lt Abc Cable 3X50/95/120+1X95+1X16 Sqmm , Cutting Chopping, Trimming Of Tree Branches To Clear The Line Rout To Give Two Meter Horizontal And Verticle Clearance To The Line Coming In The Rout Of Different Feeders As Per Direction Of Supervising Engineer.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply of Following Matarial as per relevent ISS | Supply of Following Matarial as per relevent ISS |
| 2 | Stone Pad | Stone Pad |
| 3 | Holding Clamp | Holding Clamp |
| 4 | T OFF CHANNEL | T OFF CHANNEL |
| 5 | Red Oxide Paint | Red Oxide Paint |
| 6 | Aluminium Paint | Aluminium Paint |
| 7 | M/s Nut & Bolt | M/s Nut & Bolt |
| 8 | Suspension Clamp | Suspension Clamp |
| 9 | Dead End Clamp | Dead End Clamp |
| 10 | I Hook | I Hook |
| 11 | PEARCING CONNECTOR | PEARCING CONNECTOR |
| 12 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 13 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 14 | STP Pole 9/11 Mtr. Long | STP Pole 9/11 Mtr. Long |
| 15 | M.s Top Channel 125x65x2240 mm | M.s Top Channel 125x65x2240 mm |
| 16 | MS Dropper Channel 100x50x2028 mm | MS Dropper Channel 100x50x2028 mm |
| 17 | MS Angle T/F base With Clamp and nut,bolt | MS Angle T/F base With Clamp and nut,bolt |
| 18 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 19 | 11 KV Disc Insulator With Fitting | 11 KV Disc Insulator With Fitting |
| 20 | Fuse Set | Fuse Set |
| 21 | Earthing Complete | Earthing Complete |
| 22 | Stay set Complete | Stay set Complete |
| 23 | 25 KVA 11/0.4 KV T/F | 25 KVA 11/0.4 KV T/F |
| 24 | 63/100 KVA 11/0.4 KV T/F | 63/100 KVA 11/0.4 KV T/F |
| 25 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 26 | 11 KV CROSS ARM | 11 KV CROSS ARM |
| 27 | LT XLPE/PVC Cable 3.5x70 Sqmm 4X25 SQMM | LT XLPE/PVC Cable 3.5x70 Sqmm 4X25 SQMM |
| 28 | LT ABC Cable 3x50/95/120+1x95+1x16 sqmm | LT ABC Cable 3x50/95/120+1x95+1x16 sqmm |
| 29 | 11 KV TPMO with Polymer Insualator | 11 KV TPMO with Polymer Insualator |
| 30 | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box |
| 31 | DISTRIBUTION BOX 1/3 PHASE | DISTRIBUTION BOX 1/3 PHASE |
| 32 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 33 | Double pole complete fitting of PCC pole | Double pole complete fitting of PCC pole |
| 34 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 35 | STP Pole 9/11 Mtr. Long | STP Pole 9/11 Mtr. Long |
| 36 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
| 37 | Stone Pad | Stone Pad |
| 38 | Holding Clamp | Holding Clamp |
| 39 | T OFF CHANNEL | T OFF CHANNEL |
| 40 | DISTRIBUTION BOX 1/3 PHASE | DISTRIBUTION BOX 1/3 PHASE |
| 41 | PEARCING CONNECTOR | PEARCING CONNECTOR |
| 42 | Red Oxide Paint | Red Oxide Paint |
| 43 | Aluminium Paint | Aluminium Paint |
| 44 | Barbed Wire | Barbed Wire |
| 45 | Danger Board | Danger Board |
| 46 | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box |
| 47 | M/s Nut & Bolt | M/s Nut & Bolt |
| 48 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 49 | 11 KV Disc Insulator With Fitting | 11 KV Disc Insulator With Fitting |
| 50 | Fuse Set | Fuse Set |
| 51 | 11 KV TPMO with Polymer Insualator | 11 KV TPMO with Polymer Insualator |
| 52 | Suspension Clamp | Suspension Clamp |
| 53 | Dead End Clamp | Dead End Clamp |
| 54 | I Hook | I Hook |
| 55 | Number Plate | Number Plate |
| 56 | 11 KV CROSS ARM | 11 KV CROSS ARM |
| 57 | Installation of 10/16/25 KVA 11/0.4/.25 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. | Installation of 10/16/25 KVA 11/0.4/.25 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. |
| 58 | Installation of 63/100 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. | Installation of 63/100 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. |
| 59 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 60 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 61 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor/GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor/GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. |
| 62 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 63 | LT XLPE/PVC Cable 3.5x70 Sqmm 4X25 SQMM | LT XLPE/PVC Cable 3.5x70 Sqmm 4X25 SQMM |
| 64 | LT ABC Cable 3x50/95/120+1x95+1x16 sqmm | LT ABC Cable 3x50/95/120+1x95+1x16 sqmm |
| 65 | Cutting chopping, Trimming of tree branches to clear the line rout to give two meter horizontal and verticle clearance to the line coming in the rout of different feeders as per direction of supervising engineer. | Cutting chopping, Trimming of tree branches to clear the line rout to give two meter horizontal and verticle clearance to the line coming in the rout of different feeders as per direction of supervising engineer. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender