Housing Urban and Rular Development Government Departments Closing in 11 days TDR #57429040

Tender For The Construction, Maintenance, And Dismantling Of The Approach Road To The Bharadwaj Pontoon Bridge For The Magh Mela 2026-27.

Issued by Government Departments · Prayagraj, Uttar Pradesh
Tender Value
55 Lakhs
Estimated cost
Bid Submission
21 Sep 2026
11 days left
EMD
4.75 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For The Construction, Maintenance, And Dismantling Of The Approach Road To The Bharadwaj Pontoon Bridge For The Magh Mela 2026-27.

BOQ

Name of Work:- माघ मेला 2026-27 हेतु भारद्वाज पाण्टून पुल, पहॅुच मार्ग का निर्माण, रख-रखाव एवं डिस्मेन्टलिंग आदि का कार्य।
Sl. No. Item Description
1Leveling and Dressing of road surface (4 cm deep) including cutting/filling including labour, T&P etc., complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
2Earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and slope as per level given at site including cost of all labour and T&P etc. dressing & disposal of earth by head load on spoil bank of river on shore as directed by the E/I. etc. required for proper completion of work.Excluding royalty & GST.
3Earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and slope as per level given at site including cost of all labour and T&P etc. dressing & disposal of earth by head load on spoil bank of river on shore but for one lift extra for Kagar cutting/Filling complete in all respect as per direction of Engineer-in-Charge. etc. required for proper completion of work.Excluding royalty & GST.
4Carriage and laying of R.S.Joist including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge. (Excluding GST)
5Carriage and laying of Railing Post including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge..(Excluding GST)
6Carriage and laying of Sal Sleeper including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge. (Excluding GST)
7Carriage and laying of Sal Edging including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge. (Excluding GST)
8Carriage and laying of Iron Anchor including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge. Excluding GST.
9Cartage, laying of Chequered plate from Kanihar store to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST.
10Cartage, laying of Other material such as washer, M.S plate, wire rope & Nut Bolts etc. from Kanihar store to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. (Excluding GST)
11Carriage and laying of Pontoon including loading, unloading, cost of carriage from Kanihar store complete in all respect as per direction of engineer incharge. (Exluding GST)
12Supply and laying of wooden anchor for UP stream of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 70 nos Sand filled cement bag & also Including anchoring with ISI mark PP rope (28 mm dia) all matrial labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (This item will applied only on minimum 30 cm water depth in river.) Exluding GST. (as per analysis)
13Supply and laying of wooden anchor for down stream of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 70 Sand Filled cement bag & also Including anchoring with / 18 mm PP Rope) all matrial labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (This item will applied only on minimum 30 cm water depth in river .) Exluding GST. (as per analysis)
14Supply and fixing of mallahi nails of approved quality 15-30 cm. long including its cost, carriage, loading, unloading and stacking at site etc. complete in all respect as per direction of Engineer-in-Charge.
15Supply of empty cement bags of good condition (plastic) filled with local sand including filling, stitching , stacking at site of work including cost of all material, labour, carriage, T&P etc. and placing as per direction of Engineer-in-Charge. (Excluding GST)
16Construction of Pile culvert (Labour only) complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
17Dragging the pontoon from dry bed on the river bank to river water and making pair and anchoring them in down stream side of pantoon bridge for proper completion of the work as per direction of Engineer-in-Charge. (Excluding GST)
18Carriage of pontoons pairs from the place of anchoring (down stream side of the bridge) to the bridge alignment in water and fixing the same with other pontoons pair of bridge including labour T&P etc. proper completion of the work as per direction of Engineer-in-Charge. (Excluding GST)
19Additional haulage of Pontoon in River (per km) complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
20During carriying the pantoon pair from place of anchoring (D/S side of bridge) in water then to cross the dry bed/shallow water on the way upto the alignment, disconnecting pantoon pair and rolling the pantoon and fixing in the alignmentcomplete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
21Sinking of Pontoons to obtain the proper gradient as laid in dry bed by digging earth including all labour T&P etc. proper completion of the work as per direction of Engineer-in-charge. (Excluding GST)
22Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with help of 300X16 mm size nut & bolt at 1.25 mtr center to center including complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
23Two coat painting of railing post including paint and labour etc. complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
24Fixing of railing wire (10 mm) through hole of railing post and hole of vertical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (Labour only) complete in all respect as direction of Engineer-in-Charge. (Excluding GST)
25Carrying and spreading of Kansa poola 5 cm thick over bridge road way before filling of 7.5 cm thick Kapsa soil including cartage of Kapsa soil from a distance of 1.00 Km. On either side of bridge & spreading ramming and dressing the surface complete in all respect as per direction of Engineer-in-Charge. for proper completion of work. (Excluding GST)
26Supply and Laying of local sand including cartage (beyond 5 km) digging, loading, unloading, stacking etc. complete in non sandy area complete in all respect as per direction of Engineer-in-Charge.(Excluding GST)
27Relaying of chaquered plate after making camber by spreading of local sand including cost of all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge (Excluding GST)
28Making stay on both side of pontoon bridge with the help of 20 mm / 10 mm wire rope (Labour only) complete in all respect as per direction of Engineer-in-Charge.(Excluding GST).
29Butt Jointing of chequered plate with M.S. Plate with nut bolt (65mmx12mm/ 45mmx12mm) including nut bolt, washer, labour & T&P etc but excluding MS Plate. complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
30Cartage & Fixing of man hole cover in pontoon as per direction of Engineer-in-charge.(Excluding GST)
31Making barrier on both sides of bridge head with ballies as per direction of Engineer-in-charge.(labour rate only)
32Making hole 14 mm dia in new chequered plate. Including labour T&P etc. complete in all respect as per direction of Engineer-in-Charge.
33Supply and Fixing of wooden crate of eucalyptus balli 2.80x1.80x1.80 mtr side made of 8 cm balli including cost of labour, T&P & material complete in all respect as per direction of Engineer-in-Charge (Excluding GST)
34Bundaling with the help 10 cm horizontal ballies and 15 cm vertical ballies @ 50 cm c/c ballie and fixing below 1.0 to 3.0 mtr of water level and palcing sand filled bags upto 30 cm above water level complete in all respect as per direction of Engineer-in-Charge. Excluding GST.
35Small boat with Mallah for Inspection of Pantoon complete in all respect as per direction of Engineer-in-Charge. Excluding GST.
36Daldal treatment with carted sand upto 5Km, including Labour , T&P complete in all respect as per direction of Engineer-in-Charge. Excluding GST.
37Daldal treatment with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
38Maintenance of Pontoon bridge including pile on either side from start to end of Magh Mela day-night (including tightening of nuts, bolts of pontoons & railing posts, repair of Kansa Poola and Kapsa soil, maintenance of Chequered plates, watering of way of Pontoon bridge and supervision of nut, bolts of Pontoons and fixing of nut, bolts removing damaged nut blots and tightening of ropes and watch and ward of camp and Pontoon bridge and other work) as per direction of Engineer-in-Charge. (Excluding GST)
39Maintenance of Chequered Plate road (3 Row) complete in all respect as per direction of Engineer-in-Charge. Excluding watering (Excluding GST)(only Labour part)
40Maintenance of Chequered Plate road (6 Row) complete in all respect as per direction of Engineer-in-Charge. Excluding watering.(Excluding GST) (only Labour part)
41Extraction of 10 mm wire rope from railing post and making role complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
42Declamping of the M.S.plate and Nut Bolt from chequered plate (labour rates only) complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
43Opening out man hole covers including loading, unloading, cartage & stacking in store at Jhunsi complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
44Dismetanling and carriage of R.S.Joist including loading, unloading, cost of carriage from site to Kanihar store complete in all respect as per direction of engineer incharge (Excluding GST)
45Dismetanling and carriage of Railing Post including loading, unloading, cost of carriage from site to Kanihar store complete in all respect as per direction of engineer incharge.(Excluding GST)
46Dismetanling and carriage of Sal Sleeper including loading, unloading, cost of carriage from site to Kanihar store complete in all respect as per direction of engineer incharge. (Excluding GST)
47Dismantling of Sal edging of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar store and also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (Excluding GST)
48Dismetanling and carriage of Iron Anchor including loading, unloading, cost of carriage from site to Kanihar store complete in all respect as per direction of engineer incharge. (Excluding GST)
49Dismantling of Chequered plate of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar store and also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (Excluding GST)
50Cartage of different materials after dismentalling such as nut & bolt wire rope, P.P. rope etc, from mela area to store at Kanihar. including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.(Excluding GST)
51Cartage of pontoons by Truck / Trailor after dismantalling from bridge site to Kanihar Store including disconnecting the pontoons lying in dry bed / shallow water, rolling and haulage upto river bank. Loading, unloading with the help of crane, labour, T&P etc complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
52Cartage of pontoons by Truck / Trailor after dismantalling from bridge site to Kanihar Store including haulage of the pontoons upto river bank, disconnecting the pontoons Loading, unloading with the help of crane, labour, T&P etc. complete in all respect as per direction of Engineer-in-Charge. (Excluding GST)
53Baricading with 100 mm 120 mm balli in 3 rows (Labour rate only) complete in all respect as per direction of Engineer-in-Charge.
54Two coat Painting of raling post (for wooden Balli) including paint and labour etc. complete in all respect as per direction of Engineer-in-Charge.
55Providing binding wire and it's fixing (for MS jaali) including cost of material, loading, unloading & cartage upto the site, complete in all respect as per direction of Engineer-in-Charge.
56Supply of Nariyal rope for barricading work etc. complete in all respect as per direction of Engineer-in-Charge.
57Cartage of ballies from store to site of work including loading unloading etc. complete in all respect as per direction of Engineer-in-Charge.
58Cartage of ballies from site to store after completion of work including loading unloading etc. complete in all respect as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57429040
AUTHORITY Government Departments
TENDER VALUE 55 Lakhs
LAST DATE 21-09-2026
Authority
Authority Name Public Works Department
Work Description Tender For The Construction, Maintenance, And Dismantling Of The Approach Road To The Bharadwaj Pontoon Bridge For The Magh Mela 2026-27.
Basic Detail
Tender No 5254/10 KAAM A-PRJ CIR/2026 DT 14.08.2026
Bidding Type Tender
Location
City Prayagraj
State Uttar Pradesh
Key Dates
Publish Date 08 Sep 2026
Submission Date 21 Sep 2026
Open Date 21 Sep 2026
Finance
Tender Value 55 Lakhs
Tender Fee 2714
EMD 4.75 Lakhs
Exemption Not Available
Document List
af76816c-40b6-4d05-9642-95a3577a5219.html
BOQ_2226224.xls
Tendernotice_1 (75).pdf
Tendernotice_2 (16).pdf
Tendernotice_3 (3).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Sep 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
html

af76816c-40b6-4d05-9642-95a3577a5219.html

xls

BOQ_2226224.xls

pdf

Tendernotice_1 (75).pdf

pdf

Tendernotice_2 (16).pdf

pdf

Tendernotice_3 (3).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders