Tender For Selection Of Mine Developer And Operator For Exploration, Planning, Development And Operation Of Tangardihi North Coal Block Located In Sundargarh District Of Odisha State.
Tender Overview
Project Description
Tender for Selection Of Mine Developer And Operator For Exploration, Planning, Development And Operation Of Tangardihi North Coal Block Located In Sundargarh District Of Odisha State.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Sep-2026 | Geological Report | Technical Bid | 23-Oct-2026 |
| 2 | 22-Oct-2026 | Time Extension Notice | Date | 23-Nov-2026 |
| 3 | 23-Sep-2026 | Geological Report | Technical Bid | 23-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Charges towards Phase-I activities: |
| 2 | Civil survey & DGPS survey for demarcating block boundary and erecting boundary pillars and site survey for contouring. |
| 3 | Detailed Exploration & Drilling of about 14,000 (subject to a variation of ±20% of the total meterage) , Geophysical logging & analysis etc. with preparation of Geological Report (GR) and approval thereof |
| 4 | Geo-technical investigation, Slope stability study and Preparation of reports thereof. |
| 5 | Hydro-geological investigation & pumping test and preparation of reports thereof. |
| 6 | Preparation of Mining & Mine Closure Plan and approval thereof. |
| 7 | Preparation Detailed Project Report. |
| 8 | Total Charges towards Phase-IActivities |
| 9 | Charges towards Phase-II activities: |
| 10 | Base Mining Charge (Rs. per Tonne of Coal):Base Mining charge including all activities for commencement of Coal production and carrying out entire mining activities for Development and Operation of the Mines, Transportation and Dispatch of Coal, Mine Closure Activities including Cost of Power & Diesel as per detailed Scope of work stipulated for MDO in the Tender Document.The Base Mining charge will also include the following : • EIA-EMP study,• Land use pattern study,• SIA study ,• Any other study as required,• Forestry Stage-I and Stage-II, • Environmental Clearance, • Mining Lease , • Airport Authority of India Clearance, • Consent to Establish ,• Consent to Operate • Any other clearance/ approval / permission requiredNotes:(All Statutory remittances/fees for obtaining all Clearances shall be paid by OCPL) (All clearances/ approvals / permissions etc shall be in the name of OCPL).All land acquisition & R&R activities(All Documentary cost to be paid by OCPL) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender