Power Government Departments Closing in 9 days TDR #57426375

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate Wi

Issued by Government Departments · Mathura, Uttar Pradesh
Tender Value
8.73 Lakhs
Estimated cost
Bid Submission
19 Sep 2026
9 days left
EMD
8750
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mathura → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 09/11 Mtr Long St Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Different Size On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Lt Xlpe 1X400 Sqmm On The Erected Pcc Pole/Stp/Transformer Including Jumpering As Per Respo Manual. , Installation Of 3Ph 4W Lt Pvm 3X220 V, 4-200 A Direct Connected With Lpr Lt Incomming Pannel With Grouting/Foundation Etc As Per Requirment Of Site. The Work Done As Per Respo Norms Along With All Routine Material To Be Used For Such Works. , Providing & Fixing Of Pg Cl Weasel To Weasel As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Lt Cl With N/B As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Alluminium Binding Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Alluminium Paint As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Jointing Sleeve For Weasel Conductor As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Number Plate As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Danger Board As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of G.I. Barbed Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Stone Pad As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Suspension Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of I Hook With I Bolt As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Dead End Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of 3Ph Distribution Box With Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Pearcing Connector As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Netural Cum Earth Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor.

BOQ

Sl. No. Item TitleItem Description
1Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate.
2Carriage of 09/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)Carriage of 09/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)
3Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
4Erection of Single pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Single pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
5Erection of Double pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.Erection of Double pole structure 09/11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories with grouting in ratio 1:4:8 cement, sand and brick ballast as per standard norms. (Grouting material will be provided by contractor) as per RESPO norms.
6Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)Mounting of 250 KVA Transformer on the Double pole Structures and connections thereof (including Carriage of Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends)
7Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
8Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
9Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
10Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
11Laying, sagging stringing and binding of Arial Bunch Conductor of Different Size on the erected PCC pole/STP including jumpering as per RESPO manual.Laying, sagging stringing and binding of Arial Bunch Conductor of Different Size on the erected PCC pole/STP including jumpering as per RESPO manual.
12Laying, sagging stringing and binding of LT XLPE 1x400 sqmm on the erected PCC pole/STP/Transformer including jumpering as per RESPO manual.Laying, sagging stringing and binding of LT XLPE 1x400 sqmm on the erected PCC pole/STP/Transformer including jumpering as per RESPO manual.
13Installation of 3Ph 4w LT PVM 3x220 V, 4-200 A Direct Connected with LPR LT Incomming Pannel with grouting/Foundation etc as per requirment of site. The work done as per RESPO Norms along with all routine material to be used for such works.Installation of 3Ph 4w LT PVM 3x220 V, 4-200 A Direct Connected with LPR LT Incomming Pannel with grouting/Foundation etc as per requirment of site. The work done as per RESPO Norms along with all routine material to be used for such works.
14Providing & Fixing of PG Clamp weasel to weasel as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of PG Clamp weasel to weasel as per direction of supervising engineer including cost of labour T&P and required material for such work.
15Providing & Fixing of LT Clamp with N/B as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of LT Clamp with N/B as per direction of supervising engineer including cost of labour T&P and required material for such work.
16Providing & Fixing of Alluminium Binding Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Alluminium Binding Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.
17Providing & Fixing of Alluminium Paint as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Alluminium Paint as per direction of supervising engineer including cost of labour T&P and required material for such work.
18Providing & Fixing of Jointing Sleeve for Weasel Conductor as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Jointing Sleeve for Weasel Conductor as per direction of supervising engineer including cost of labour T&P and required material for such work.
19Providing & Fixing of Number Plate as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Number Plate as per direction of supervising engineer including cost of labour T&P and required material for such work.
20Providing & Fixing of Danger Board as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Danger Board as per direction of supervising engineer including cost of labour T&P and required material for such work.
21Providing & Fixing of G.I. Barbed Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of G.I. Barbed Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.
22Providing & Fixing of Stone Pad as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Stone Pad as per direction of supervising engineer including cost of labour T&P and required material for such work.
23Providing & Fixing of Suspension Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Suspension Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.
24Providing & Fixing of I Hook with I Bolt as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of I Hook with I Bolt as per direction of supervising engineer including cost of labour T&P and required material for such work.
25Providing & Fixing of Dead End Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Dead End Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.
26Providing & Fixing of 3Ph Distribution Box with Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of 3Ph Distribution Box with Clamp as per direction of supervising engineer including cost of labour T&P and required material for such work.
27Providing & Fixing of Pearcing Connector as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Pearcing Connector as per direction of supervising engineer including cost of labour T&P and required material for such work.
28Providing & Fixing of Netural cum Earth Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.Providing & Fixing of Netural cum Earth Wire as per direction of supervising engineer including cost of labour T&P and required material for such work.
29Installation of 11 KV Fuse Set as per RESPO NormsInstallation of 11 KV Fuse Set as per RESPO Norms
30Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
31Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.Body and Nutral Earthing of 250 KVA Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work.
32Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor.

AI Tender Summary

OUR REF NO 57426375
AUTHORITY Government Departments
TENDER VALUE 8.73 Lakhs
LAST DATE 19-09-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Carriage Of 09/11 Mtr Long St Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. (Distance 00-70 Kms.) , Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. , Erection Of Single Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Erection Of Double Pole Structure 09/11 Mtrs Long St Pole By Digging Of Pits Fitting Of All Relevant Accessories With Grouting In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms. (Grouting Material Will Be Provided By Contractor) As Per Respo Norms. , Mounting Of 250 Kva Transformer On The Double Pole Structures And Connections Thereof (Including Carriage Of Transformer From Store Centre, Mathura To Site Of Work With Loading & Unloading At Both Ends) , Construction Of Section Pole/T Pole For L.T./H.T. Line On The Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P, Etc. Required For Proper Completion Of Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor Of Different Size On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Lt Xlpe 1X400 Sqmm On The Erected Pcc Pole/Stp/Transformer Including Jumpering As Per Respo Manual. , Installation Of 3Ph 4W Lt Pvm 3X220 V, 4-200 A Direct Connected With Lpr Lt Incomming Pannel With Grouting/Foundation Etc As Per Requirment Of Site. The Work Done As Per Respo Norms Along With All Routine Material To Be Used For Such Works. , Providing & Fixing Of Pg Cl Weasel To Weasel As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Lt Cl With N/B As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Alluminium Binding Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Alluminium Paint As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Jointing Sleeve For Weasel Conductor As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Number Plate As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Danger Board As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of G.I. Barbed Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Stone Pad As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Suspension Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of I Hook With I Bolt As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Dead End Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of 3Ph Distribution Box With Cl As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Pearcing Connector As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Providing & Fixing Of Netural Cum Earth Wire As Per Direction Of Supervising Engineer Including Cost Of Labour T&P And Required Material For Such Work. , Installation Of 11 Kv Fuse Set As Per Respo Norms , Construction Of Plinth Of 250 Kva T/F Size 5X5x4 Above Ground Level And One. Ft. Below The Ground Level Of 9 After Excavation Of 4 Earth Brick Ballast Shall Be Provided And Hammering Will Be Done Properly. After That A Retaining Wall Of 9 Width By First Class Brick In Ratio 1:4 Of Cement And Sand Shall Be Made. The Earth Shall Be Filled Up To One Ft. Below The Top Of The Plinth. After This Brick Ballast Shall Be Provided Upto 6 From The Earth Level And Proper Hammering Shall Be Done. One No. Jall Of 12 Mm. Ms Tore Shall Be Fixed In The Hollow Of Plinth And One. Ft. Thick Rcc In Ration Of Cement, Sand And Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm. Thick Plastering Shall Be Done All Around The Plinth In 1:4 Ratio Of Cement And Sand. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Body And Nutral Earthing Of 250 Kva Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor.
Basic Detail
Tender No GEM/2026/B/8016175
Bidding Type Tender
Location
City Mathura
State Uttar Pradesh
Key Dates
Publish Date 09 Sep 2026
Submission Date 19 Sep 2026
Open Date 20 Sep 2026
Finance
Tender Value 8.73 Lakhs
Tender Fee Ref. Documents
EMD 8750
Exemption Not Available
Document List
38c14cc8-86a8-4abe-a81f-a4f11d152344.pdf
1788943211.xlsx
1788943254.pdf
1788943258.pdf
1788943262.pdf
1788943266.pdf
1788943269.pdf
1788943293.pdf
ATC22_daa256ae-f5b4-43bf-b3571788943366348_EDC1MATHURABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Sep 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

38c14cc8-86a8-4abe-a81f-a4f11d152344.pdf

xlsx

1788943211.xlsx

pdf

1788943254.pdf

pdf

1788943258.pdf

pdf

1788943262.pdf

pdf

1788943266.pdf

pdf

1788943269.pdf

pdf

1788943293.pdf

pdf

ATC22_daa256ae-f5b4-43bf-b3571788943366348_EDC1MATHURABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders