Tender For Renovation Work Of Rajkiya Middle School Laiyo, Block-Mandu, Dist-Ramgarh.
Tender Value
7 Lakhs
Estimated cost
Bid Submission
15 Sep 2026
0 days left
EMD
1.53 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ramgarh → Jharkhand
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Renovation Work Of Rajkiya Middle School Laiyo, Block-Mandu, Dist-Ramgarh.
BOQ
| Sl. No. | Item Description |
| 1 | Extra for cleaning the old surface by scrapping the entire old white wash or colour wash including cost of scaffolding all complete as per direction of E/I. |
| 2 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 3 | Providing 12 mm thick Cement plaster (1:6) with clean coarse sand of F.M.1.5 including screening, curing eith all leads and lifts of water, scaffilding taxes and royalty all complete as per building specification and direction E/I |
| 4 | Providing 6mm cement plaster (1:4) in celling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 5 | Providing and applying plaster of paris putty of 2 mm thickness overplastered surface to prepare the surface even and smooth complete. |
| 6 | Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by the rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification and direction of E/I. |
| 7 | Providing two coat of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface throughly , scaffolding and taxes all after removing dirt including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction of E/I. |
| 8 | Finishing walls with Premium Acrylic Smooth exterior paint with Siliconeadditives of required shade.New work (Two or more coats applied @ 1.43 ltr/10 sqm overand including priming coat of exterior primer applied @ 0.90litre/10 sqm) |
| 9 | Water proofing for old and New Roof Slab : - Providing and laying water proofing treatment on roof slab by applying two Component, factory designed, ready to use, acrylic modified flexible material applied with brush, roller or spray for water proofing coating as per manufacturer specifications with following steps:-roove of PCC surface should be filled with Polysulphide Sealant. (Paid Separately) Brand - Sika India Pvt. Ltd./MYK Schomberg/Dr. Fixit/Fosroc. Warantly for five years. |
| 10 | Covering of treated surface with PCC :- Providing 25mm thick cement concrete M-50 (1:1.5:3) maintaining slope in alternate 2 mt x 2 mt panels with approved quality of stone chips of 20mm to 6mm size graded and cleaned sand of F.M. to 3 including screening, shuttering and mixing cement concrete in mixer with admixture in integral water proofing and placing in position, skirting curing, taxes and roaylty all complete as per building specification and directions of E/I. Panels that has been left should be casted next day. There should be 6mm gap between Panels Brand-Sika-plastocrate plus, MYK proof WP 10, Fosroc-Conplast X 4211C, Dr. Fixit Pidproof LW+ or equivalent. |
| 11 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. |
| 12 | Providing and laying Double Charge vitrified floor tiles in Different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and confirming to IS 15622/ISO 13006, of approved make , in all colour and shades laid on 20mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointed with grey cement [email protected] kg /sqm including grouting the joints with white cement and matching pigment etc.Size of tiles 600x600mm |
| 13 | providing 250 mm wide brick drain in cement mortar (1:6) with av. 150 mm clear depth and 250 mm apron including cost of e/w involved with 75 mm cement concrete (1:4:3) over one brick designation 100A flat soling …do..do.. |
| 14 | Supplying , fitting and fixing M.S grill made of 20 X 6mm. M.S flat/ square bars as per approved design & drawing, properly fibricated with joints contiuous fillet welded and finished smooth, carriage of grill to work site, hoisting as per building specification and direction of E/I. DOOR AND WINOW |
| 15 | Supplying fitting and fixing 20 gauge GCI sheet gate fitted on Msangle frame of size 60 x 60 x 6 mm including cost of fabrication providing necessary locking arrangement with haskal and dommy duly fixed in PCC (1:2:4 ) block of required sizeapplying apriming lead paint over steel work taxes all complete as per building specification and direction of E/I |
| 16 | Earthwork in exacavation in foundation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M including all lifts, levelling, ramming the foundation ... E/I. |
| 17 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) |
| 18 | Providing designation 75 B one brick flat joints filled with local sand including cost of watering taxes royality all complete as per building specification and direction of E/I. |
| 19 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 20 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts |
| 22 | RCC work in wall (any thikness) incuding attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutment,posts and struts etc above plinth level up to floors five level,execludind the cost of centering,shuttering,finishing and reinforcement,with 1:1.5:3( 1cement:1.5 coarse sand zone-iii: 3 graded stone aggregate 20 mm nominal size) |
| 23 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and StrutS |
| 24 | RCC work in beams, suspended floors,roofs having slope up to 15 degree landing, balcony, shelves, chajja, lintels, bands plain window sills staircase and spirel stair cases above plinth level up to five level execludind the cost of centering,shuttering,finishing and reinforcement,with 1:1.5:3( 1cement:1.5 coarse sand zone-iii: 3 graded stone aggregate 20 mm nominal size) |
| 25 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 26 | Providing TMT steel reinforcement of 10 mm-16mm. Dia. Rods as per approved design and drawing excluding carriage of TMT bars to work site, ...E/I. |
| 27 | Providing designation 75B brick work in C.M. (1:6) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 28 | Providing 12 mm cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water. Scaffolding ...E/I. |
| 29 | Supplying, fitting and fixing M.S. grill made of 20x6mm M.S. flat as per approved design and drawing, properly fabricated with joints continuous fillet welded and finished smooth , carriage of grill to work site, hoisting as per building specification and direction of E/l. (where materials is not supplied by the deptt.) |
| 30 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. |
| 31 | Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing dust, dirt, scales smokes and grease and cleaning the surface throughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. (Mode of measurement area shall be multiplied by the co-efficient as indicated in building specification) |
| 32 | Providing two coats of synthetic enamel paint of apporoved shade and make over steel surface thoroughly scaffolding and taxes all complete as per building specification and direction of E/I. |
| 33 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 34 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling, ramming the foundation trenches, removing roots of trees shurbs all complete as per approved design building specification and direction of E/I. |
| 35 | Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 36 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) |
| 37 | Providing and laying factory made chamfered edge Cement Concrete paver blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & direction of Engineer- in-Charge.80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. |
| 38 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level.1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 39 | Carriage of MaterialBricks - |
| 40 | Sand - |
| 41 | Chips - |
| 42 | Metal - |
| 43 | Cement |
| 44 | Steel |
| 45 | Add GST @ 18 % |
| 46 | Add L.Cess @ 1 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodaySep 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.