Chemicals and Fertilizers Government Departments Closing in 20 days TDR #57419877

Bids Are invited for Custom Bid For Services - Maintenance Of Heat Exchangers Vessels And Columns In Phenol Plant Pru, Fractionation And Tar Cracking - 101-V-006 (Feed Coalescer) Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 A (C-00

Issued by Government Departments · Ernakulam, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 Sep 2026
20 days left
EMD
38300
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Maintenance Of Heat Exchangers Vessels And Columns In Phenol Plant Pru, Fractionation And Tar Cracking - 101-V-006 (Feed Coalescer) Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 A (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger] Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 B (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-002 (C-001 Overhead Condenser) [Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , 101E004 (C-002 Overhead Condenser) (Fixed Head Straight Tube Exchanger)- Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-006A (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , 101 E-006 B (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , C-4501 (Crude Acetone Column) Maintenance As Per The Scope Of Work , C-4503 (Tar Column) Maintenance As Per The Scope Of Work , E-4501 A (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4501 B (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E4502- (C.A.C Overhead Condenser) - Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4509 (Tar Column Re-Boiler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4517(Phenol Column Overhead Condenser) )[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E-4522 (Return Header Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4515 A ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-4515 B ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-5001 A (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 B (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 C (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 D (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 E (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4505A (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , E-4505 B (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4506 (Acetone Product Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4510 (Tar Column Over Head Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work.* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , J-4501A (Ejector Cooler Fractionation-I) -Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , J-4501B (Ejector Cooler Fractionation-Ii)-Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4512 (A M S Column Overhead Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E5003 - (Hydrogenation Product Condenser) )[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Wor , E-5507(Furnace Charge Pump Spillback Cooler)[Fixed Head Fin U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , E 5508 (Tar Cracking Pre-Heater) [U Tube Heat Exchanger] - Maintenance And Hydrotesting As Per The Scope Of Work.

BOQ

Sl. No. Item TitleItem Description
1101-V-006 (FEED COALESCER) MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101-V-006 (FEED COALESCER) MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
2101 E-001 A (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER] MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101 E-001 A (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER] MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
3101 E-001 B (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101 E-001 B (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
4101 E-002 (C-001 OVERHEAD CONDENSER) [FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101 E-002 (C-001 OVERHEAD CONDENSER) [FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
5101E004 (C-002 OVERHEAD CONDENSER) (FIXED HEAD STRAIGHT TUBE EXCHANGER)- MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101E004 (C-002 OVERHEAD CONDENSER) (FIXED HEAD STRAIGHT TUBE EXCHANGER)- MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
6101 E-006A (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK101 E-006A (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK
7101 E-006 B (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK101 E-006 B (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
8C-4501 (CRUDE ACETONE COLUMN) MAINTENANCE AS PER THE SCOPE OF WORKC-4501 (CRUDE ACETONE COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK
9C-4503 (TAR COLUMN) MAINTENANCE AS PER THE SCOPE OF WORKC-4503 (TAR COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK
10E-4501 A (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4501 A (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
11E-4501 B (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4501 B (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
12E4502- (C.A.C OVERHEAD CONDENSER) - DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.E4502- (C.A.C OVERHEAD CONDENSER) - DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.
13E-4509 (TAR COLUMN RE-BOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4509 (TAR COLUMN RE-BOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
14E-4517(PHENOL COLUMN OVERHEAD CONDENSER) )[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.E-4517(PHENOL COLUMN OVERHEAD CONDENSER) )[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.
15E-4522 (RETURN HEADER COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4522 (RETURN HEADER COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
16E-4515 A ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.E-4515 A ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
17E-4515 B ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.E-4515 B ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
18E-5001 A (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5001 A (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
19E-5001 B (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5001 B (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
20E-5001 C (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5001 C (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
21E-5001 D (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5001 D (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
22E-5001 E (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5001 E (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
23E-4505A (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORKE-4505A (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK
24E-4505 B (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4505 B (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
25E-4506 (ACETONE PRODUCT COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-4506 (ACETONE PRODUCT COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
26E-4510 (TAR COLUMN OVER HEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.E-4510 (TAR COLUMN OVER HEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.
27J-4501A (EJECTOR COOLER FRACTIONATION-I) -DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.J-4501A (EJECTOR COOLER FRACTIONATION-I) -DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.
28J-4501B (EJECTOR COOLER FRACTIONATION-II)-DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.J-4501B (EJECTOR COOLER FRACTIONATION-II)-DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK.
29E-4512 (A M S COLUMN OVERHEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.E-4512 (A M S COLUMN OVERHEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED.
30E5003 - (HYDROGENATION PRODUCT CONDENSER) )[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORE5003 - (HYDROGENATION PRODUCT CONDENSER) )[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WOR
31E-5507(FURNACE CHARGE PUMP SPILLBACK COOLER)[FIXED HEAD FIN U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORKE-5507(FURNACE CHARGE PUMP SPILLBACK COOLER)[FIXED HEAD FIN U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
32E 5508 (TAR CRACKING PRE-HEATER) ['U' TUBE HEAT EXCHANGER] - MAINTENANCE AND HYDROTESTING AS PER THE SCOPE OF WORK.E 5508 (TAR CRACKING PRE-HEATER) ['U' TUBE HEAT EXCHANGER] - MAINTENANCE AND HYDROTESTING AS PER THE SCOPE OF WORK.

AI Tender Summary

OUR REF NO 57419877
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 30-09-2026
Authority
Authority Name Hindustan Organic Chemicals Limited
Work Description Bids Are invited for Custom Bid For Services - Maintenance Of Heat Exchangers Vessels And Columns In Phenol Plant Pru, Fractionation And Tar Cracking - 101-V-006 (Feed Coalescer) Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 A (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger] Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 B (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-002 (C-001 Overhead Condenser) [Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , 101E004 (C-002 Overhead Condenser) (Fixed Head Straight Tube Exchanger)- Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-006A (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , 101 E-006 B (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , C-4501 (Crude Acetone Column) Maintenance As Per The Scope Of Work , C-4503 (Tar Column) Maintenance As Per The Scope Of Work , E-4501 A (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4501 B (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E4502- (C.A.C Overhead Condenser) - Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4509 (Tar Column Re-Boiler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4517(Phenol Column Overhead Condenser) )[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E-4522 (Return Header Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4515 A ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-4515 B ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-5001 A (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 B (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 C (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 D (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 E (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4505A (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , E-4505 B (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4506 (Acetone Product Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4510 (Tar Column Over Head Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work.* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , J-4501A (Ejector Cooler Fractionation-I) -Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , J-4501B (Ejector Cooler Fractionation-Ii)-Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4512 (A M S Column Overhead Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E5003 - (Hydrogenation Product Condenser) )[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Wor , E-5507(Furnace Charge Pump Spillback Cooler)[Fixed Head Fin U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , E 5508 (Tar Cracking Pre-Heater) [U Tube Heat Exchanger] - Maintenance And Hydrotesting As Per The Scope Of Work.
Basic Detail
Tender No GEM/2026/B/8013745
Bidding Type Tender
Location
City Ernakulam
State Kerala
Key Dates
Publish Date 09 Sep 2026
Submission Date 30 Sep 2026
Open Date 01 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 38300
Exemption Available
Document List
52ea4043-86ba-4c68-b215-f0643342ab44.pdf
1788927813.xlsx
1788928283.pdf
1788928288.pdf
1788928298.pdf
1788928309.pdf
1788928316.pdf
1788928319.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Oct 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
pdf

52ea4043-86ba-4c68-b215-f0643342ab44.pdf

xlsx

1788927813.xlsx

pdf

1788928283.pdf

pdf

1788928288.pdf

pdf

1788928298.pdf

pdf

1788928309.pdf

pdf

1788928316.pdf

pdf

1788928319.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders