Bids Are invited for Custom Bid For Services - Maintenance Of Heat Exchangers Vessels And Columns In Phenol Plant Pru, Fractionation And Tar Cracking - 101-V-006 (Feed Coalescer) Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 A (C-00
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Maintenance Of Heat Exchangers Vessels And Columns In Phenol Plant Pru, Fractionation And Tar Cracking - 101-V-006 (Feed Coalescer) Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 A (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger] Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-001 B (C-001 Feed Bottom Heat Exchanger) [Fixed Head U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-002 (C-001 Overhead Condenser) [Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , 101E004 (C-002 Overhead Condenser) (Fixed Head Straight Tube Exchanger)- Maintenance & Hydrotesting As Per The Scope Of Work , 101 E-006A (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , 101 E-006 B (C3 C4 Stream Cooler)[Fixed Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , C-4501 (Crude Acetone Column) Maintenance As Per The Scope Of Work , C-4503 (Tar Column) Maintenance As Per The Scope Of Work , E-4501 A (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4501 B (C.A.C. Reboiler)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E4502- (C.A.C Overhead Condenser) - Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4509 (Tar Column Re-Boiler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4517(Phenol Column Overhead Condenser) )[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E-4522 (Return Header Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4515 A ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-4515 B ( Ams Bottom Product Cooler) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work. , E-5001 A (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 B (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 C (Hydrogenation Effluent Feed Exchanger)[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 D (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-5001 E (Hydrogenation Effluent Feed Exchanger) [Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4505A (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance &Hydrotesting As Per The Scope Of Work , E-4505 B (Fac Bottom Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4506 (Acetone Product Cooler)[Fixed Head Fin-U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work , E-4510 (Tar Column Over Head Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work.* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , J-4501A (Ejector Cooler Fractionation-I) -Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , J-4501B (Ejector Cooler Fractionation-Ii)-Dropping Down The Exchanger With Tube Bundle Assembly To Ground Level, Maintenance & Hydrotesting As Per The Scope Of Work.* The Required Crane Will Be Provided By Hocl At Free Of Cost, As Per The Scope Of Work. , E-4512 (A M S Column Overhead Condensor)[Floating Head Straight Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Work* Tube Bundle Pull Out And Dropping Down To Ground Level Is Not Required. , E5003 - (Hydrogenation Product Condenser) )[Fixed Head U-Tube Exchanger]-Maintenance & Hydrotesting As Per The Scope Of Wor , E-5507(Furnace Charge Pump Spillback Cooler)[Fixed Head Fin U-Tube Exchanger]Maintenance & Hydrotesting As Per The Scope Of Work , E 5508 (Tar Cracking Pre-Heater) [U Tube Heat Exchanger] - Maintenance And Hydrotesting As Per The Scope Of Work.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | 101-V-006 (FEED COALESCER) MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101-V-006 (FEED COALESCER) MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 2 | 101 E-001 A (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER] MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101 E-001 A (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER] MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 3 | 101 E-001 B (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101 E-001 B (C-001 FEED BOTTOM HEAT EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 4 | 101 E-002 (C-001 OVERHEAD CONDENSER) [FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101 E-002 (C-001 OVERHEAD CONDENSER) [FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 5 | 101E004 (C-002 OVERHEAD CONDENSER) (FIXED HEAD STRAIGHT TUBE EXCHANGER)- MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101E004 (C-002 OVERHEAD CONDENSER) (FIXED HEAD STRAIGHT TUBE EXCHANGER)- MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 6 | 101 E-006A (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK | 101 E-006A (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK |
| 7 | 101 E-006 B (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | 101 E-006 B (C3 C4 STREAM COOLER)[FIXED HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 8 | C-4501 (CRUDE ACETONE COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK | C-4501 (CRUDE ACETONE COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK |
| 9 | C-4503 (TAR COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK | C-4503 (TAR COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK |
| 10 | E-4501 A (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4501 A (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 11 | E-4501 B (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4501 B (C.A.C. REBOILER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 12 | E4502- (C.A.C OVERHEAD CONDENSER) - DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. | E4502- (C.A.C OVERHEAD CONDENSER) - DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. |
| 13 | E-4509 (TAR COLUMN RE-BOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4509 (TAR COLUMN RE-BOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 14 | E-4517(PHENOL COLUMN OVERHEAD CONDENSER) )[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. | E-4517(PHENOL COLUMN OVERHEAD CONDENSER) )[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. |
| 15 | E-4522 (RETURN HEADER COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4522 (RETURN HEADER COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 16 | E-4515 A ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK. | E-4515 A ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK. |
| 17 | E-4515 B ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK. | E-4515 B ( AMS BOTTOM PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK. |
| 18 | E-5001 A (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5001 A (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 19 | E-5001 B (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5001 B (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 20 | E-5001 C (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5001 C (HYDROGENATION EFFLUENT FEED EXCHANGER)[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 21 | E-5001 D (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5001 D (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 22 | E-5001 E (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5001 E (HYDROGENATION EFFLUENT FEED EXCHANGER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 23 | E-4505A (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK | E-4505A (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE &HYDROTESTING AS PER THE SCOPE OF WORK |
| 24 | E-4505 B (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4505 B (FAC BOTTOM COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 25 | E-4506 (ACETONE PRODUCT COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-4506 (ACETONE PRODUCT COOLER)[FIXED HEAD FIN-U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 26 | E-4510 (TAR COLUMN OVER HEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. | E-4510 (TAR COLUMN OVER HEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. |
| 27 | J-4501A (EJECTOR COOLER FRACTIONATION-I) -DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. | J-4501A (EJECTOR COOLER FRACTIONATION-I) -DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. |
| 28 | J-4501B (EJECTOR COOLER FRACTIONATION-II)-DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. | J-4501B (EJECTOR COOLER FRACTIONATION-II)-DROPPING DOWN THE EXCHANGER WITH TUBE BUNDLE ASSEMBLY TO GROUND LEVEL, MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.* THE REQUIRED CRANE WILL BE PROVIDED BY HOCL AT FREE OF COST, AS PER THE SCOPE OF WORK. |
| 29 | E-4512 (A M S COLUMN OVERHEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. | E-4512 (A M S COLUMN OVERHEAD CONDENSOR)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK* TUBE BUNDLE PULL OUT AND DROPPING DOWN TO GROUND LEVEL IS NOT REQUIRED. |
| 30 | E5003 - (HYDROGENATION PRODUCT CONDENSER) )[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WOR | E5003 - (HYDROGENATION PRODUCT CONDENSER) )[FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WOR |
| 31 | E-5507(FURNACE CHARGE PUMP SPILLBACK COOLER)[FIXED HEAD FIN U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK | E-5507(FURNACE CHARGE PUMP SPILLBACK COOLER)[FIXED HEAD FIN U-TUBE EXCHANGER]MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK |
| 32 | E 5508 (TAR CRACKING PRE-HEATER) ['U' TUBE HEAT EXCHANGER] - MAINTENANCE AND HYDROTESTING AS PER THE SCOPE OF WORK. | E 5508 (TAR CRACKING PRE-HEATER) ['U' TUBE HEAT EXCHANGER] - MAINTENANCE AND HYDROTESTING AS PER THE SCOPE OF WORK. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender