Tender For Reconstruction Work Of South Coating Work From Sewatari Main Road In Srinagar. (Including 05 Years Maintenance Charge) (1/2)
Tender Overview
Project Description
Tender for Reconstruction Work Of South Coating Work From Sewatari Main Road In Srinagar. (Including 05 Years Maintenance Charge) (1/2)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Sep-2026 | Completion of works Corrigendum | Other | 15-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5, MORD Sr. No. 3.4 (Including labour cess but GST will be paid extra as applicable) |
| 2 | WBM Grading-3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405(3)(A), MORD Sr.No. 4.7 By Manual Means. (Including labour cess but GST will be paid extra as applicable) |
| 3 | CC- Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, OPC pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501, MORD Sr. No. 6.4/1500 (Including labour cess but GST will be paid extra as applicable) |
| 4 | Construction of Subgrade and Earthen Shoulders/Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1(B), MORD Sr. No. 3.14. (Including labour cess but GST will be paid extra as applicable) |
| 5 | Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703 (ii), MORD Sr No. 10.10 Ordinary Kilometer Stone (Precast) (Including labour cess but GST will be paid extra as applicable) |
| 6 | Kilometre Stone / Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703(iii), MORD Sr No. 10.10 200 m stone (precast) (Including labour cess but GST will be paid extra as applicable) |
| 7 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Zero Maintenance cost and 2nd year Total construction of cost Item No. 1 to 6 Rs 3315990.00 @ 0.25% |
| 8 | 3rd Year cost of BOQ @ 0.50% in Item No. 1 to 6 |
| 9 | 4rth Year cost of BOQ @ 0.75% in Item No. 1 to 6 |
| 10 | 5rth Year cost of BOQ @ 1% in item no. 1 to 6 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender