Tender For Mtps I Ca Cws Ii Unit Iii Overhauling And Painting Of Sludge Disposal Pump And Cold Hot Water Tunnel Vent Valves Air Vent Valves Gate Valves Non Return Valve And Painting Of Safety Grills Handrails Oil Line Hub Arm Sleeves Etc
Tender Overview
Project Description
Tender for Mtps I Ca Cws Ii Unit Iii Overhauling And Painting Of Sludge Disposal Pump And Cold Hot Water Tunnel Vent Valves Air Vent Valves Gate Valves Non Return Valve And Painting Of Safety Grills Handrails Oil Line Hub Arm Sleeves Etc
BOQ
| Sl. No. | Item Description |
| 1 | Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling. |
| 2 | Charges for complete alignment & checking the operation of clarifier sludge disposal pumps motor, sludge disposal pumps and its suction & delivery pipe lines and its 150 mm gate valves. |
| 3 | Charges for Overhauling of 150 / 200 mm size, 1 No.125 mm NRV and 150 / 300 Class Gate valves of Cold & Hot water Tunnel Vent in Cooling Water system II including dismantling of vent pipe, complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling. |
| 4 | Charges for cutting and removal of existing eroded / corroded G.I safety grill inside fan stack area of cooling tower - III. |
| 5 | Charges for Petty Iron Works for fabrication of safety grill and M.S. plate as per the required dimension inside fan stack area of Cooling Tower - III which includes cutting charges welding charges. |
| 6 | Charges for renewal of new fabricated safety grill and M.S. plate by positioning, fixing & welding inside the fan stack area which includes welding charges. |
| 7 | Charges for removing the existing grills & leading from inside fan stack to outside fan stack, cleaning and re fixing the painted grills at its existing position properly with tag welding inside the fan stack. |
| 8 | Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of coal thar black Paint one over the other with proper intervals for tunnel vent valves, air vent valves. |
| 9 | Charges for cleaning and painting with one coat of Epoxy red oxide primer, Two coats of first quality epoxy grey paint of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars, drive shaft assembly and FRP fan blades in Cooling Tower-III. |
| 10 | Charges for Cleaning and painting with two coats of Heat Resistant Aluminum paint on safety grills, hand rails inside Fan stack area in Cooling Tower-III. |
| 11 | Cost of Neoprene Rubber(Black) Gasket, Size, 1 M X 2 M X 5 MM thick For Sl.No.3 |
| 12 | Cost of 6 mm plate for sl.no.5 |
| 13 | Cost of cutting gas for Sl.no.4,5& 6 |
| 14 | Cost of welding electrodes Sl.no.5,6 |
| 15 | Cost of Heat Resistant Aluminium paint for sl.no.10 |
| 16 | Cost of Enamel Thinner for Sl. No.10 |
| 17 | Cost of Golden Yellow /Black Enamel for Sl.no.10 |
| 18 | Cost of Rust Convertor For Sl.No.8 |
| 19 | Cost of Epoxy Thinner for SL.No.8 & 9 |
| 20 | Cost of Epoxy red oxide primer for SL.No.8 & 9 |
| 21 | Cost of Coal thar black paint For Sl.No.8 |
| 22 | Cost of Epoxy Smoke gray paint for SL.No.9 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender